Have queries on this Project?
28.2250
79.2914
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
9423.75 m²
101436.30 ft²
No. of residential plots under 100 sqmt area is 21 , between 100-150 sqmt area is 20, No. of commercial plots is 5.
0.23 m thick Boundary wall upto 3.00m high with 1;6 Ratio and both side plaster with 1;5 ratio will be constructed.
stone ballast with compaction soiling coat 40 mm to 63 mm, 6mm to 10mm thick coat of stone grit and sand including compaction and laying concrete slab 10 cm thick with 1;2;4 ratio.
footpaths will be provided in park concrete paver block will be used for pavement. Ballard lights will be provided along the footpath in park.
under ground water tank of capacity 30 KLD will be provided. Pump house will be provided for efficient supply of water to overhead water tank situated on terrace top of each residence.
under ground sewarage system will be provided to connect each residence towards the STP located in Park. STP of 25 KLD will be provided and an outflow line will be connected to external sewer lineon the front road.
covered drain along the roads will be provided, concrete cover blocks will be used to cover drain.
concrete blocks will be used for external boundary . park level will be 0.3 m high from internal road level and various amenities will be provided such as children play area and Gazebo.
palm tree will be provided along the road. Box hedges will be provided along the footpath in park. Hibiscus tree and trabulars Palms will be provided at various locations in Park. Carpet grass of type-4 will be planted along with Marigold and Petunia flower bed
we will provide underground electric supply for houses. Street lights will be provided along with road 1 street light placed between 2 correponding units. Transformer of 500 KVA will be provided.
NA
STP of capacity 25 KLD will be provided inside park. Drain outlet from the STP will be connected to the external sewer line on the front road. treated water will also be used for landscaping
we will provide garbage collection area separately in Park.
Rain water harvesting pit will be provided in park . underground recharge pits will be provided to conserve collected water.
NA
NA
NA
NA
NA