By fixing of muddi on all corners of the plots
230 mm wall in brick masonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and column structure.
Laying of pavers over well compacted subgrade with GSB layers.
Laying of Designing Tiles of 40 mm over well compacted subgrade with GSB layers.
Laying of 50, 65, 80 (OD) UPVC fresh water supply line from Overhead tank to individual plots with proper air valve, sluice valve in chambers, scour valves and provision for connecting fire brigrade outlet, as per MEP drawings
Laying of SN-4 pipes and construction of rectangular and circular manholes and manhole covers at respective places and connecting the sewer system to the sewerage treatment plant to be insatlled 300 KLD
Laying of pipes for storm water drainage throughout the project connecting to rain water harvesting line and recharge wells, overflow water line will be connected to municipal line.
6966.73 Sq. Mtr. area consisting of 12 parks under the project will be developed with park boundary sides having trees and grass, and stone park bench for sitting along with children swings.
Tree plantation of Turmal Elia, Ficus Panda, Ashoka and Palm Trees, etc will be planted in park and project boundary sides as per the landscape drawings.
Laying of underground LT cables from Main electricity board connection to transformers and upto plots of individual connections. also fixing of 6 metres electricity poles with solar street lights along side plots boundaries in overall project at suitable distance.
Guard room, dalab ghar, toilets and STP will be constructed and developed.
Sewage Treatment Plant of 300 KLD will be installed along with modular treatment system, treated sullage water will be utilized for irrigation of green areas and flushing of overflow any to the municipal drain.
Construction of Dalab Ghar/Garbage rooms in brick load bearing structure with dustbins has been proposed in the project having total area of 247.13 sq. mtr. Disposal of the Garbage will be through as per local nagar nigam norms.
Construction of Rain Water Harvesting pits for percolation of rainwater to maintain the ground water levels and laying of Treated sewage water to green area for irrigation as per drawings approved.
Solar Electric street lights shall be installed all over the project.
The project consists of Residential and commercial plots. Hence there is no need for fire fighting facility. Individual owners can install their own fire fighting system as per their and local authority requirements. However, we will provide fire brigade outlets for connecting water supply for emergency cases.
1 plot having area of 552.30 sq. mtr. will be allotted/sold for construction of school use only. Also Kids play area will be developed in some park areas. Further, Guard rooms along with toilets having facility of first aid kit will be developed at entrance gates of the project.
The project shall consists of two gates - one for entry and one for exit, also 7.5 mtr to 15.00 mtr wide roads has been proposed for easy movement of emergency evacuation facilities/vehicles.
The project consists affordable plots mostly under 100 sq. mtr. and total plots in project are 291 including 1 plot proposed for school .