Have queries on this Project?
28.23636
77.86939
Showing 1 blocks with 29 units
Total Carpet Area
6542.20 m²
70419.59 ft²
Total Units
70
3 different types
Blocks & Floors
1
8 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3249.00 m²
34971.91 ft²
ON SITE DEMARCATION OF PLOT BOUNDARIES AND BLOCK CONSTRUCTION BOUNDARIES ARE MARKED AS PER DRAWING PROVIDED BY THE CONSULTANT.
STRUCTURAL BOUNDARY WALL CONSTRUCTING THE COLUMN AND BEAM ARRANGEMENTS, FOR AESTHETICS USING THE ADDITIONAL LIGHTING THE GRILL ELEMENTS WITH DECORATIVE FLOOR FINISH
IN THE SETBACKS USING CEMENT CONCRETE ROAD.
NA
UNDERGROUND WATER SUPPLY TANK USING FOR WATER SUPPLY IN THE BUILDING ALSO THIS WATER SUPPLY LINE USE FOR DRINKING WATER FOR EVERY HOUSE HOLD AN D COMMON DRINKING WATER FACILITY.
SEWERAGE SYSTEM IS DIRECT CONNECTED WITH COMMON SEWER LINE , EVERY HOUSE HOLD SEWER SYSTEM IS CONNECTED WITH MULTI PIPING SEWER SYSTEM.
DRAIN PIPELINE IS CONNECTED WITH SCHEME DRAIN SYSTEM, EVERY HOUSEHOLD DRAIN HAS MUTI TRACK SYSTEM FOR REDUCE THE CHOKING.
NA
AS PER GREEN AREA MARKED IN LAYOUT PLANTATION TOBE DONE.
AS PER ELECTRICAL LAYOUT, ELECTRICAL POINTS IN HOUSING UNITS AND COMMON AREA IS PROVIDED, STREET LIGHTS ARE PLACED ON BOUNDARY WALLS AS PER CONSULTANT DRAWING.
NOT APPLICABLE
NOT APPLICABLE, DIRECTLY CONNECTED WITH CENTRALIZED SEWER SYSTEM.
GARBAGE DUCT IS PROVIDED ON EACH FLOOR, WHICH IS COLLECTING ALL THE GARBAGE IN BASEMENT AND TRANSPORTED BY MUNICIPAL GARBAGE CAR.
RAIN WATER HARVESTING SYSTEM IS PROVIDING.
NOT APPLICABLE
FIRE FIGHTING SYSTEM IS INSTALLING AS PER FIRE FIGHTING NORMS, PROVISIONAL NOC ALSO OBTAINED FROM FIRE DEPARTMENT.
NOT APPLICABLE
FIRE STARE IS PROVIDED AS PER FIRE SAFETY NORMS
LEVELS OF STILT AND SETBACKS ARE MAINTAINED FOR EASY VEHICULAR CIRCULATION.
Kalindi Tower Kalindi Kunj is located in Bulandshahr.
Yes. Kalindi Tower Kalindi Kunj is registered under UPRERAPRJ368832/10/2025 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Kalindi Tower Kalindi Kunj is 11 August 2027.
Kalindi Tower Kalindi Kunj is developed by BULANDSHAHR DEVELOPMENT AUTHORITY.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.