All 9 number of plots along with roads and utilities will be demarcated as per the approved map. the orientation and size will be maintained. The size of plot will be as shown in approved layout.
The required boundary wall will be 6 to 8 feet high. the wall will be made in brick mortar. The boundary wall will be plastered and painted. The wall at all required locations will be earthquake resistant.
The roads will be of paver blocks laid over the compacted granular layer topped with sand bed. The 9 m wide roads will be constructed as per relevant codes. the subgrade and granular layer will be compacted to minimum of 95 compaction. The paver block will be 80 mm thick.
The footpath will be of colored interlocking tiles at suitable location in width of 1m. The subgrade will be compacted and the sand bed of 40-50 mm will be laid before placing the paver blocks.
The pump house will be constructed for the ground water . The potable ground water will be pumped to UGT/OHT and supplied to all units of the project with PVC pipe lines. The pipe line will be laid in line and slopes to cater each unit
Individual septic tanks will be constructed for each unit.. The sewerage connection system will be provided to each unit. The dimensions will be approximately 2.0 x 2.5 x 2.5 m
The lined covered drain will be constructed in the project to cater for the drainage requirements of the project. The drain outlet will be fixed as per the local drainage plan. The width of the top of the drain will be minimum 200mm and the shape will be trapezoidal to assist flow.
Not Applicable
The tress will be planted at all suitable location of the project
The separate transformer will be installed in the project as per the electrical load sanctioned by the electrical department. The electricity will be transferred through overhead lines and distribution boxes. The minimum heights of street light will be 4.50 m.
Not Applicable
Not Applicable
A dalab ghar will be constructed to cater for the domestic waste of the project. Thereafter the waste will be disposed to the designated location of the local administration.
Rain water harvesting pit with multilayer filtration system will be installed in the project . A 20 kl harvesting pit will be installed in he project. the 100 mm dia. perforated pipes will be will be driven from the bottom of the pit to the general water table level of the area
Not Applicable
Not Applicable
Not Applicable
Not Applicale
Ad per project requirements for its betterment
Showing 1 blocks with 1 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1896.93 m²