The plot of 4489 sqrare meters will be demarcated as per the approved plan. The set backs and orientation will be ensured.
The 6 to 8 feet hight boundary wall at the required location will be constructed in brick and mortar. The wall will be plastered and painted.
Interlocking paver blocks of minimum 80 mm thickness to provide asthetic , anti skid riding surface. The pavement will also b e of PQC at required locations. The subgrad and granular layer will be compacted to the design density.
The interlocking paver blocks over the sand bed of 30-50 mm wil be laid at required location. The soil will e compacted underneath
The municipal cum ground water wil be pumped to the underground water tank. Thereon the water will be delivered to the terrace tanks. The potable water then will be delivered through PVC pipes to the common areas of the project
The sewer line will be laid in the project. Soil pipe will be connected with each floors common areas. The swere will be delivered to the manholes laid along the building. The sewer will be taken to the municipal sewer.
Covered lined ddrain will be constructed along the project wall to take the wter from the common areas and from the overflow of terrace. The trapezoidal shape willl be maintained with 200 mm wide bottom and minimum 200 mm height.
Not Applicable
Trees will be planted along the peripheri of the project.,
Provision of dual source of electricity will be made, comprehensive LT panels wil be installd and conealed wiring will lead electricty to each unit of the project along with common areas. The lightings will also be provided for the common areas and the outer face of the building.
Not Applicable
Not Applicable
Proper Dust bins and the chutes will be placed in the project for seggregation of wate type and arrangements will be made for collection and disposal
10,000 KLD storage tank and the multilayerd filter system will be installed o collect the rain water and allow percolation through perforated pipe to assist ground water recharge.
The Buildig will use the green technologies built with Green buiding norms. efficient methods will be adopted to supplement the natural light yet preventing heat.
Wet riser will be installed in the project with the dedicated water storage tank. The hydrants will also be paced at all required norms as per building codes.
Not Applicable
Evacuation plan will be placed to assist the occupants, proper signage with clear fonts will be installed, emergency light and general awareness boards will be placed in the project
As per project requirement
Showing 1 blocks with 118 units
Total Carpet Area
4327.44 m²
46580.13 ft²
Total Units
174
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4613.23 m²
49656.35 ft²