Launch Date
Completion Date
RERA ID
26.7633532997777
80.96112343408925
The plot is rectangular in shape , having entry gate and front on the 45m wide road. Plot is surrounded by other plots on two sides and row houses at the back.
2.4m high Boundary wall designed with MS Railing in front and other sides with AAC blockwork with stone cladding is provided. AAC block work and rcc work in column and beam may be used as per design.
Interlocking conrete paver block pavement will be created along the driveway with good base from GSB and WMM
Footpath will be provided from 45m main road to the entarnce gate.
UP avas vikas will provide the water supply and Individual Ground water may also be used after taking approval from statutory department. Also end user shall use their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution of water.
Centralized Sewerage system shall be Provided. All Sewerage water will be connected to the UP Avas vikas sewerage system.
Storm water from Roads and other lanscape area will be connected to the Storm water drain channel to the Rain water harvesting pit for recharging of Ground water and overflow will be connected with Municipal drain line.
No Park is provided in the building premises but there is lush green area in the front.
There are various types of trees and palms in the landscape area. Also, various types of shurbs and creepers are also planted.
The system is designed as per local electricity Board with Multiple Point Connection System in which every flat owner has its own meter directly billed by UPPCL and also DG is provided for 24hr power back up for all including common services like External lighting, STP, Pump room etc.
Community activity area is provided at the stilt floor which shall be accessed by all residents
Centralized Sewerage system shall be Provided. All Sewerage water will be connected to the UP Avas vikas sewerage system. No treatment is done in premises.
There is a proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system is provided for the whole building complex to conserve water.
We will use LED lights fitting in external area as well as solar water heaters are also provided. In Pump room all the equipment shall have energy efficient motor.
Since the building is less than 45m in height all the fire norms shall be followed as per NBC and duly approved by fire department.
We have Proposed Common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewage shall be connected to Municipal Sewerage system. Storm water for Roof, Roads and other area shall be connect to the Storm water drain channel to the Rain water harvesting Pit for recharging of Ground water and overflow shall be connected with municipal drain.
Fire Staircase is provided in the building which should be used during emergency. Balcony can also be used for evacuation. Assembly points areas will be demarcated for earthquake and other possible disasters
Three Tier Security is provided in the premises.
Showing 1 blocks with 49 units
Total Carpet Area
10226.20 m²
110073.79 ft²
Total Units
119
3 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4128.00 m²
44433.38 ft²