AS PER THE SANCTIONED MAP APPROVED BY THE LDA
Boundary wall shall be commenced as soon as the construction work shall be started.
Internal road designed for different ROW as per the requirement.
Footpath shall be provided as per the layout.
MUNICIPAL DRINKING WATER SUPPLY PLAN SHALL BE USED FOR DRINKING WATER PURPOSES
Sewerage system shall be used with STP as per the design calculation.
Separate drainage line shall be used as per the design calculations.
landscape area shall be provided as per the local building byelaws.
As per the layout.
PROVISIONS SHALL BE MADE OF ROOF SOLAR PANELS AND LIGHT. Street Light shall be as per the layout.
AS PER APPROVED LAYOUT
Disposal system of the sewage and sullage water shall be used through STP for the purpose of landscaping and flushing.
All the solid waste managed as per the biodegradable waste converted into compost and non biodegradable delivered to waste management as per the design.
Low flow water fixtures shall be used for water conservation and STP water is used for landscaping and flushing purpose.
AS PER LAYOUT.
shall be provided as per Fire drawings and National Building Code.
Social infrastructures and other public amenities including public health services shall be provided as per local building byelaws.
shall be as per the environment management plan and disaster management plan. All provisions are made including assembly point.
shall be made as per the approved layout.
Showing 1 blocks with 126 units
Total Carpet Area
18140.34 m²
195260.81 ft²
Total Units
847
3 different types
Blocks & Floors
1
19 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
7373.56 m²
79368.26 ft²