RERA Received Date
Completion Date
RERA ID
26.893988
81.153636
Plots will be demarcated as per MAP approved by Jila Panchayat Barabanki
9" thick and 7" height boundary wall, the proper foundation and frame structure of RCC and constructed
inside the project- Trimix concrete flooring
Provision of both side foothpath of the road construction with red heavy duty tiles
submersible pump system will be installed for individual tower, the ground water will be pumped through the pump with capacity to 2000 ltr water tank.
soil and waste from building is connected to external manhole and diverted to STP
External drainage is connected via manhole and collected to rainwater harvesting
Park consist a lawn and tree at periphery
Trees with attractive flowering
Provision as per Project Approved, Provision Of Both Side Street Light
Not Applicable
Provision of sewage treatment plant (STP)
The Dustbins will be installed, Thereon the garbage will be Disposed off to the Specify location by the Jila Panchyat
Rain Water Harvesting is proposed to conserve rainwater and water efficient fixtures used
Not Applicable
Not Applicable
Not Applicable
Having Staircase for Emergency Evacuation Service
Not Applicable
Showing 16 blocks with 64 units
Total Carpet Area
3815.04 m²
41064.71 ft²
Total Units
64
1 different types
Blocks & Floors
16
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2945.00 m²
31699.69 ft²