RERA Received Date
Completion Date
RERA ID
262510.50
805735.51
SOUTH-18 M WIDE ROAD,WEST-9.0 M WIDE ROAD NORTH-KHASRA NO.-1195 & EAST LDA COLONY APPROACH ROAD
2.7 M all around. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.
Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.
Part of 6.0 M wide driveway all around the building block
underground water to be supplied through terrace tank.
Centralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and washing. overflow from the STP shall be connected to the Municipal sewerage system.
Storm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main road.
Beautifully landscaped area in front as per the required of LDA Norms.
"There are 4 type of trees proposed at site: which are kachnar, gulmauhar, ashok, and neem."
A well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel.
NA
Centralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, & washing system . Overflow from the STP shall be connected with the Municipal sewerage system.
"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point. for the solid waste management."
A well designed rain water harvesting system has been planned along with 2 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes.
We will use solar energy & LED light fittings for all the common areas
Fire NOC is obtained from the fire departments and all the works of fire fighting shall be done as per the NOC
N.A.
Exits from each and every point has been planned and proposed as per norms in case of emergency.
N.A.
Showing 1 blocks with 14 units
Total Carpet Area
4139.46 m²
44556.73 ft²
Total Units
52
2 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3198.96 m²
34433.29 ft²