Launch Date
Completion Date
RERA ID
27.585317
77.659592
NA
NA
Laying Bitumin /CC roads with proper longitudinal and cross-sectional road slopes and well compacted subgrade with 75mm and 50 mm layers of send.
Laying of designing Tiles over well compacted subgrade with GSB layers.
Laying of HDPE Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outlet Connection at Underground Tank, as per MEP drawings.
Laying of DWC pipes and making of circular manholes and rectangular manhole of required size as per MEPdrawing with Mainhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
Laying of DWC pipes of 200 to 300 MM for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of required size on Main Line, in coordination with Finished Formation Levels, Invert level of Manhole upto rain water harvesting system , as per MEP drawings.
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
Tree plantation of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
Laying HT Cable 240 Sq. MM 7 Nos Aluminium cunductor PVC insuleted armoured served sheathed cable s in tower, having capacity of transformer 1750 KVA along with fixing of street lights on tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
Club House, with healh Club and other amenities all rsident of Keshav Majestic Project
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP (Combind for Whole Prject Keshav ajestic) to Group Housing , individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Construction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
Installation of Rain Water Harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA & laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
Energy Management by required capacity of the power supply from DVNL & use Renewable energy by providing of solar system.
As per Guidelines of the Department of Uttar Pradesh Fire and Emergency Service.
NA
As per Guidelines of the Department of Uttar Pradesh Fire and Emergency Services.
As Required
Showing 1 blocks with 126 units
Total Carpet Area
34273.96 m²
368921.48 ft²
Total Units
504
5 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3.28 m²
35.34 ft²