Launch Date
Completion Date
RERA ID
26.2720
80.2041
Demarcation of Plots will be done by brick work up to 1.5ft height.
Brick work boundary wall is already present at site, however, repairing work has to be done which will be done followed by plaster work.
From the main entrance gate we have 4 inch thick RCC road through out the project. The width of the road will be as per sanctioned plan.
Will be of interlocking tiles.
Will be dine through underground water tank which will be filled through 2 pumps.
Modular sewerage system shall be provided. All sewerage water shall be connected with the municipal sewerage system just outside our Plot.
Storm water shall be provided. Storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water harvesting pit for the recharge the ground water and overflow shall be connect with municipal drain line
Open area will be provided as per sanctioned plan. (No park)
NA
We will design and implement the system as per local electricity board and will consider centralized transformer, HT panel, LT Panel, Feeder pillar and DG back for common service like external lighting, pump room etc.
NA
Modular sewerage system shall be provided. All sewerage water shall be connected with the municipal sewerage system just outside our plot
There are a proper garbage collection area provided for the solid waste management
Rain water harvesting system will be provided at site
We will use LED lights fitting in external area as well as solar lights. in pump room also shall have energy efficient motor. And we will suggest to individual also to use
NA
NA
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
12804.33 m²
137824.53 ft²