ONGOINGActive

JMD SUBURBIO-1

GURUGRAM, BADSHAHPUR ST
20-10-2020
Launch Date
ONGOING
Type
2024-12-30
Completion Date

Overview

Launch Date

20-10-2020

Completion Date

2024-12-30

RERA ID

RERA-GRG-762-2020

Basic Details

Project NameJMD SUBURBIO-1
Project IDRERA-GRG-762-2020
Project TypeONGOING
Applicant TypeCompany
Submission Date20-10-2020 08:58:07 PM
Builder NameJMD LIMITED
CINU74899DL1989PLC038093
PANXXXX244K
Emailinfo@jmdgroup.in
Websitehttp://jmdgroup.in
Phone (Mobile)9899006699
Phone (Landline)01244636363
Registered Address3RD FLOOR, JMD REGENT SQUARE, M.G. ROAD, GURGAON, HARYANA 122001
Project AddressSECTOR 67
DistrictGURUGRAM
TehsilBADSHAHPUR ST

Bank Details

Bank NamePUNJAB NATIONAL BANK
Account Number12381652000148
IFSC CodePUNB0123810
MICR Code110022186
Branch Code23810

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Sunil Bedi & Mr Karan Bedi , Address: W-24, Greater Kailash 1, New Delhi 110030 Mobile no. 9899006699 Email id- karanbedi@jmdgroup.in
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area2.912007 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land4.237 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.000053
CONSTRUCTION OF ROADS0.2298
PAVEMENTS0
PARKS AND PLAYGROUNDS0.2298
GREEN BELTS0
VEHICLE PARKINGS1.337454
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0.1149
Total2.912007

Cost Details

Land Cost3910.20 Lakhs
Other Cost4023.27 Lakhs
Estimated Project Cost13916.02 Lakhs
Estimated Infrastructure Cost1179.39 Lakhs
Estimated Apartment Construction Cost4803.16 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 20-10-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 20-10-2020

NOC FOR HEIGHT CLEARANCE

Uploaded on: 20-10-2020

ELECTRICAL LOAD APPROVAL

Uploaded on: 20-10-2020

APPROVAL OF FIRE FIGHTING SCHEME

Uploaded on: 20-10-2020

APPROVED SERVICE PLAN ESTIMATE

Uploaded on: 20-10-2020

OCUPANCY CERTIFICATE

Uploaded on: 20-10-2020

CHANGE OF DEVELOPER

Uploaded on: 20-10-2020

LOI

Uploaded on: 20-10-2020

ZONING PLAN

Uploaded on: 20-10-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 02-03-2022

FLOOR PLAN

Uploaded on: 05-03-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 05-03-2022

WATER SUPPLY PLAN

Uploaded on: 05-03-2022

SEWERAGE PLAN

Uploaded on: 05-03-2022

ROAD PLAN

Uploaded on: 05-03-2022

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 05-03-2022

DEMARCATION PLAN

Uploaded on: 05-03-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 05-03-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 05-03-2022

ELEVATION PLAN

Uploaded on: 05-03-2022

SECTION PLAN

Uploaded on: 05-03-2022

PARKING PLAN

Uploaded on: 05-03-2022

ELECTRICAL PLAN

Uploaded on: 05-03-2022

SWM PLAN

Uploaded on: 05-03-2022

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 05-03-2022

BUILDING PLANS

Uploaded on: 05-03-2022

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 05-03-2022

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 05-03-2022

STREET LIGHT PLAN

Uploaded on: 05-03-2022

LANDSCAPE PLAN

Uploaded on: 07-04-2022

SUPER IMPOSED

Uploaded on: 07-04-2022

STRUCTURE DRAWINGS

Uploaded on: 07-04-2022

Statutory Approvals

ENVIRONMENT CLEARANCEDate: NAStatus: ALREADY BEEN OBTAINED
BR-IIIDate: NAStatus: ALREADY BEEN OBTAINED
ELECTRICAL SCHEME APPROVALDate: NAStatus: ALREADY BEEN OBTAINED
SERVICE PLAN AND ESIMATEDate: NAStatus: ALREADY BEEN OBTAINED
FIRE NOCDate: NAStatus: ALREADY BEEN OBTAINED
OCCUPANCY CERTIFICATEDate: 18-07-2018Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: Yes
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO TOWN & COUNTRY PLANNING
WATER SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
STORM WATER DRAINAGESUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO TOWN & COUNTRY PLANNING
STREET LIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
SECURITY AND FIRE FIGHTINGSUBMITTED TO TOWN & COUNTRY PLANNING
PLAYGROUNDS AND PARKSSUBMITTED TO TOWN & COUNTRY PLANNING
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO TOWN & COUNTRY PLANNING
SHOPPING AREASUBMITTED TO TOWN & COUNTRY PLANNING
RENEWABLE ENERGY SYSTEMSUBMITTED TO TOWN & COUNTRY PLANNING
SCHOOLSUBMITTED TO TOWN & COUNTRY PLANNING
HOSPITAL/DISPENSARYSUBMITTED TO TOWN & COUNTRY PLANNING
ANY OTHERSUBMITTED TO TOWN & COUNTRY PLANNING
STPSUBMITTED TO TOWN & COUNTRY PLANNING
UNDER GROUND WATER TANKSUBMITTED TO TOWN & COUNTRY PLANNING
RAIN WATER HARVESTINGSUBMITTED TO TOWN & COUNTRY PLANNING
ELECTRICAL SUB STATIONSUBMITTED TO TOWN & COUNTRY PLANNING
SECTOR RAODSUBMITTED TO TOWN & COUNTRY PLANNING

NOC

ROADSProvider: HUDAApproval Status: Approved
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDAApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Pending

Project Team

Authorized Representative

MR KARAN BEDI
Name
MR KARAN BEDI
PAN
XXXX054B
Email
karanbedi@jmdgroup.in
Mobile
9899006699
Landline
01244636363
Address
W-24 Greater Kailash -1 Delhi 110048

Managing Director/CEO

MR SUNIL BEDI
Name
MR SUNIL BEDI
PAN
XXXX748E
Email
sunilbedi@jmdgroup.in
Mobile
9811034823
Landline
01244636363
Address
W-24 Greater Kailash -1 Delhi 110048

Directors

MR SUNIL BEDI
Name
MR SUNIL BEDI
PAN
XXXX748E
Email
sunilbedi@jmdgroup.in
Mobile
9811034823
Landline
01244636363
Address
W-24 Greater Kailash -1 Delhi 110048
MR KARAN BEDI
Name
MR KARAN BEDI
PAN
XXXX054B
Email
karanbedi@jmdgroup.in
Mobile
9899006699
Landline
01244636363
Address
W-24 Greater Kailash-1 New Delhi 110048
MRS PINKY BEDI
Name
MRS PINKY BEDI
PAN
XXXX0000
Email
pinkibedi@jmdgroup.in
Mobile
9810014444
Landline
01244636363
Address
W-24 Greater Kailash -1 New Delhi 110048
MR TILAK RAJ WADHWA
Name
MR TILAK RAJ WADHWA
PAN
XXXX678J
Email
info@jmdgroup.in
Mobile
9810947947
Landline
01244636363
Address
281 Pant Nagar Jangpura New Delhi 110014
MR NIRAJ KISHAN
Name
MR NIRAJ KISHAN
PAN
XXXX309D
Email
nirajimpex@yahoo.co.in
Mobile
9810010024
Landline
01244636363
Address
C-416 Safdarjung Development Area Hauzkhas New Delhi 110016

Contact Details

Project ContactEmail: jmd@jmdgroup.inMobile: 9540054388Landline: 01244636363
Project Contact PersonName: RAJESH SRIVASTAVAEmail: jmd@jmdgroup.inMobile: 9540054388Landline: 01244636363

Land Details

Land Area2.912007 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land4.237 (Acre)

Land Usage

Land Cost3910.20 Lakhs
Other Cost4023.27 Lakhs
Estimated Project Cost13916.02 Lakhs
Estimated Infrastructure Cost1179.39 Lakhs
Estimated Apartment Construction Cost4803.16 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
stp18.72
Other0
strret light14.71
Shopping area0
renewable energy7.45
Roads & Pavements95.35
Water Supply System131.3
Storm Water Drainage48.32
Parks and Playgrounds5.22
rain water harvesting7
electrical sub station146.34
under ground water tank44.95
Electricity Supply System304.82
Clubhouse/community centres0
fire alarm and fire fighting162.19
Sewerage treatment & garbage disposal86.45

Quarterly Infrastructure Expenditure

2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electrical Sub station0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain water Harvesing00--
Rain water Harvesting--00
Renewable Electrical energy----
Renewed Energy--00
Roads & Pavements0000
STP0000
Security Fire Fighting0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Under Ground Tank--00
Under Grounfd Tank00--
Water Supply System0000
renewd Energy00--
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electrical Sub Station----
Electrical Sub station0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Rain water Harvesing----
Rain water Harvesting0000
Renewable Electrical energy----
Renewed Energy0000
Roads & Pavements0000
STP0000
Security Fire Fighting0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Street Light0000
Under Ground Tank0000
Under Grounfd Tank----
Water Supply System0000
renewd Energy----
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres---0
Electrical Sub Station----
Electrical Sub station---0
Electricity Supply System---0
Other---0
Parks and Playgrounds---0
Rain water Harvesing----
Rain water Harvesting---0
Renewable Electrical energy---0
Renewed Energy---0
Roads & Pavements---0
STP---0
Security Fire Fighting---0
Sewerage treatment & garbage disposal---0
Shopping area---0
Storm Water Drainage---0
Street Light---0
Under Ground Tank---0
Under Grounfd Tank----
Water Supply System---0
renewd Energy----
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electrical Sub Station----
Electrical Sub station0---
Electricity Supply System0---
Other0---
Parks and Playgrounds0---
Rain water Harvesing----
Rain water Harvesting0---
Renewable Electrical energy0---
Renewed Energy0---
Roads & Pavements0---
STP0---
Security Fire Fighting0---
Sewerage treatment & garbage disposal0---
Shopping area0---
Storm Water Drainage0---
Street Light0---
Under Ground Tank0---
Under Grounfd Tank----
Water Supply System0---
renewd Energy----
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-00-
Electrical Sub Station-3036.05-
Electrical Sub station----
Electricity Supply System-00-
Other-00-
Parks and Playgrounds-00-
Rain water Harvesing----
Rain water Harvesting----
Renewable Electrical energy----
Renewed Energy-029.8-
Roads & Pavements-00-
STP----
Security Fire Fighting----
Sewerage treatment & garbage disposal-00-
Shopping area-00-
Storm Water Drainage-00-
Street Light----
Under Ground Tank----
Under Grounfd Tank----
Water Supply System-00-
renewd Energy----

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEGRANITE & TILES WORK
WALL FINISHING DETAILSGRANITE WORK, PLASTIC PAINTS
KITCHEN DETAILSGRANITE & TILES WORK
BATHROOM FITTINGSHIND WARE, JAGUAR,TOTO
WOOD WORK ETCIVORY TEAK WOOD
DOORS AND WINDOS FRAMESPOWDER COATED ALUMINIUM SECTION
GLASS WORKTOUGHENED GLASS WORK
ELECTRIC FITTINGSANCHOR AROMA
CONDUCTING AND WIRING DETAILSPVC CONDUCTING, POLY CAB WIRING
CUPBOARD DETAILSTEAK WOOD
WATER STORAGER CC TANK
LIFT DETAILSJOHNSON LIFTS SIX NOS WITH MAX. CAPACITY 680 KGS
EXTERNAL GLAZINGSTOUGHENED GLASS 12 MM THICK
WINDOWS/GLAZINGSTOUGHENED GLASS 6 MM THICK
DOORSFLUSH DOORS
MAIN DOORSGLASS DOORS
INTERNAL DOORSMANDARIN WOOD FLUSH DOORS
AIR CONDITIONINGNON AC BUILDING WITH PROVISION OF DX SYSTEM COOLING FOR SHOPS. ALSO SPILT AC IN IMPERIAL SUITES
ELECTRICAL FITTINGSANCHOR AROMA
CNG PIPE LINENA NOW
PROVISION OF WIFI AND BROADBAND FACILITYYES
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT SHADE IVORY
INTERNAL FINISHINGPLASTIC PAINTS

Unit-wise Specifications

TOILET
FLOORNA
WALLSNA
CEILINGNA
COUNTERSNA
SANITARY WARE/CP FITTINGSNA
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES
WALLSPLASTIC PAINTS
CEILINGPOP FALSE CEILING
COUNTERSGRANITE TOP COUNTERS
FIXTURESTOTO , HIND WARE , JAGUAR
KITCHEN APPLIANCESPHILIPS,LG MAKE
SIT-OUTS
FLOORNA
WALLS & CEILINGNA
RAILINGSNA
FIXTURESNA
BED ROOMS
FLOORNA
WALLSNA
CEILINGNA
WARDROBESNA
MASTER TOILET
FLOORVITRIFIED TILES
WALLSPLASTIC PAINTS
CEILINGPOP FALSE CEILING
COUNTERSGRANITE COUNTERS
SANITARY WARE/CP FITTINGSTOTO , HIND WARE , JAGUAR
FITTING/FIXTURESTOTO , HIND WARE , JAGUAR
MASTER BEDROOM/DRESSROOM
FLOORWOODEN FLOORING
WALLSPLASTIC PAINTS
CEILINGPOP FALSE CEILING
MODULAR WARDROBESYES
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSPLASTIC PAINTS
CEILINGPOP FALSE CEILING
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORTILES
WALLS & CEILINGTILES
TOILETNA
BALCONYTILES

Fee Details

Payment 1
amount:750000
cheque no:146589
draft date:31-08-2021
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 2
amount:1913500
cheque no:146781
draft date:14-02-2022
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK
Payment 3
amount:430000
cheque no:39231
draft date:19-09-2018
payable to:HRERA Gurugram
payee bank:KOTAK MAHINDRA BANK (RTGS)