NewActive

M AND M ANANTA PROJECT K-2(2) BLOCK-K ANAND VIHAR AAWASIYA YOJNA HAPUR

Hapur, Uttar Pradesh
12-02-2025
Launch Date
New
Type
31-12-2028
Completion Date

Overview

Launch Date

12-02-2025

Completion Date

31-12-2028

RERA ID

UPRERAPRJ652847/04/2025

Location

Latitude

28.7223

Longitude

77.7538

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)9607.45
Project NameM AND M ANANTA PROJECT K-2(2) BLOCK-K ANAND VIHAR AAWASIYA YOJNA HAPUR
Registration Fee (in Rs.)262000
AddressK-2(2) BLOCK-K
Village/Locality/Sector etc.ANAND VIHAR AAWASIYA YOJANA
StateUttar Pradesh
Project Duration (In month)47
DistrictHapur
Original Start Date-
TehsilSelect
Proposed Start Date12-02-2025
Sanctioning Competent AuthorityHapur Pilkhuwa Development Authority
Project Cost (in Lacs)13219
Proposed Completion Date31-12-2028

Bank Details

Account Details
Name of the AccountM AND M PROTECH PRIVATE LIMITED COLLECTION FOR M AND M ANANTA PROJECT K2(2) BLOCK K ANAND VIHAR AWAYSIYA YOJNA HAPUR
Account Number306201010036562
Bank NameUNION BANK OF INDIA
Branch NameHAPUR MAIN BRANCH
Branch AddressNH 24 GARH ROAD PUCCA BAGH HAPUR
IFSC CodeUBIN0530620
Branch DistrictHapur
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountM AND M PROTECH PRIVATE LIMITED SEPARATE ACCOUNT FOR M AND M ANANTA PROJECT K 2 (2) BLOCK K ANAND VIHAR AAWASIYA YOJNA HAPUR
Account Number306201010036561
Bank NameUNION BANK OF INDIA
Branch NameMAIN HAPUR
Branch AddressNH 24 GARH ROAD PUCCA BAGH HAPUR
Branch StateUttar Pradesh
Branch DistrictHapur
IFSC CodeUBIN0530620
Transaction Account Details
Name of the AccountM AND M PROTECH PVT LTD TRANSACTION ACCOUNT FOR M AND M ANANTA PROJECT K 2 (2) BLOCK K ANAND VIHAR AAWASIYA YOJNA HAPUR
Account Number306201010036560
Bank NameUNION BANK OF INDIA
Branch NameMAIN HAPUR
Branch AddressNH 24 GARH ROAD PUCCA BAGH HAPUR
Branch StateUttar Pradesh
Branch DistrictHapur
IFSC CodeUBIN0530620

Development Works

Demarcation of Plots

The Plot has 9607.45 sqm of the area that will be demarcated as per sanction and survey drawing

Boundary Wall

The boundary wall will be prepared with RCC and Bricks with plaster

Road Work

7.5 m wide access road to all tower will be provide and the road will be designed to take up live lode as per approvals and NBC

Footpaths

designed footpaths in the project as a walkway and jogging track

Water Supply Including Drinking Water Facilities

YEIDA authority shall supply water for the entire society and shall be treated and pumped to all the flat

Sewer System

CENTRALIZED STP TO TREATE THE SEWAGE WILL BE DESIGNED AND PROVIDE

Drain

Rain water drain will be provided as per the design to carry all the rain water of the complex in a ringline .the same will be connected to rain

Parks

beautiful parks will be made for all resident to enjoy.the park will be relaxing and entertainment zones along with spaces meant for senior citizen,kids,and enjoyment.

Tree Planting

as per approved building plan an apt no of tree will be provided.the tree will be a mix of evergreen anf flowering tree.they will be themed treen plantation and the complex will have a luch green outlook

Design For Electric Supply Including Street Lighting

Power supply from uppcl as per approved electric plan the lighting will be adequate to lit up the dark spaces and all pathways as well as driveways.

Community Buildings

The club will be made as per approved building plan and it will have all the modern facilities .social gathering place are also being providing in the project the resident will be able to enjoy in the club as a place for social gathering and relaxation.

Treatment and Disposal System of Sewage and Sullage water

STP will treat all the sewages generat from the society and will be maintained

Solid Waste Management And Disposal System

collection,stroage,and disposal will be done as per sanction and NBC.good to too collection of solid waste in the segregated system will be done so that the recyclable waste gan be separated in an efficient way from the wet kitchen waste.

Water Conservation System

Rainwater harvesting system is being provided to conserve rainwater and a duel flush system will also provided with water saving fittings. 12 no of RWH pits proposed

Energy Management System Including Use of Renewable Energy

usage of LED lights will be used all over the project and the use of solar lights will also be explored.

Fire Protection And Fire Safety System

As per the approved building plan we will designed the best fire protection system consisting of sprinkler, smoke detectors and fire alarms.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social gathering place are being provided in the project,Thease place will be spread over the whole complex and residents will be able to enjoy the same Swimming pool,GYM,Indoor play areas ,playing courts,all these facilities will be provided in the complex

Emergency Evacuation Services

As per approved building plan and fire approvals fire staircase are being provided .all fire exit passages shall be kept clear all the time and proper audits as well as fire drills will be done in the society

Other Miscellaneous Work

As per approved building plan any and all the works will be done to make the projects very comfortable and of good quality for all residents,the water bodies will be made in the complex to make it look more beautiful as well as a place to feel calm and relaxed.

Documents

Registry Document

No: 202400740021202 | Date: 06-09-2024

Allotment Letter issued by Competent Authority

No: 1568/SAMPATI/H.D.P.A/24 | Date: 15-03-2024

Details of Encumbrances

Uploaded: 26-11-2024

Commencement Certificate

Uploaded: 05-03-2025

Other Plan(If Any)

Uploaded: 09-02-2025

Proforma of Application Form

Uploaded: 20-03-2025

Proforma of Allotment Letter

Uploaded: 20-03-2025

Proforma of Conveyance Deed

Uploaded: 20-03-2025

Waste Disposal Plan

Uploaded: 05-03-2025

Water Supply Plan

Uploaded: 05-03-2025

Electricity Supply Plan

Uploaded: 05-03-2025

Development Work Plan

Uploaded: 09-02-2025

Affidavit

Uploaded: 21-03-2025

CA CERTIFICATE

Uploaded: 20-03-2025

ARCHITECT CERTIFICATE

Uploaded: 20-03-2025

ENGINEERS CERTIFICATE

Uploaded: 20-03-2025

Other

Uploaded: 09-02-2025

Proforma of Agreement for Sale

Uploaded: 20-03-2025

Permits

Orignal Permit NoGROUPHOUSING/01582/HPDA/BP/24-25/0118/22112024
Orignal Permit Date05-02-2025
Valid Upto05-05-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto06-05-2030
End Date31-12-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)SUNIL NAGAR
Contractor AddressA-102 INDRAPURAM GHAZIABAD UP
Architect NamePUSP KUMAR SHARMA
Architect AddressC 4102 SPRING VIEW FLOOR SHAHPURBAMHETA NH-24 GHAZABAD UP
Architect Licence NumberCA/2015/67013
Structural Engineer NameJITENDRA KUMAR
Structural Engineer Address2ND FLOOR ACHRYA NIKETAN MAYUR VIHAR DELHI
Mobile number(Project Co-ordinator)9899425200

Land Details

AFS

Showing 5 blocks with 99 units

Property Summary

Total Carpet Area

64892.00 m²

698491.00 ft²

Total Units

197

5 different types

Blocks & Floors

5

14 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:329.40 m²
Balconies:509
Parking ratio:0.00 per unit

Block BASEMENT

2 units

Block TOWER-A

26 units

Block TOWER-B

23 units

Block TOWER-C

25 units

Block TOWER-D

23 units

Khasra Details

Total Area

9607.45 m²

103413.63 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoK-2(2) ANAND VIHAR AWASIYA YOJANA
Area(In Sq. Mt.)9607.45

Other Details

Contractor Name (if any)SUNIL NAGAR
Contractor AddressA-102 INDRAPURAM GHAZIABAD UP
Architect NamePUSP KUMAR SHARMA
Architect AddressC 4102 SPRING VIEW FLOOR SHAHPURBAMHETA NH-24 GHAZABAD UP
Architect Licence NumberCA/2015/67013
Structural Engineer NameJITENDRA KUMAR
Structural Engineer Address2ND FLOOR ACHRYA NIKETAN MAYUR VIHAR DELHI
Mobile number(Project Co-ordinator)9899425200