NewActive

MALIK COMMERCIAL COMPLEX

Lucknow, Uttar Pradesh
15-10-2023
Launch Date
New
Type
31-07-2028
Completion Date

Overview

Launch Date

Invalid Date

Completion Date

31-07-2028

RERA ID

UPRERAPRJ481275

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)1302
Project NameMALIK COMMERCIAL COMPLEX
Registration Fee (in Rs.)24000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)58
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date15-10-2023
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)1700
Proposed Completion Date31-07-2028

Location

Latitude

26.7650720

Longitude

80.9576478

Bank Details

Account Details
Name of the AccountKRISHAN PAL COLLECTION ACCOUNT FOR MALIK COMMERCIAL COMPLEX
Account Number730905000560
Bank NameICICI BANK
Branch NameICICI BANK LTD
Branch AddressSector 2D Vrindavan Yojna Lucknow 226029.
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0007309
Separate Account Details
Name of the AccountKRISHAN PAL SEPARATE BANK ACCOUNT FOR MALIK COMMERCIAL COMPLEX
Account Number730905000561
Bank NameICICI BANK
Branch NameICICI BANK LTD
Branch AddressSector 2D Vrindavan Yojna Lucknow 226029
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0007309
Transaction Account Details
Name of the AccountKRISHAN PAL RERA TRANSACTION ACCOUNT FOR MALIK COMMERCIAL COMPLEX
Account Number730905000559
Bank NameICICI BANK
Branch NameICICI BANK LTD
Branch AddressSector 2D Vrindavan Yojna Lucknow 226029
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0007309

Development Works

Demarcation of Plots

Demarcation is provided by Development authority i.e. UTTAR PRDESH AWAS EWAM VIKAS PARISHAD , as the plot under consideration is developed by UPAVP , plot is situated in Vrindavan Yojna Lucknow in sector 11 , also drwaing for construction is approved by UPAVP.

Boundary Wall

Being a commercial complex , having all 4 sides roads , UPAVP approved the drawing without boundary wall therefore no boundary wall will be constructed.

Road Work

Roads already exist. As the plot is situated in the developed colony developed by development authority i.e. UPAVP. Roads were constructed by UPAVP. Two side roads are 30 m and third side is 18 m and fourth side is 09 m.

Footpaths

Footpaths already exist. Outside footpaths already exists as provided by development authority i.e. UPAVP , internal footpaths will be provided as per approved drawing.

Water Supply Including Drinking Water Facilities

Water supply is provided by development authority i.e. UPAVP/Nagar Nigam and internal water supply will be provided as per approved drawing , through PVC pipes.

Sewer System

Sewer system is provided by development authority i.e. UPAVP/Nagar Nigam and internal sewer system will be provided as per drawing , through PVC pipes.

Drain

Will be provided internally as per drawing , through PVC pipes.

Parks

Park and horticulture will be planned as per the approved plan of the development authority i.e. UPAVP.

Tree Planting

Will be done as per approved drawing , 13 trees will be planted as per the government norms.

Design For Electric Supply Including Street Lighting

Street lighting is provided by development authority i.e. UPAVAP/Nagar Nigam and internal electric supply will be provided in 51 shops and 01 commercial hall and 04 sided setbacks as per requirement.

Community Buildings

Not Applicable.

Treatment and Disposal System of Sewage and Sullage water

Not Applicable.

Solid Waste Management And Disposal System

Plot is situated in Vrindavan Yojna of UPAVP, STP is provided in Vrindavan Yojna by development authority i.e. UPAVP , internal solid waste management and disposal system will be provided as per norms.

Water Conservation System

Water conservation will be done through rain water harvesting pit.

Energy Management System Including Use of Renewable Energy

300 KW power load of electric supply , of multiple points has been sanctioned by the electricity department of Lucknow, Solar panels on Roof Top will be provided for renewable energy.

Fire Protection And Fire Safety System

Sprinklers will be provided in the complex and all fire fighting equipments including water line, pumping system and separate water tank will be provided as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure and other public amenities including public health services will be provided as per the norms.

Emergency Evacuation Services

Separate stairs , outer side of the building , will be provided for emergency evacuation .

Other Miscellaneous Work

Not Applicable.

Documents

Allotment Letter issued by Competent Authority

No: 650 | Date: 14-02-2023

Registry Document

No: 7817 | Date: 06-03-2023

Details of Encumbrances

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Application Form

Affidavit

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Other

Details of Encumbrances

Uploaded: 26-10-2023

Commencement Certificate

Uploaded: 11-09-2023

Other Plan(If Any)

Uploaded: 03-10-2023

Proforma of Application Form

Uploaded: 26-10-2023

Proforma of Allotment Letter

Uploaded: 11-09-2023

Proforma of Conveyance Deed

Uploaded: 11-09-2023

Proforma of Completion Certificate(Occupancy)

Uploaded: 11-09-2023

Waste Disposal Plan

Uploaded: 11-09-2023

Water Supply Plan

Uploaded: 11-09-2023

Electricity Supply Plan

Uploaded: 11-09-2023

Development Work Plan

Uploaded: 11-09-2023

Affidavit

Uploaded: 26-10-2023

CA CERTIFICATE

Uploaded: 03-10-2023

ARCHITECT CERTIFICATE

Uploaded: 03-10-2023

ENGINEERS CERTIFICATE

Uploaded: 03-10-2023

Other

Uploaded: 30-11-2023

Permits

Orignal Permit NoHigh Risk/UPAVP/BP/22-23/1989/13072023
Orignal Permit Date07-08-2023
Valid Upto06-08-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto06-08-2029
End Date31-07-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SHREEM KANTAN INFRASTRUCTURE PVT. LTD.
Contractor Address9B/69 Vrindavan Yojna Lucknow 226029.
Architect NameTarun Sen Singh
Architect Address631/62,Mulayam Nagar,Ismailganj,Lucknow
Architect Licence NumberCA/2013/60532
Structural Engineer NameER.SHAILENDRA KUMAR
Structural Engineer AddressC-1/145, Vikrant Khand, Gomti Nagar Lucknow Uttar Pradesh
Mobile number(Project Co-ordinator)8979272779

Land Details

AFS

Showing 1 blocks with 31 units

Property Summary

Total Carpet Area

1363.33

14674.75 ft²

Total Units

52

1 different types

Blocks & Floors

1

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:26.22
Balconies:0
Parking ratio:0.00 per unit

Block MALIK COMMERCIAL COMPLEX

31 units

Khasra Details

Total Area

1302.00

14014.60 ft²

1 plot
Plot
TypePlot
Khasra/Plot No11/COM-104(CORNER) VRINDAVAN YOJNA LUCKNOW
Area(In Sq. Mt.)1302

Other Details

Contractor Name (if any)SHREEM KANTAN INFRASTRUCTURE PVT. LTD.
Contractor Address9B/69 Vrindavan Yojna Lucknow 226029.
Architect NameTarun Sen Singh
Architect Address631/62,Mulayam Nagar,Ismailganj,Lucknow
Architect Licence NumberCA/2013/60532
Structural Engineer NameER.SHAILENDRA KUMAR
Structural Engineer AddressC-1/145, Vikrant Khand, Gomti Nagar Lucknow Uttar Pradesh
Mobile number(Project Co-ordinator)8979272779