Launch Date
Completion Date
RERA ID
26.777842
81.021612
Demarcation of plot admeasuring of total area 38919.26 sqmt has been done at site.
Boudary wall 7.5 ft height brickwork and MS Railing completed all around the plot boundary.
From the main entrance gate we have 80 mm thick interlocking Paver /RCC road through out the project. Whose width shall be 6mt as per the architecture drawing.
Interlocking paver to be provided on the foothpath as per drawings
We provide water from our own 2 nos of borewells constructed under our premises through underground tank and overhead tank on each block.
Sewerage network shall be Provided. All Sewerage water shall go to the STP and overflow from the STP shall be connected to the Trunk of sushant golf city network.
Storm water from Roads/ Building Terrace and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with external drainage of sushant golf city drainage work.
We will provide green area with the different activities with landscape features play area for kids.
Different varities of plants shall be provided along with the boundary and in landscape area as per the drawing
We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG backup for common service like External lighting, Fountain, STP, Pump room and DG backup maximum upto 3 kva to be provided to each flat/Dwelling units through dual metering sysytem etc.
Promoter will provide Club House/Community center featuring a swimming pool, seating area, and garden in upcoming phases. All allottees from every phase will have access to these amenities.
Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Trunk sewerage system of Sushant Golf Hitech City. Treated water shall be used for purposes of irrigation and flushing.
There are a proper garbage collection area provided for the solid waste management.
Rain water harvesting to be to improve the ground water level. The treated water from STP shall be used for irrigation and for flush water.
We will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
This Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas and inside the flats and basements as per the NBC and local fire norms.
NA
We will have fire staircases for Emergency Evacuation.
The project consists of Block B having 2 towers (Towers 3&4) in this project.
Showing 1 blocks with 66 units
Total Carpet Area
14762.81 m²
158905.41 ft²
Total Units
124
3 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6815.00 m²
73355.98 ft²