RERA Received Date
Completion Date
RERA ID
26.410800
80.534400
Land is well demarcated at site with a wide opening at main road.
A 2.4 mt high permanent boundary wall is proposed to be consructed to enclose the site. A well designed gate complex shall be part of it.
With 18 mt. entrance road, network of 9.00 and 12.00 mt. wide Bituminous road is proposed to be constructed as per CPWD norms.
900 to 1200 mm. wide paved area shall run on both side of the roads as footpath.
We will provide Two nos. of pump to fill up UG tank/OHT to supply drinking water to the whole township. Make of pumps and pipes shall be as per the standard good quality specifications.
A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of required capacity. All the standard quality material shall be used to match CPWD Norms.
Storm water from Roads and other landscape area shall be connected to the Storm water drain channel which shall lead to Rain water harvesting Pits to recharge the Ground water.
Marked green areas shall be developed as theme parks with facilities for elderly, children and residents in general. Low height trees, shrubs and grass carpet shall be common to all the green spaces.
All the roads shall be lined with 4.5 to 6 mt. high trees(Plumeria Alba etc.) at close recommended intervals.
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
A club building with basic facilities is proposed in the township sperately
A well designed sewerage system is proposed to be laid to carry sewage/soil water up to STP of required capacity. All the standard quality material shall be used to match CPWD Norms.
"There is a proper garbage collection area maked for garbage disposal. Collection shall be lined up with the local municipal authorities. "
Apart from rainwater harvesting, treated water shall be used for irrigation purposes resulting in zero wastage.
Apart from use of LED lights, 25% of the street lights shall have solar back up. Natural light sensitive LED lights shall be used in common areas to avoid electricity wastage.
UG tank to have enough reserved storage for fire fighting. Required number of fire hydrants shall be installed with water supply line.
NA
All the exit roads are a minimum 9 mt. wide with 18.00 mt wide main exit to facilitate an easy emergency exit.
NA
Showing 1 blocks with 2 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
103560.00 m²
1114709.48 ft²