Total Units
656
2 unit types
Carpet Area
4,29,254 ft²
39,879.06 m² · carpet only, excludes balcony
Blocks & Floors
41
164 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 654 ft² (60.79 m²)Balconies 369Parking per unit 0.00
All blocks
Showing 50 of 205 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| 1 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 1 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 1 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 1 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 1 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 10 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 10 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 10 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 10 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 10 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 11 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 11 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 11 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 11 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 11 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 12 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 12 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 12 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 12 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 12 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 13 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 13 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 13 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 13 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 13 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 14 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 14 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 14 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 14 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 14 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 15 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 15 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 15 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 15 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 15 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 16 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 16 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 16 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 16 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 16 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 17 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 17 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 17 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 17 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 17 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 18 | GF | OTHER | 2 | 185 ft²17.23 m² | — | — |
| 18 | GF | OTHER | 2 | 195 ft²18.14 m² | — | — |
| 18 | 1 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 18 | 2 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
| 18 | 3 | 3 BHK | 4 | 809 ft²75.16 m² | 3 | 119 ft²11.10 m² |
All building blocks have been demarcated at site and construction of building work is almost complete
boundary wall has been constructed
Bituminous road work consisting of 7.5 m, 9.0 m and 12.0 m width has been proposed and road work is in progress
road side footpath ( interlocking Tiles) is being constructed
potable water shall be supplied from bored well. Water shall be pumped, stored in UGT and pumped through anetwork of pipes to various blocks
sewerage system consists of np-3 pipes of varying diameter as per design
R.C.C. storm water drains of different sizes have been proposed, and work is in progress
Parks have been provided as per layout. Boundary wall has been constructed and parks are being developed
Trees have proposed to be planted within open spaces and parks. Plantation will be done after development work is over
Electrical load as per UPPCL shall be got sanctioned, installed and handed over to UPPCL for maintenance
N/A
Sewage is being treated primarily at block level through septic tank, and this partially treated effluent will finally will be treated at STP
garbage collection centres have provisioned and Municipal corporation will handle the garbage
N/A
N/A
N/A
N/A
N/A
N/A
Lohia Enclave - Phase-1 is located in Gorakhpur.
Yes. Lohia Enclave - Phase-1 is registered under UPRERAPRJ9365 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Lohia Enclave - Phase-1 is 29 April 2018.
Lohia Enclave - Phase-1 is developed by GORAKHPUR DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.