RERA Received Date
Completion Date
RERA ID
27.54115
77.64484
By fixing of RCC muddi on all corners of the plots
230 mm Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1-6 cement mortar on RCC footing and colum structure.
Laying of roads with proper longitudinal and cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75mm and 50mm layers of send.
Laying of designing Tiles of 40 mm over well compacted subgrade with GSB layers.
Laying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outet Connection at undrground Tank, as per MEP drawings.
Laying of SN-4 Pipes DWC pipes and making of circular manholes and rectangular manhole of size 900x800 MM with 600x600 MM Mainhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
Laying of DWC/RCC NP-3 pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of size 700x700 on Main Line, rectangular Catch Basin of size 450x450 for individual Plots (In Plot Owner Schope), de-Silting Chamber of dia 1.5 M and Recharge Well Size 1.2 Dia. in coordination with Finished Formation Levels, Invert level of Manhole and flow rate, as per MEP drawings.
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
Tree plantaion of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
Laying of overhead HT and LT cables from Main electricity board connection to transformers and upto plots for individual connections (which shall be directly obtained by the plot owners from the electricity board) along with fixing of 30 W 50 W street lights on 9m 11m Steel tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
NA
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Construction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
Installation of Rain Water harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
NA
NA
Temple, Garbage Area
NA
NA
Showing 1 blocks with 5 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
97120.91 m²
1045399.76 ft²