Have queries on this Project?
28.361472
79.472202
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15738.00 m²
169402.26 ft²
no. of residential plots under100 sq mtrs area is 53 and no. of plots between 100-150 sq mtr is 28 and no. commercial plots is 3
0.23 m thick boundary wall upto 3 .00 m high with 1is to 6 ratio and both side plaster with 15 ratio will be constructed.
stone ballast with compaction soling coat 40 mm to 63mm thick coat of stone gritt and sand including compaction and laying concrete slab 10 cm thick with 1 2 4 ratio.
footpaths will be provided in park. concrete paver block will be used for pavement. bollard lights will be provided along the footpath in park.
underground water tank of capacity 110 KLD will be provided. PUMP house will be provided for efficient supply of water to overhead water tank situated on terrace top of each residence.
under ground sewerage system will be provided to connect each residence towards the stp located in park. STP of 50KLD will be provided and an outflow line will be connected to external sewer line on the front road.
covered drain along with the road will be provided. concrete cover blocks will be used to cover the drain. concrete blocks will be used to cover the drain.
concrete blocks will be used for external boundary. park level will be 0.30m high from internal road level and various amenities will be provided such as Children play area and gazebo.
Palm trees will be provided along the road. Box hedges will be planted at various locations in park. carpet grass of type 4 will be planted along with Marigold and petunia flower bed.
we will provide underground electric supply for houses. street lights will be provided along the road with 1 street light placed between 2 corresponding units. Transformer of 500 KVA will be provided.
NIL
STP of capacity 50 KLD will be provided inside Park. drain outlet from the STP will be connected to the external sewer line on the front road. treated water will also be used for landscaping.
we will provide garbage collection area separately in Park.
Rain water harvesting pit will be provided in park. undergoing recharge pits will be provided to conserve collected water.
NIL
NIL
NIL
NIL
NIL