M3M The Line

Gautam Buddha Nagar, Uttar Pradesh
01-08-2023
Launch Date
New
Type
31-07-2028
Completion Date

Overview

Launch Date

01-08-2023

Completion Date

31-07-2028

RERA ID

UPRERAPRJ246070

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)12341
Project NameM3M The Line
Registration Fee (in Rs.)134000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)60
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date01-08-2023
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)78400
Proposed Completion Date31-07-2028

Location

Latitude

28.581255

Longitude

77.377649

Bank Details

Account Details
Name of the AccountSkyline Propcon Pvt. Ltd.-Collection Account For M3M The Line
Account Number923020045949492
Bank NameAXIS BANK LTD.
Branch NameSector-16, Noida
Branch AddressB-21 , B-22, near Sector-16 Metro Station, Noida-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeUTIB0000022
Separate Account Details
Name of the AccountSkyline Propcon Pvt. Ltd.-Separate Account For M3M The Line
Account Number923020045962831
Bank NameAXIS BANK LTD.
Branch NameSector-16, Noida
Branch AddressB-21, B-22, Sector-16, Noida, near sector-16 Metro Station, Noida-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeUTIB0000022
Transaction Account Details
Name of the AccountSkyline Propcon Pvt. Ltd- RERA Transaction Account For M3M The Line
Account Number923020045964442
Bank NameAXIS BANK LIMITED
Branch NameSector-16, Noida
Branch AddressB-21, B-22, Sector-16 Noida, Near Sector-16 Metro Station, Noida-201301
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeUTIB0000022

Development Works

Demarcation of Plots

SW side-75m wide road, SE side-30 m wide road, NW side-24 m wide road, NE side-20m wide green belt.

Boundary Wall

230 mm wide and 2.1-meter high earthquake-resistant boundary wall of RCC/Mild Steel/Brick filled.

Road Work

All roads in the complex will be in combination of Trimix, concrete pavers of different colors, shapes, thickness. Roads will be laid over 225 mm water-bound macadam.

Footpaths

All footpaths in the complex will be in combination of concrete pavers of different colors, shapes and thickness of 65 mm and 80mm laid over 150 mm water-bound macadam surface.

Water Supply Including Drinking Water Facilities

Potable water supply from municipal water supply shall be collected in an underground collection tank and pumped to an overhead water tank. The supply of water to individual Units shall be from the said overhead tanks.

Sewer System

The sewage will be collected through a soil pipeline arrangements, bends, and inspection chambers leading to the sewage water treatment plant (STP).

Drain

Drains having a minimum width of 150 mm will be provided for the collection and channelization of rainwater (surface runoff).

Parks

Green area to be provided as per approved plan.

Tree Planting

The trees will be planted at all suitable locations of the project and along a boundary wall. The tree selection, flora, and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/usage of the project.

Design For Electric Supply Including Street Lighting

LED lights will be used for street lighting.

Community Buildings

Not Applicable.

Treatment and Disposal System of Sewage and Sullage water

Sewage shall be treated in a Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.

Solid Waste Management And Disposal System

Solid waste is to be collected from individual Units and stored in a garbage room. Recyclable shall be processed in the compost machine to make compost. Non-recyclable waste shall be disposed of through approved agents.

Water Conservation System

Rainwater harvesting pits shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.

Energy Management System Including Use of Renewable Energy

Solar panels will be used to reduce energy consumption and electrical appliances with a 5-star rating will be used in community building.

Fire Protection And Fire Safety System

Sprinklers, fire doors, yard hydrants, smoke detectors, and fire alarm systems will be provided as applicable.

Social Infrastructure And Other Public Amenities Including Public Health Services

Not Applicable.

Emergency Evacuation Services

Fire staircases shall be provided as per the approved fire drawing for evacuation to open areas.

Other Miscellaneous Work

Not Applicable.

Documents

Lease Deed

No: 202300743031233 | Date: 17-05-2023

Allotment Letter issued by Competent Authority

No: NOIDA/Commercial/2023/2726 | Date: 27-02-2023

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 24-08-2023

Commencement Certificate

Uploaded: 25-08-2023

Other Plan(If Any)

Uploaded: 11-09-2023

Proforma of Application Form

Uploaded: 25-08-2023

Proforma of Allotment Letter

Uploaded: 25-08-2023

Proforma of Conveyance Deed

Uploaded: 25-08-2023

Waste Disposal Plan

Uploaded: 25-08-2023

Water Supply Plan

Uploaded: 25-08-2023

Electricity Supply Plan

Uploaded: 25-08-2023

Development Work Plan

Uploaded: 25-08-2023

Affidavit

Uploaded: 25-08-2023

CA CERTIFICATE

Uploaded: 25-08-2023

ARCHITECT CERTIFICATE

Uploaded: 25-08-2023

ENGINEERS CERTIFICATE

Uploaded: 25-08-2023

Other

Uploaded: 25-08-2023

Permits

Orignal Permit No2023/06/07/9083
Orignal Permit Date01-08-2023
Valid Upto31-07-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto31-07-2033
End Date31-07-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Skyline Propcon Pvt. Ltd.
Contractor Address23rd Floor, 1C, Windsor Grand, Sector-126, Noida, G B Nagar, U.P. 201303
Architect NameGian P. Mathur and Associates
Architect AddressC-28, East of Kailash, New Delhi-110065
Architect Licence NumberCA No. 80/5759
Structural Engineer NameSyed. Mohammad Adnan
Structural Engineer AddressAcecon Engineers, A269, LGF, Shivalik, Malviya Nagar, New Delhi-17
Mobile number(Project Co-ordinator)9958884214

Land Details

AFS

Showing 2 blocks with 918 units

Property Summary

Total Carpet Area

35214.81 m²

379048.69 ft²

Total Units

1533

3 different types

Blocks & Floors

2

25 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:22.97 m²
Balconies:246
Parking ratio:0.00 per unit

Block T1

888 units

Block t1

30 units

Khasra Details

Total Area

12341.30 m²

132840.52 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoMPC-01, SECTOR-72, NOIDA
Area(In Sq. Mt.)12341.3

Other Details

Contractor Name (if any)Skyline Propcon Pvt. Ltd.
Contractor Address23rd Floor, 1C, Windsor Grand, Sector-126, Noida, G B Nagar, U.P. 201303
Architect NameGian P. Mathur and Associates
Architect AddressC-28, East of Kailash, New Delhi-110065
Architect Licence NumberCA No. 80/5759
Structural Engineer NameSyed. Mohammad Adnan
Structural Engineer AddressAcecon Engineers, A269, LGF, Shivalik, Malviya Nagar, New Delhi-17
Mobile number(Project Co-ordinator)9958884214