Lakeview Apartment

Lucknow, Uttar Pradesh
20-02-2026
RERA Received Date
New
Type
01-01-2031
Completion Date

Overview

RERA Received Date

20-02-2026

Completion Date

01-01-2031

RERA ID

UPRERAPRJ963704/04/2026

Location

Latitude

26.852414

Longitude

81.032774

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)37179
Project NameLakeview Apartment
Registration Fee (in Rs.)191000
AddressKhasra No. 536,537,544,545,546,547,548,549,550 551A, 551B, 554A, 557,557A,555,556,542,543, 554V (GH-1 ,2) Viraj Khand Gomti Nagar
Village/Locality/Sector etc.Gomti Nagar
StateUttar Pradesh
Project Duration (In month)59
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date20-02-2026
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)68239
Proposed Completion Date01-01-2031

Bank Details

Account Details
Name of the AccountSECRETARY LDA COLLECTION ACCOUNT LAKEVIEW APARTMENT
Account Number628101112135
Bank NameICICI Bank Ltd.
Branch NameLucknow - Ashok Marg
Branch Address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001
IFSC CodeICIC0006281
Branch DistrictLucknow
Branch StateUttar Pradesh
Branch Email Address[email protected]
Separate Account Details
Name of the AccountSECRETARY LDA SEPARATE ACCOUNT LAKEVIEW APARTMENT
Account Number628101112133
Bank NameICICI Bank Ltd.
Branch NameLucknow - Ashok Marg
Branch Address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0006281
Transaction Account Details
Name of the AccountSecretary LDA RERA Transaction Account Lakeview Apartment
Account Number628101112134
Bank NameICICI Bank Ltd.
Branch NameLucknow - Ashok Marg
Branch Address28/10, Ashok Marg, Hazratganj LUCKNOW UTTAR PRADESH 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0006281

Development Works

Demarcation of Plots

Plot is already demarcated. all the development and construction work will be done under the demarcated plot.

Boundary Wall

Brick work boundary wall at the height of 2100 mm and 600 mm high MS grill. Length Of Boundary Wall is 875.42 metre

Road Work

6.00 M Wide Reinforcement Cement concrete pavement with vacuum dewatered concrete is proposed around the building as per sanctioned plan.

Footpaths

A footpath with a PCC base, GSB 80 mm thick M-35 paver blocks, and kerb stone edging shall be provided as per the drawings.

Water Supply Including Drinking Water Facilities

The water supply system for the building shall be designed to ensure reliable, hygienic, and adequate water availability for fire protection as well as domestic use. Source & Storage: • The primary source of water shall be a bore well (The development is provided with a comprehensive water supply system comprising 3 no. borewells (2 working + 1 standby ,500 LPM and 75mtr. Head ). • Water from the bore well shall be conveyed through suitable pipelines to the Underground Storage Tank (An underground water storage tank (UGT) of 825 KL). • The UGT shall be compartmentalized into Fire Water Tank and Domestic Water Tank as per applicable norms. Fire Water Priority: • Water from the bore well shall first be filled into the Fire Water Tank (200kl) in the UGT to ensure uninterrupted fire-fighting water availability. • Domestic water supply is maintained through hydro-pneumatic pumping systems with a flow rate of 875 LPM (2 working + 1 standby) at 90 m head, and flushing water is supplied through a separate hydro-pneumatic system with a flow rate of 450 LPM (2 working + 1 standby) at 90 m head. • Additionally, an irrigation pump of capacity 780 LPM (approx.) is provided for horticulture requirements. The system ensures adequate supply of potable (drinking) water and efficient distribution as per NBC/CPWD norms. • Water from the domestic section of the UGT shall be pumped using electrically operated pumps to the Overhead Tank (OHT). • Overhead tanks (OHT) of 208 KL for domestic water and 104 KL for flushing water are provided for gravity-based distribution. • The pumping system shall include necessary control valves, non-return valves, pressure gauges, and isolation valves. • Adequate pump capacity shall be provided to maintain required pressure and flow. Gravity Distribution: • From the OHT, water shall be supplied through a gravity-based distribution system. • Vertical risers and horizontal distribution pipelines shall be provided to supply water to all toilets, kitchens, and other domestic points across all floors. System Design: • The entire distribution network shall be designed to optimize flow rate, pressure, and water quality. • All pipelines shall be of approved material and size, suitable for potable water. • The system shall comply with relevant CPWD / NBC / Local Authority norms.

Sewer System

A separate storm water drainage system with ground water recharge provision (A separate storm water drainage system with provision of 15 nos. rainwater harvesting pits shall be provided for groundwater recharge and efficient surface runoff management.) shall be provided for the site. • Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network. • The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures. • Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination. • Excess storm water, after groundwater recharge, shall be safely discharged into the Municipal storm water drain line as per the approved layout and specified plan. • The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management. • The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines .

Drain

A separate storm water drainage system with ground water recharge provision (rainwater harvesting) shall be provided for the site. • Rainwater from terraces, roofs, paved areas, and open spaces shall be collected through a dedicated storm water drainage network. • The collected storm water shall be conveyed through properly sized pipelines and drains to rainwater harvesting / ground water recharge structures. • Adequate filter media and silt traps shall be provided before recharge to prevent choking and contamination. • Excess storm water, after groundwater recharge, shall be safely discharged into the Municipal storm water drain line as per the approved layout and specified plan. • The entire system shall be designed to prevent waterlogging and ensure efficient surface runoff management. • The storm water drainage system shall comply with applicable NBC / CPWD / Local Authority guidelines.

Parks

A green area of approx.= 7500 sqm (23%) area for the purpose of recreational activities like jogging track, children’s play area , gazebo sitting space, sports such as – badminton court, basketball court etc

Tree Planting

Many types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.

Design For Electric Supply Including Street Lighting

Distribution Transformer 5.0 MVAX2 Nos., Compact Sub-Station 400KVA 11/0.433X13 Nos., 33/11KV HT Panel & 11/0.433KV HT Panel, 11KV RMU, Main Essential LT Panel, Main Block Panel, Essential Block Panel, Outdoor Feeder Pillar, and DG (750KVAX2 Nos.) backup for common services like external lighting and other essential area is proposed as per sanctioned plan, HSD Tank, HT/LT Cable line, Street Light & High Mast Light Poles Feeder pillar, Street lights, will be provided. As per site requirement manhole will be provided for the L.T., L.V., and H.T. lines.

Community Buildings

There is a Club building proposed in our project with all required amenities.

Treatment and Disposal System of Sewage and Sullage water

A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building. • All sewage and sullage water from toilets, kitchens, wash areas, and other sanitary fixtures shall be collected through a separate sewerage network. • The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the proposed Sewage Treatment Plant (STP). • The STP shall be designed to treat sewage to the prescribed standards as per CPCB / SPCB / Local Authority norms. • Treated effluent from the STP shall be reused for flushing, landscaping, horticulture, and other non-potable purposes, as feasible. • Excess treated water, if any, shall be safely discharged into the Municipal sewer / drain after meeting the prescribed discharge standards. • Sludge generated from the STP shall be properly treated, dried, and disposed of through approved agencies. • The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution

Solid Waste Management And Disposal System

A comprehensive system shall be provided for the collection, treatment, and disposal of sewage and sullage water generated from the building. • All sewage and sullage water from toilets, kitchens, wash areas, and other sanitary fixtures shall be collected through a separate sewerage network. • The collected wastewater shall be conveyed through R.C.C. sewer lines laid at appropriate gradients to the proposed Sewage Treatment Plant (STP) of 500KLD. • The STP shall be designed to treat sewage to the prescribed standards as per CPCB / SPCB / Local Authority norms. • Treated effluent from the STP shall be reused for flushing, landscaping, horticulture, and other non-potable purposes, as feasible. • Excess treated water, if any, shall be safely discharged into the Municipal sewer / drain after meeting the prescribed discharge standards. • Sludge generated from the STP shall be properly treated, dried, and disposed of through approved agencies. • The entire treatment and disposal system shall be designed to prevent contamination, odor nuisance, and environmental pollution

Water Conservation System

A comprehensive Water Conservation System shall be implemented to promote efficient use of water and minimize wastage within the premises. • Low-flow and water-efficient plumbing fixtures such as dual flush WCs, aerated faucets, and sensor-based fixtures shall be provided to reduce water consumption. • Rainwater harvesting and groundwater recharge systems shall be incorporated to utilize rainwater effectively. • Treated wastewater from the STP shall be reused for flushing, landscaping, and other non-potable applications. • Separate plumbing lines shall be provided for potable and recycled water to avoid cross-contamination. • Water meters shall be installed at suitable locations to monitor and control water usage. • The overall system shall be designed in compliance with NBC / CPWD / Local Authority guidelines and applicable water conservation norms.

Energy Management System Including Use of Renewable Energy

We will use LED lights for energy management system and considering Roof Top Solar Power Plant in selective areas as per GRIHA requirement, will use EV Charger’s for 2 & 4 Wheelers.

Fire Protection And Fire Safety System

A comprehensive Fire Protection and Fire Safety System shall be provided in the building to ensure early detection, effective fire control, and safe evacuation of occupants/residents. • The fire protection system shall be designed and installed in accordance with NBC 2016, Part 4, DBR, and applicable Fire Department guidelines. • An adequate and dedicated fire water storage shall be provided in the Underground Tank. • A complete firefighting system comprising fire pumps (main pump, jockey pump, and standby pump), risers, down-comers, yard hydrants, landing valves, hose reels, and fire hose cabinets shall be provided as per fire norms. • Automatic sprinkler system shall be provided in areas as required by fire regulations. • Fire detection and alarm system including smoke detectors, heat detectors, manual call points, hooters, and fire alarm control panel shall be installed at appropriate locations. • Portable fire extinguishers of suitable type and capacity shall be provided at all required locations. • Fire pumps shall be provided with automatic operation and connected to emergency power backup. • Proper means of escape, emergency lighting, exit signage, and fireman lift (where applicable) shall be provided to ensure safe evacuation. • The entire system shall be tested, commissioned, and maintained as per Fire Authority requirements

Social Infrastructure And Other Public Amenities Including Public Health Services

Provision of community center, essential shops with visitor’s parking (with handicap parking) etc

Emergency Evacuation Services

The staircase will be provided with emergency exit doors in each floor as per fire department specifications.

Other Miscellaneous Work

Swimming Pool & changing Rooms, Sub-Station, Gate With Guard Room, Retaining Wall, UG Tank (825 KLD), Hume Pipes.

Documents

Extract of Khatauni

No: GO | Date:

Extract of Khatauni

No: 1428-1432 (All Certified Khatauni) | Date:

Extract of Khatauni

No: Land Acquisition Order | Date:

Extract of Khatauni

No: 1428-1433 (Khasra no. 551A) | Date:

Extract of Khatauni

No: Letter for mutation For Khasra No. 556 | Date:

Extract of Khatauni

No: 1428-1433 (Khasra no.550) | Date:

Extract of Khatauni

No: Nagar Nigam Letter | Date:

Extract of Khatauni

No: 1428-1433 (Khasra no. 551B) | Date:

Extract of Khatauni

No: 1428-1433 (Khasra 557A) | Date:

Details of Encumbrances

Uploaded: 17-04-2026

Commencement Certificate

Uploaded: 02-04-2026

Other Plan(If Any)

Uploaded: 11-03-2026

Proforma of Application Form

Uploaded: 11-03-2026

Proforma of Allotment Letter

Uploaded: 11-03-2026

Proforma of Conveyance Deed

Uploaded: 18-03-2026

Waste Disposal Plan

Uploaded: 18-03-2026

Water Supply Plan

Uploaded: 18-03-2026

Electricity Supply Plan

Uploaded: 30-03-2026

Development Work Plan

Uploaded: 30-03-2026

Affidavit

Uploaded: 16-03-2026

CA CERTIFICATE

Uploaded: 17-04-2026

ARCHITECT CERTIFICATE

Uploaded: 18-04-2026

ENGINEERS CERTIFICATE

Uploaded: 18-04-2026

Other

Uploaded: 18-03-2026

Proforma of Agreement for Sale

Uploaded: 18-04-2026

Permits

Orignal Permit NoGovernment Building/Group Housing/17960/LDA/BP/25-26/3370/02012026
Orignal Permit Date02-01-2026
Valid Upto01-01-2031
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto01-01-2034
End Date01-01-2031
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)Lucknow Development Authority
Contractor AddressPradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Architect NameNamit Agarwal For Muralage
Architect AddressA-3/269, Vibhav Khand -3, Gomti Nagar, Lucknow, U.P.. Pin-code: 226010
Architect Licence Number CA/2006/37491
Structural Engineer NameSanjay Sinha
Structural Engineer AddressA-3/269, Vibhav Khand -3, Gomti Nagar, Lucknow, U.P.. Pin-code: 226010
Mobile number(Project Co-ordinator)9918001560

Land Details

AFS

Showing 3 blocks with 62 units

Property Summary

Total Carpet Area

88517.40

952792.44 ft²

Total Units

679

3 different types

Blocks & Floors

3

21 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:130.36
Balconies:228
Parking ratio:0.00 per unit

Block Tower - A

21 units

Block Tower - B

21 units

Block Tower - C

20 units

Khasra Details

Total Area

43140.00

464354.65 ft²

19 plots
Khasra
TypeKhasra
Khasra/Plot No536
Area(In Sq. Mt.)2400
Khasra
TypeKhasra
Khasra/Plot No537
Area(In Sq. Mt.)1740
Khasra
TypeKhasra
Khasra/Plot No544
Area(In Sq. Mt.)1390
Khasra
TypeKhasra
Khasra/Plot No545
Area(In Sq. Mt.)2020
Khasra
TypeKhasra
Khasra/Plot No546
Area(In Sq. Mt.)1010
Khasra
TypeKhasra
Khasra/Plot No547
Area(In Sq. Mt.)1900
Khasra
TypeKhasra
Khasra/Plot No548
Area(In Sq. Mt.)1770
Khasra
TypeKhasra
Khasra/Plot No549
Area(In Sq. Mt.)2020
Khasra
TypeKhasra
Khasra/Plot No550
Area(In Sq. Mt.)190
Khasra
TypeKhasra
Khasra/Plot No551A
Area(In Sq. Mt.)260
Khasra
TypeKhasra
Khasra/Plot No551B
Area(In Sq. Mt.)1890
Khasra
TypeKhasra
Khasra/Plot No554A
Area(In Sq. Mt.)710
Khasra
TypeKhasra
Khasra/Plot No557A
Area(In Sq. Mt.)5560
Khasra
TypeKhasra
Khasra/Plot No555
Area(In Sq. Mt.)250
Khasra
TypeKhasra
Khasra/Plot No556
Area(In Sq. Mt.)2380
Khasra
TypeKhasra
Khasra/Plot No542
Area(In Sq. Mt.)3790
Khasra
TypeKhasra
Khasra/Plot No543
Area(In Sq. Mt.)760
Khasra
TypeKhasra
Khasra/Plot No554V
Area(In Sq. Mt.)5010
Khasra
TypeKhasra
Khasra/Plot No557
Area(In Sq. Mt.)8090

Other Details

Contractor Name (if any)Lucknow Development Authority
Contractor AddressPradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Architect NameNamit Agarwal For Muralage
Architect AddressA-3/269, Vibhav Khand -3, Gomti Nagar, Lucknow, U.P.. Pin-code: 226010
Architect Licence Number CA/2006/37491
Structural Engineer NameSanjay Sinha
Structural Engineer AddressA-3/269, Vibhav Khand -3, Gomti Nagar, Lucknow, U.P.. Pin-code: 226010
Mobile number(Project Co-ordinator)9918001560