Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.006 of 6 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 6 of 6 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
185.12 acres
7,49,149.00 m² · plot area
The demarcation will progress with progress of development work, including the construction of roads, drainage systems, water supply networks, sewerage infrastructure, and other essential amenities. Upon completion of the development activities, the plot boundaries will be clearly marked and demarcated in accordance with the approved layout plan to ensure proper identification, allocation , and utilization of individual plots.
Precast concrete boundary wall of approximately total length 3550 rmt and 2.1 m height, as proposed for the township perimeter.
The road infrastructure within the project shall be developed in in accordance with the sanctioned layout plan. The total length is 14287.71 m, following the proposed hierarchy of 60 m, 30 m, 24 m, 18 m, 12 m, and 9 m roads. Flexible pavement is proposed, with associated kerbs, junctions, road markings, and signage as per the detailed road design.
Pedestrian footpaths and cycle tracks are proposed along the road netowrk , with an interlocking paver finish, and vary from 2 meter to 3.5 meter in width at designed pedestrian/cycle track areas.
Integrated water supply system comprising 2 borewells, each with a 150 mm line, and municipal supply as the proposed primary source, 8000 kld underground and 2000 and 3000 kld overhead reservoirs. The DBR includes a proposed 2 MLD WTP and underground water-reservor/pumping infrastructure. Domestic water supply pipeline of 150 mm OHT filling line, and 200, 100, 80, and 60 mm supply lines
A comprehensive sewerage network shall be provided to efficiently collect and convey wastewater generated within the township. An underground sewerage network shall be provided for the collection and conveyance of wastewater. Approximately 4 km of sewer piping is indicated, with 250 mm HDPE piping proposed and designed in accordance with the projected population and sewage load. Adequately spaced 650 manholes, with brickwork material used. Manhole type gravity and inspection chambers shall be provided throughout the network to ensure smooth operation and maintenance.
600 mm-wide RCC surface stormwater drainage system for the collection and conveyance of surface runoff, integrated with the site drainage network. Length and width 650X250 - 22km, 66X750- 10 km, Drain type storm and surface; materials used concrete trench. Drain Disposal method percolation pit and overflow to municipal drain.
No of parks 7; area 63833 sqm. Parks shall be developed as per the sanctioned layout plan and designed as attractive recreational spaces for residents of all age groups. The parks shall include landscaped lawns, avenue plantations, ornamental shrubs, total trees 1038, childrens play areas, paved walking and jogging pathways, seating arrangements, open green spaces, and other amenities to promote community interaction, recreation, and a healthy lifestyle. Adequate lighting and landscaping features shell be incorporated to enhance safety, usability and aesthetic appeal. To ensure security and proper maintenance, the parks shall be enclosed with a boundary consisting of a 1200 mm high masonry wall topped with a 600 mm high decorative grill, as per the approved design.
Landscaping and 412 tree plantations are proposed along roads, green belts, and within parks to enhance the townships aesthetic appeal, improve environmental quality, and create a sustainable and pleasant living environment for residents.
Integrated electrical distribution system comprising HT receiving arrangement, 11 kV distribution, distribution transformers, 2500 kva -10, 2000 kva-2, 1600 Kva-2, LT distribution, individual/common-service metering, and external LED street lighting. No. of poles and lights 724. Street lighting includes road, footpath, junction, entry/exit, landscape, security and public-facility lighting. The distribution network has been planned to provide a reliable and efficient power supply throughout the development.
A conventional RCC multipurpose hall of 3000 sqm with a capacity of 1600 ppl, for community facilities included in the proposed development/public-facility.
Sewage treatment, 11 Nos. STP units are proposed with a capacity of 4000 KLD. The DBR identifies MBBR as the proposed/baseline treatment technology, with provision for treated-water reuse for applications such as landscaping/flushing, promoting sustainable water management and conservation of freshwater resources, as per the approved design.
A comprehensive solid waste management system will be implemented to ensure a clean and hygienic environment within the project area. Estimated waste 4174 kg/perday, The DBR provides for a material recovery facility/composting arrangement with a minimum land allocation of approximately 2 acres for the indicated waste -processing requirement. The Waste generated form residential, commercial, and common areas will be collected through an organized collection system and transported to designated municipal facilities. The collected waste will be processed and disposed of at designated disposal sites or treatment plants in accordance with applicable environmental regulations and municipal guidelines, ensuring effective waste management environmental protection, and public health safety.
Rainwater harvesting and storm-water management through proposed rainwater-harvesting pits and a water-retention pond, as part of the site water-management system. Number of harvesting pits 10; 600 mm stormwater drain with a perforated cover on top and access with grating every 10 min. interval.
Energy-efficient electrical infrastructure, including LED lighting, efficient transformers, energy monitoring, and grid-connected solar PV provision. The solar capacity shall be established as per the approved design. No. of Solar panels 324,
Fire and life-safety provisions, including fire alarm, fire pumps, emergency lighting, fire - fighting equipment, and protected electrical supplies for the life-safety system, as applicable to the development. No. of hydrants 315,
Provision of designated public/ social facilities as per the approved layout. The DBR identifies public facilities including schools, nursing home, community welfare centre, banquet/multipurpose hall and guest house.
Emergency access and evacuation provisions shell be integrated with the internal road network and applicable fire/life-safety requirements. Emergency lighting and essential services are provided for in the electrical design basis.
Associated external-development works including site landscaping, signage, utility indicated in the approved design.
Kirti Vanam Awasiya Yojana is located in Mathura.
Yes. Kirti Vanam Awasiya Yojana is registered under UPRERAPRJ345031/11/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Kirti Vanam Awasiya Yojana is 30 September 2031.
Kirti Vanam Awasiya Yojana is developed by MATHURA-VRINDAVAN DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.