Laying Bitumin /CC roads with proper longitudinal and cross-sectional road slopes and wlll compacted subgrade with 75mm and 50mm layers of send.
Laying of designing Tiles over well compacted subgrade with GSB layers.
Laying of UPVC Fresh Water Supply Line from Undeground Tank to Individual plots with Proper Air Valve, Sluice Valve in Chambers, Scour Valve and Fire Brigade Outlet Connection at Underground Tank, as per MEP drawings.
Laying of DWC pipes and making of circular manholes and rectangular manhole of required size as per MEP drawing with manhole cover for main Line with proper finished formation level, Invert Level of Manhole and Connection to individual plots, as per MEP drawings.
Laying of DWC/RCC pipes for storm water drainage throughout the project with Circular Manholes and rectangular Catch Basins of required size for individual Units (In plot Owner Schope), in coordination with Finished formation Levels, Invert level of Manhole and flow rate, as per MEP drawings.
Landscaping of the parks with plantation including trees, shrubs and ground covers and recreational areas with benches, sports facilities such as badminton court, mini-basketball court, and walkways.
Tree plantation of Turmal Elia, Ficus Panda and Palm trees throughout the project in parks and on roadside to provide shade, as per landscape drawings.
Laying of overhead HT and LT cables from main electricity board connection to transformers and upto plots for individual connections (which shall be be directly obtained by the plot owners from the electricity board) along with fixing of street lights on tubular Poles with provision of required capacity transformers as per UPPCL Guidelines
Club House, with healh club and other amenities
Construction of STP collection tank along with modular treatment system and laying of DWC pipes from STP to individual plots and green areas for flushing and irrigation as per MEP drawings and overflow discharge connected to the Government Drain.
Construction of Garbage Rooms in brick load bearing Structure with dustbins, collection room and loading area.
Installation of Rain Water Harvesting pits for percolation of rainwater to maintain the local ground water levels as per approved layout from MVDA and laying of Sewage treated Water Supply Line to plots and green areas for flushing and irrigation, as per MEP drawings.
Energy Management by required capacity of the Generator
As per Guidelines of the Department of Uttar Pradesh Fire and Emergency Services
NA
As per Guidelines of the Department of Uttar Pradesh Fire and Emergency Services
As required
Showing 1 blocks with 34 units
Total Carpet Area
7895.70 m²
84988.53 ft²
Total Units
228
3 different types
Blocks & Floors
1
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1333.00 m²
14348.28 ft²