There are 76 residential plots- 24 units of 105 sqm, 23 units of 94.5 sqm and other varying sizes as per approved map. there is also 1 commercial plot of 411.67 sqm.
2.5 m high and 230 mm thick brick work and RCC work in column and beam. At a certain point of boundary wall there would be a logo of the project or some highlighting piece which would give a beautiful iconic design to the boundary wall.
From the main entrance gate we have 80 mm thick interlocking brick/ RCC road through out the project. Whose wideness starts from 15 mtr approx and in the internal areas roads are of 7.5 mtr and 9mtr wide.
We shall provide footpaths consisting of interlocking tiles of thickness 80mm/RCC along all roads as part of the project.
Water supply needs will be fulfilled through underground tank of capacity 100KLD.
Modular sewerage system shall be provided. All sewerage water shall go to STP of capacity 90 KLD and overflow from the STP shall be used for irrigation.
Storm water drain shall be provided. Storm water from roads and other landscape area shall be connected to the storm water drain channel and go to the rainwater harvesting pit for recharge of ground water.
We will provide 4 different green areas admeasuring about 2642 sqmtr. and the green area will have different gaming facilities for kids.
we will provide about 205 tress/plants as part of the project planted along road, boundary wall and within the green areas.
We will design and implement the system as per local electricity board and will install centralized Transformer, HT Panel, LT Panel and feeder pillar for common services like external lighting, Fountain, STP, Pump room Etc. Also install 15 LED street lights on roads.
Not Applicable
modular sewerage system shall be provided. All sewerage water shall go to the STP of capacity 90 KLD and overflow from the STP shall be used for irrigation.
Proper garbage collection area will be provided throughout the project for solid waste management.
We will suggest to individuals to use low flow fixtures as well as dual flush cistern and raw water harvesting system to reduce the water consumption and improve ground water level.
We will use 15 LED street lights in street lighting powered by solar energy and in pump room all the equipment will have energy efficient motors and parts.
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Jbbr Kanvas Phase 1 is located in Lucknow.
Yes. Jbbr Kanvas Phase 1 is registered under UPRERAPRJ977409/07/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Jbbr Kanvas Phase 1 is 28 February 2031.
Jbbr Kanvas Phase 1 is developed by SAI BUILDERS.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.