230 MM WALL IN BRICK MASSONARY WITH FPS BRICKS OF CLASS DESIGNATION 75 IN RATIO OF 1/6 CEMENT MORTAR ON RCC FOOTING AND COULOUM STRUCUTURE
LAYING OF ROADS WITH PROPER LONGITUDINAL AND CROSS SECTIONAL ROAD SLOPES IN COBBLE STONE OVER WELL COMPACTED SUBGRADE WITH 75 MM AND 500 MM LAYERS OF SAND.
LAYING OF DESIGNING TILES OF 40MM OVER WELL COMPACTED SUBGRADE WITH GSB LAYERS.
LAYING OF REQUIRED SIZE UPVC FRESS WATER SUPPLY LINE FROM UNERGROUND TANK TO INDIVUSAL PLOT WITH PROPER AIR VALVE , SLUICE VALVE IN CHAMBERS, SCOUR VALVE AND FIRE BRIDGE OUTLET CONNECTION AT UNDERGROUND TANK , AS PER MEP DRAWINGS.
LAYING OF SN-4 PIPES, DWC PIPES AND MAKING OF CIRCULAR MANHOLES AND RECTANGULAR MANHOLES OF REQUIRED SIZE WITH REQUIRED SIZE MANHOLE COVERS FOR MAIN LINE WITH PROPER FINISHED FORMATION LEVEL, INVERT LEVEL OF MANHOLES AND CONNECTION TO INDIVUSAL PLOTES, AS PER MEP DRAWINGS.
LAYING OF DWC /RCC AND NP-3 PIPES FOR STORM WATER DRAINAGE THROUGHT THE PROJECT WITH CIRCULAR MANHOLES AND RECTANGULAT CATCH BASIN OF REQUIRED SIZE ON MAIN LINE , DE-SILITING CHAMBER OF REQUIRED DIA AND RECHARGE WELL OF REQUIRED SIZE. IN CORDINATION WITH FINISG=HED FORMATION LEVEL, INVERT LEVEL OF MANHOLE AND FLOW ARTE, AS PER MEP DRAWINGS.
LANDCAPING OF TREE PARKS WITH PLANTATION INCLUDING TRESS, SHRUBS AND GROUND COVER AND RECREATIONAL AREA WITH BENCHES, SPORT FACILITY AND WALK WAYS.
TREE PLANTATION OF TURMAL ELIA, FICUS PANDA AND PALM TREES THROUGH OUT THE PROJECT IN PARKS AND ON ROAD SIDE TO PROVIDE SHADES AS PER LANDSCAPING DRAWINGS.
LAYING OF OVERHEAD HT AND LT CABLES FROM MAIN ELECTRICITY BOARD CONNECTION TO TRANSFORMERS AND UP TO INDIVUSAL FLATS ALONG WITH FIXING OF REQUIRED CABLE FOR STREET LIGHT ON REQUIRED SIZE TUBULAR POLES WITH PROVISION OF REQUIRED CAPACITY TRANFORMERS AS PER UPPCL GUIDILINES.
CLUB HOUE WITH HEALTH CLUB ETC.
CONSTRUCTION OF STP COLLECTION TANK ALONG WITH MODULAR REATMENT SYSTEM AND LAYING OF DWC PIPES FROM STP TO INDIVUSAL PLOTS AND GREEN AREAS FOR FLUSHING AND IRRIGATION AS PER MEP DRAWINGS.
CONSTRUCTION OF GARBAGE ROOMS IN BRICK LOAD BEARING STRUCTURE WITH DUSTBIN, COLLECTION ROOM AND LOADING AREAS,.
INSTALTION OF RAIN WATER HARVESTING PITS FOR PERCOLATION OF RAIN WATER TO MAINTAIN THE LOCAL GROUND WATER LEVEL AS PER APPROVED LAYOUT FROM MVDA AND LAYING OF SEWEAGE TREATED WATER SUPPLY LINE TO TOWER AND GREEN AREAS FOR FLUSHING AND IRRIGATION , AS PER MEP DRAWINGS.
NA
FIRE FIGHTING SYSTEM WITH FIRE ALARAMS AND SPRINKLERS AS PER DRAWINGS.
NA
FIRE STAIRS AS PER APPROVED MVDA DRAWING
NA
Total Area
4635.00 m²
49890.68 ft²