NewActive

LOTUS TOWER

Kanpur Nagar, Uttar Pradesh
01-07-2017
Launch Date
New
Type
29-12-2021
Completion Date

Overview

Launch Date

01-07-2017

Completion Date

29-12-2021

RERA ID

UPRERAPRJ2647

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)4800
Project NameLOTUS TOWER
Registration Fee (in Rs.)29000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)54
DistrictKanpur Nagar
Original Start Date-
TehsilKanpur
Proposed Start Date01-07-2017
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)4000
Proposed Completion Date29-12-2021

Location

Latitude

26.29.22.192

Longitude

80.14.48.76

Bank Details

Account no.50326989274
Name Of Account Holdercurrent account
Bank NameAllahabad bank
Branch Address233-c, Govindnagar, Kanpur - 208006
Branch NameGovind nagar
IFSC CodeALLA0210488

Development Works

Demarcation of Plots

situated on Kalyanpur Panki Road

Boundary Wall

Brick wall on column and beam structure

Water Supply Including Drinking Water Facilities

Own boring and government supply to be taken

Sewer System

Disposed to government Sewerage System and planning as per norms

Drain

Reinforced Cement Concrete covered Drains

Parks

15% Greenery maintained in the form of 2 parks proposed on gound.Additional landscaped park on podium is proposed along with children play area

Tree Planting

Tree plantation will be done as per norms and landscaped drawing

Design For Electric Supply Including Street Lighting

Provided by government supply and solar panel.Street lightening is proposed along the boundary wall and road

Community Buildings

Club house and society building is proposed at the stilt floor

Treatment and Disposal System of Sewage and Sullage water

Sewer Treatment Plant is proposed and final disposal is proposed to floww in government sewer system

Solid Waste Management And Disposal System

Disposal will be done by local authority

Water Conservation System

Rain water harvesting system is proposed for the entire building

Energy Management System Including Use of Renewable Energy

Own Transformer

Fire Protection And Fire Safety System

Underground tank is proposed for fire fighting and fire fighting norms would be followed in entire building

Social Infrastructure And Other Public Amenities Including Public Health Services

Club House

Emergency Evacuation Services

2 fire staircases run upto topmost floor of the building and 4 additional fire staircases for basement are proposed

Other Miscellaneous Work

Gaurd Room

Documents

Allotment Letter issued by Competent Authority

No: 3801 | Date: 21-11-2012

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Commencement Certificate

Uploaded: 30-07-2018

Proforma of Application Form

Uploaded: 30-07-2018

Proforma of Allotment Letter

Uploaded: 30-07-2018

Proforma of Conveyance Deed

Uploaded: 30-07-2018

Waste Disposal Plan

Uploaded: 30-07-2018

Water Supply Plan

Uploaded: 30-07-2018

Electricity Supply Plan

Uploaded: 30-07-2018

Development Work Plan

Uploaded: 30-07-2018

Affidavit

Uploaded: 30-07-2018

CA CERTIFICATE

Uploaded: 30-07-2018

ARCHITECT CERTIFICATE

Uploaded: 30-07-2018

ENGINEERS CERTIFICATE

Uploaded: 30-07-2018

Affidavit

Uploaded: 28-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 28-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 28-07-2017

Authentic copy of Approval of Project

Uploaded: 28-07-2017

Commencement Certificate

Uploaded: 28-07-2017

Floor plans of all types

Uploaded: 28-07-2017

Floor plans of all types

Uploaded: 28-07-2017

Floor plans of all types

Uploaded: 28-07-2017

Other Plan(If Any)

Uploaded: 25-11-2017

Permits

Orignal Permit No1020
Orignal Permit Date13-04-2017
Valid Upto12-04-2022
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-04-2023
End Date30-06-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Manoj Kumar Gupta
Contractor Address74/227 A, dhankutti, Kanpur (UP)208001
Architect NameRupesh associates
Architect Address111/7, ground floor, indraprastha appt., Harsh Nagar, Kanpur
Architect Licence NumberCA/98/22528
Structural Engineer NameANPEE-TECH ENGINEERS
Structural Engineer Address111/7, ground floor, indraprastha appt., Harsh Nagar, Kanpur
Mobile number(Project Co-ordinator)7348342222

Land Details

AFS

Showing 2 blocks with 63 units

Property Summary

Total Carpet Area

5540.46

59636.96 ft²

Total Units

63

2 different types

Blocks & Floors

2

7 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:87.94
Balconies:230
Parking ratio:0.00 per unit

Block A

31 units

Block B

32 units

Khasra Details

Total Area

4705.74

50652.11 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoE/GP-2
Area(In Sq. Mt.)4705.74

Other Details

Contractor Name (if any)Manoj Kumar Gupta
Contractor Address74/227 A, dhankutti, Kanpur (UP)208001
Architect NameRupesh associates
Architect Address111/7, ground floor, indraprastha appt., Harsh Nagar, Kanpur
Architect Licence NumberCA/98/22528
Structural Engineer NameANPEE-TECH ENGINEERS
Structural Engineer Address111/7, ground floor, indraprastha appt., Harsh Nagar, Kanpur
Mobile number(Project Co-ordinator)7348342222