Launch Date
Completion Date
RERA ID
28.7223
77.7538
The Plot has 9607.45 sqm of the area that will be demarcated as per sanction and survey drawing
The boundary wall will be prepared with RCC and Bricks with plaster
7.5 m wide access road to all tower will be provide and the road will be designed to take up live lode as per approvals and NBC
designed footpaths in the project as a walkway and jogging track
YEIDA authority shall supply water for the entire society and shall be treated and pumped to all the flat
CENTRALIZED STP TO TREATE THE SEWAGE WILL BE DESIGNED AND PROVIDE
Rain water drain will be provided as per the design to carry all the rain water of the complex in a ringline .the same will be connected to rain
beautiful parks will be made for all resident to enjoy.the park will be relaxing and entertainment zones along with spaces meant for senior citizen,kids,and enjoyment.
as per approved building plan an apt no of tree will be provided.the tree will be a mix of evergreen anf flowering tree.they will be themed treen plantation and the complex will have a luch green outlook
Power supply from uppcl as per approved electric plan the lighting will be adequate to lit up the dark spaces and all pathways as well as driveways.
The club will be made as per approved building plan and it will have all the modern facilities .social gathering place are also being providing in the project the resident will be able to enjoy in the club as a place for social gathering and relaxation.
STP will treat all the sewages generat from the society and will be maintained
collection,stroage,and disposal will be done as per sanction and NBC.good to too collection of solid waste in the segregated system will be done so that the recyclable waste gan be separated in an efficient way from the wet kitchen waste.
Rainwater harvesting system is being provided to conserve rainwater and a duel flush system will also provided with water saving fittings. 12 no of RWH pits proposed
usage of LED lights will be used all over the project and the use of solar lights will also be explored.
As per the approved building plan we will designed the best fire protection system consisting of sprinkler, smoke detectors and fire alarms.
Social gathering place are being provided in the project,Thease place will be spread over the whole complex and residents will be able to enjoy the same Swimming pool,GYM,Indoor play areas ,playing courts,all these facilities will be provided in the complex
As per approved building plan and fire approvals fire staircase are being provided .all fire exit passages shall be kept clear all the time and proper audits as well as fire drills will be done in the society
As per approved building plan any and all the works will be done to make the projects very comfortable and of good quality for all residents,the water bodies will be made in the complex to make it look more beautiful as well as a place to feel calm and relaxed.
Showing 5 blocks with 99 units
Total Carpet Area
64892.00 m²
698491.00 ft²
Total Units
197
5 different types
Blocks & Floors
5
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9607.45 m²
103413.63 ft²