Showing 32 blocks with 128 units
Total Carpet Area
7591.76 m²
81716.95 ft²
Total Units
128
1 different types
Blocks & Floors
32
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7020.00 m²
75562.58 ft²
completed on site
9" thick and7 feet heiht boundary wall , the proper foundation, and frame structure of RCC and constructed with red brick.
internal road 25 feet wide bitumen, and from the entry gate to park road made with grey concrete tiles.
provision of both side footpath of the road construction with, red and grey heavy duty tiles.
provision of overhaed water tank for drinking water facility.
The soil and waste from toilet and kitchen will be collected in gully trap and manhole in single network of S.W./R.C.C. pipes laid underground having manhole/inspection chambers at appropriate intervals and shall be discharged into proposed STP .
provision,both side of the road, semi-open drainage channel
park consist, a lawn, and trees at periphery.
trees with colonial canopy with attractive flowering. trees with branching at 10 feet amd above . trees with medium spreading branches to avoid obstructio to the traffic , fruit trees to be avoided because children may obstruct traffic and general movement of public. and number of treee as required.
provision as per requirement. and provision of both side street light
Not applicable
provison of sewage treatment plant (STP) capacity as per reqirement of Occupancy.
The solid waste genertaed from project will be mainly domestic in nature.The solid waste shall be first segregated as bio-degrable and non boi-degrable seprately . The Recyclabele inorganic waste will be sold to registered buyers. The biodegrable wastes will be transfered into dlab ghar as propsed on site for desposal by municipal authority/hired.
provision of rainwater harvesting as required
provision of solar light panels.
for fire protection , provision of overhead water tank (capacity as required) and provision of external hydrant through riser for fire brigade inlet.
not applicable
not applicable
Gate
Miracle Homes is located in Barabanki.
Yes. Miracle Homes is registered under UPRERAPRJ467572 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Miracle Homes is 2 August 2025.
Miracle Homes is developed by MAXMIRACLE BUILDCARE LLP.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.