Overview

RERA Received Date

22-07-2025

Completion Date

27-04-2030

RERA ID

UPRERAPRJ468361/09/2025

Location

Latitude

25.298274

Longitude

83.096837

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)8082
Project NameKashi Gateways
Registration Fee (in Rs.)45500
AddressArazi No. 95, 100/5, 104/2, 106/4, 106/5, 108MI, 109/1, 123/10, Harishankarpur, Mughasarai, Chandauli - 232 101
Village/Locality/Sector etc.Harishankarpur, Mughalsarai
StateUttar Pradesh
Project Duration (In month)58
DistrictChandauli
Original Start Date-
TehsilChandauli
Proposed Start Date22-07-2025
Sanctioning Competent AuthorityVaranasi Development Authority
Project Cost (in Lacs)4137
Proposed Completion Date27-04-2030

Bank Details

Account Details
Name of the AccountR G INFRA VENTURES PRIVATE LIMITED COLL AC KASHI GATEWAYS
Account Number363501010282851
Bank NameUnion Bank of India
Branch NameMughalsarai
Branch Address867, Nai Basti, Bechupur, District- Chandauli
IFSC CodeUBIN0536351
Branch DistrictChandauli
Branch StateSelect
Branch Email Address[email protected]
Separate Account Details
Name of the AccountR G INFRA VENTURES PRIVATE LIMITED SEP AC KASHI GATEWAYS
Account Number363501010282855
Bank NameUnion Bank of India
Branch NameMughalsarai
Branch Address867, Nai Basti, Bechupur, District- Chandauli
Branch StateUttar Pradesh
Branch DistrictChandauli
IFSC CodeUBIN0536351
Transaction Account Details
Name of the AccountR G INFRA VENTURES PRIVATE LIMITED TRANS AC KASHI GATEWAYS
Account Number363501010282850
Bank NameUnion Bank of India
Branch NameMughalsarai
Branch Address867, Nai Basti, Bechupur, District- Chandauli
Branch StateUttar Pradesh
Branch DistrictChandauli
IFSC CodeUBIN0536351

Development Works

Demarcation of Plots

We have one plot of size 8082.11 sq. mtr.having 1 main entrance gate from the 30 m wide front road.

Boundary Wall

2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 7.50 mtr.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide Two nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.

Drain

Storm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide many type of trees all along the boundary wall & green area

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.

Community Buildings

We will construct and provide community hall for parties and programs for unitholders.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

We will have staircases which will be provided with emergency exit doors and emergency exit gates

Other Miscellaneous Work

NA

Documents

Sale Deed

No: 5908 | Date: 17-05-2025

Sale Deed

No: 5910 | Date: 17-05-2025

Sale Deed

No: 5909 | Date: 17-05-2025

Sale Deed

No: 5911 | Date: 17-05-2025

Extract of Khatauni

No: 1425-1430 | Date: -

Extract of Khatauni

No: Khatauni Order | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Extract of Khatauni

No: 1425-1430 | Date: -

Details of Encumbrances

Uploaded: 23-07-2025

Commencement Certificate

Uploaded: 08-07-2025

Proforma of Application Form

Uploaded: 08-07-2025

Proforma of Allotment Letter

Uploaded: 08-07-2025

Proforma of Conveyance Deed

Uploaded: 08-07-2025

Waste Disposal Plan

Uploaded: 08-07-2025

Water Supply Plan

Uploaded: 08-07-2025

Electricity Supply Plan

Uploaded: 08-07-2025

Development Work Plan

Uploaded: 08-07-2025

Affidavit

Uploaded: 23-07-2025

CA CERTIFICATE

Uploaded: 08-07-2025

ARCHITECT CERTIFICATE

Uploaded: 23-07-2025

ENGINEERS CERTIFICATE

Uploaded: 23-07-2025

Other

Uploaded: 29-07-2025

Proforma of Agreement for Sale

Uploaded: 08-07-2025

Permits

Orignal Permit NoGroup Housing/03084/VDA/BP/23-24/1125/19012024
Orignal Permit Date22-07-2025
Valid Upto21-07-2030
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto21-07-2033
End Date27-04-2030
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)GDAC Buildcon
Contractor AddressFlat No. 308, KGR Popular Apartment, Paharia, Varanasi
Architect NameGeometric Design Studio Private Limited (Sri Pradeep Kumar Gupta, Director)
Architect AddressS8-108-B3 A, DIG Colony Maqbool Alam Road, Varanasi-221002.
Architect Licence NumberCA/2009/44932
Structural Engineer NameRajan Singh
Structural Engineer AddressS-28, Sector 11 D, DLF Market, Faridabad, Haryana-121006
Mobile number(Project Co-ordinator)9794827860

Land Details

AFS

Showing 1 blocks with 102 units

Property Summary

Total Carpet Area

9713.01 m²

104549.87 ft²

Total Units

102

3 different types

Blocks & Floors

1

18 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:95.23 m²
Balconies:165
Parking ratio:0.00 per unit

Block A

102 units

Khasra Details

Total Area

8176.00 m²

88005.65 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No95, 100/5, 104/2, 106/4, 106/5, 108MI, 109/1, 123/10
Area(In Sq. Mt.)8176

Other Details

Contractor Name (if any)GDAC Buildcon
Contractor AddressFlat No. 308, KGR Popular Apartment, Paharia, Varanasi
Architect NameGeometric Design Studio Private Limited (Sri Pradeep Kumar Gupta, Director)
Architect AddressS8-108-B3 A, DIG Colony Maqbool Alam Road, Varanasi-221002.
Architect Licence NumberCA/2009/44932
Structural Engineer NameRajan Singh
Structural Engineer AddressS-28, Sector 11 D, DLF Market, Faridabad, Haryana-121006
Mobile number(Project Co-ordinator)9794827860