Have queries on this Project?
27.54115
77.64484
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15176.38 m²
163357.04 ft²
NA
230 mm Wall in brick massonary with FPS bricks of class designation 75 in ratio of 1:6 cement mortar or RCC footing and colum structure.
Laying of roads with Proper longitudinal and Cross-sectional road slopes in Cobble Stoneover well compacted subgrade with 75 mm and 50 mm layers of send.
Laying of designing Tiles of 40 mm over well compacted subgrade with GSB layers.
Laying of 50, 65, 80 (OD) UPVC Fresh Water Supply Line from Underground Tank to individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outlet Connection at Underground Tank, as per MEP drawings.
Laying of SN-4 Pipes DWC pipes and making of circular manholes and retangular manhole of size 900 x 800 mm with 600x600 MM Manhole cover for main line with proper finished for formulation level, Invert level of menhole and Connection to individual plots, as per Mep drawings.
Laying of DWC/RCC NP-3 pipes for storm water drainage throughout the project with circular Manholes and retangular catch basins of size 700 X 700 on main line, rectangular catch basin of size 450 X 450 X 450 for individual plots (In plot owner schope), de-silting chamber of dia 1.5 M and recharge Well Size 1.2 Dia. in coordination with finished formation Levels, invert level of manhole and flow rate, as per MEP drawings.
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court and walkway.
Tree Plantation of Turmal Elia, ficus Panda and palm trees throughout the project in the park and on roadside to provide shade, as per landscaping drawings.
Laying of overhead HT and LT cables from Main electricity board connection to Transformers and upto plots for individual connections which shall we be directly obtained by the plot owners from the electricity board along with fixing of 30 w and 50 w street light on the 9 m and 11 m Steel tubular poles with provision of required capacity Transformers as per UPPCL guidelines
NA
Contruction of STP collection tank along with modular treatment system and laying of dwc pipe from STP to individual plots and green areas for flushing and ingration as per mep drawings and overflow discharge connection to the government dain
NA
Installation of Rain Water Harvesting pits for percolation of rainwater to maintain the local ground water levels as per approve layout from MVDA and laying of severage treated water supply line to plots and green areas for flushing and irrigation as per mep .
Electrification as per approved drawing by the UPPCl.
NA
NA
NA
NA
Krishna Greens is located in Mathura.
Yes. Krishna Greens is registered under UPRERAPRJ637082/03/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Krishna Greens is 28 October 2029.
Krishna Greens is developed by KRISHNA GREENS DEVELOPERS.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.