Launch Date
Completion Date
RERA ID
28.351616
79.517155
As per layout plan.
R.C.C. Framed, Brick wall 2.0 mt height work in column and beam.
One layer of 100 mm thick GSB + 2 layers of 100 mm thick + 75 mm thick BM + 25 mm thick BC with topcoat & seal-coat.
60 mm thick R.C.C blocks
Supply from under ground water tank
Underground Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment & disposal. STP of 300 KLD for sewage treatment.
Underground water system shall be provided. Storm water from roads and other landscape area shall be connected to the storm water drain and go the Rain water harvesting pits.
Green grass with plants & walkways, benches etc.
Various type of trees all around the park boundary wall & green area.
Designing & implement the system as per local electricity Board norms.
Not Applicable
Underground Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment & disposal. STP of 300 KLD for sewage treatment.
Garbage/Dustbin area located in different places for the solid waste collection & disposal.
Rain water Harvesting as mentioned in point of Drain.
35% Solar street lights fitting in external area and LED lights.
Not Applicable
As per approved layout
Not Applicable
Not Applicable
Total Area
76588.00 m²
824385.57 ft²