NewActive

Kunti Apartments-II

Lucknow, Uttar Pradesh
10-12-2018
Launch Date
New
Type
29-03-2022
Completion Date

Overview

Launch Date

10-12-2018

Completion Date

29-03-2022

RERA ID

UPRERAPRJ876260

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)1030
Project NameKunti Apartments-II
Registration Fee (in Rs.)10500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)40
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date10-12-2018
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)477
Proposed Completion Date29-03-2022

Location

Latitude

26.763058

Longitude

80.946097

Bank Details

Account no.30020200000410
Name Of Account HolderM/S Kunti Builders
Bank NameBank of Baroda
Branch AddressD, Highway Plaza, Udyan - II, Eldeco Raebareli Road Lucknow
Branch NameRaebareli Road Lucknow
IFSC CodeBARB0LUCELD

Development Works

Demarcation of Plots

Plot Demarcated at site.

Boundary Wall

Temporary boundary exists.

Road Work

9.00 mt. approach road from main lucknow-raibareilly road exists.

Footpaths

0.60 mt wide brick paved footpaths along internal 6.00mt road .

Water Supply Including Drinking Water Facilities

underground water to be supplied thru terrace tank.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening and flushing system and overflow from the STP shall be connect with the Municipal sewerage system.

Drain

Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

small green proposed as per approved layout with shrubs and grass.

Tree Planting

4.5 to 6 mt. high trees along internal roads.

Design For Electric Supply Including Street Lighting

Proposed as per norms/calculations.

Community Buildings

NIL

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment after treatment ,water shall be recycle and it will use in gardening and flushing system and overflow from the STP shall be connect with the Municipal sewerage system.

Solid Waste Management And Disposal System

"There are a proper garbage collection area provided for the solid waste management."

Water Conservation System

Rain water harvesting to be done.

Energy Management System Including Use of Renewable Energy

25% solar street lights.

Fire Protection And Fire Safety System

Down comer from 25000 lt.terrace tank.

Social Infrastructure And Other Public Amenities Including Public Health Services

part of main township.

Emergency Evacuation Services

Two exit points available.

Other Miscellaneous Work

NIL

Documents

Sale Deed

No: 5239 | Date: 11-06-2004

Sale Deed

No: 9753 | Date: 22-05-2012

Sale Deed

No: 15185 | Date: 06-08-2013

Registry Document

No: 5805 | Date: 04-04-2015

Extract of Khatauni

No: Reply of query letter for registration | Date: -

Details of Encumbrances

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 14-03-2019

Commencement Certificate

Uploaded: 13-01-2019

Other Plan(If Any)

Uploaded: 25-03-2019

Proforma of Application Form

Uploaded: 20-02-2019

Proforma of Allotment Letter

Uploaded: 20-02-2019

Proforma of Conveyance Deed

Uploaded: 20-02-2019

Waste Disposal Plan

Uploaded: 13-01-2019

Water Supply Plan

Uploaded: 13-01-2019

Electricity Supply Plan

Uploaded: 13-01-2019

Development Work Plan

Uploaded: 13-01-2019

Affidavit

Uploaded: 14-03-2019

CA CERTIFICATE

Uploaded: 13-01-2019

ARCHITECT CERTIFICATE

Uploaded: 13-01-2019

ENGINEERS CERTIFICATE

Uploaded: 13-01-2019

Permits

Orignal Permit No42923
Orignal Permit Date24-10-2016
Valid Upto23-10-2021
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto23-10-2024
End Date30-09-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)SELF
Contractor AddressSELF
Architect NameSanjay Kumar Gupta
Architect AddressFirst Floor Eldceo Corp Chamber-1, Vibhuti Khand, Gomti Nagar, Lucknow
Architect Licence NumberCA/89/12382
Structural Engineer NameAkhilesh Kumar Singh
Structural Engineer AddressD-27,Indira Nagar,Lucknow
Mobile number(Project Co-ordinator)9415159958

Land Details

AFS

Showing 1 blocks with 21 units

Property Summary

Total Carpet Area

1536.80

16541.96 ft²

Total Units

20

3 different types

Blocks & Floors

1

6 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:76.84
Balconies:55
Parking ratio:0.00 per unit

Block Tower-B

21 units

Khasra Details

Total Area

1030.00

11086.82 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoKhasra-1413/1 & Plot No-527
Area(In Sq. Mt.)1030

Other Details

Contractor Name (if any)SELF
Contractor AddressSELF
Architect NameSanjay Kumar Gupta
Architect AddressFirst Floor Eldceo Corp Chamber-1, Vibhuti Khand, Gomti Nagar, Lucknow
Architect Licence NumberCA/89/12382
Structural Engineer NameAkhilesh Kumar Singh
Structural Engineer AddressD-27,Indira Nagar,Lucknow
Mobile number(Project Co-ordinator)9415159958