NewActive

INFINITY HEIGHTS

Lucknow, Uttar Pradesh
01-04-2024
Launch Date
New
Type
31-10-2028
Completion Date

Overview

Launch Date

01-04-2024

Completion Date

31-10-2028

RERA ID

UPRERAPRJ383201/08/2024

Basic Details

Project TypeNew
Project CategoryMixed
Total area in round figure (Sq.mt.)2386.45
Project NameINFINITY HEIGHTS
Registration Fee (in Rs.)27750
Address23, VIDHAN SABHA MARG, LUCKNOW, UTTAR PRADESH-226001
Village/Locality/Sector etc.ALIGANJ, LUCKNOW
StateUttar Pradesh
Project Duration (In month)55
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date01-04-2024
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)11341
Proposed Completion Date31-10-2028

Location

Latitude

26.843849

Longitude

80.943047

Bank Details

Account Details
Name of the AccountSV AND EINAR BUILDERS LLP COLLECTION ACCOUNT- INFINITY HEIGHTS
Account Number6649071890
Bank NameKOTAK MAHINDRA BANK
Branch NameLUCKNOW- SHAHJANAF ROAD
Branch Address17, G.F SPEED BUILDING, 3RD SHAHJANAF ROAD, OPP. NARAYAN, LUCKNOW-226001
IFSC CodeKKBK0000141
Branch DistrictLucknow
Branch StateSelect
Branch Email Address[email protected]
Separate Account Details
Name of the AccountSV AND EINAR BUILDERS LLP SEPARATE ACCOUNT- INFINITY HEIGHTS
Account Number6649071883
Bank NameKOTAK MAHINDRA BANK
Branch NameLUCKNOW- SHAHJANAF ROAD
Branch Address17, G.F SPEED BUILDING, 3RD SHAHJANAF ROAD, OPP. NARAYANA, LUCKNOW-226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeKKBK0000141
Transaction Account Details
Name of the AccountSV AND EINAR BUILDERS LLP RERA TRANSACTION ACCOUNT- INFINITY HEIGHTS
Account Number6649071906
Bank NameKOTAK MAHINDRA BANK
Branch NameLUCKNOW- SHAHJANAF ROAD
Branch Address17, G.F SPEED BUILDING, 3RD SHAHJANAF ROAD, OPP. NARAYANA, LUCKNOW-226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeKKBK0000141

Development Works

Demarcation of Plots

Plot size of 2631 sqm, but considered 2386.45sqm after deducting land surrendered for road widening

Boundary Wall

2m High and 230mm thick concrete work and RCC work in column and beam. At the center face of boundary wall there would be a logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have 80mm thick interlocking brick/RCC road through out the project, whose wideness starts from 10mtrs.

Footpaths

We would not provide any footpath

Water Supply Including Drinking Water Facilities

We will provide two nos. of pump for the requirement of blocks through underground pipelines.

Sewer System

Modular Sewerage system shall be provided. All sewerage water shall be go the STP and overflow from the STP shall be connected with the Municipal sewerage system when come into force.

Drain

Storm water shall be provided. Storm water from roads and other landscape area shall be connect to the storm water drain channel and go to the rain water Harvesting pit for recharge the Ground water and overflow shall be connect with the Municipal Drain line.

Parks

We will provide green area with the different activities and the green area will have gaming facilities for kids.

Tree Planting

We will provide terrace planters and green area.

Design For Electric Supply Including Street Lighting

We will design and implement the system as per local electricity board and will consider centralized Transformer, HT panel, LT panel, Feeder Pillar and DG backup for common services like External lighting fountain, STP, Pump room, etc.

Community Buildings

There is no community buildings in the project.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be provided. All sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when come into force.

Solid Waste Management And Disposal System

There are proper garbage collection Area provided for the solid waste management.

Water Conservation System

We will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.

Fire Protection And Fire Safety System

This project has only residential flats. Hence we will provide Fire Fighting facility in common areas while individual owner can install their own system as per their and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

There is no provision of Social Infrastructure.. Public amenities are provided in the project as per plan.

Emergency Evacuation Services

We have proposed common pimp room. All Sewerage shall be go to the STP. Roads and other areas shall be connect to the storm water drain channel and go to the rain water.

Other Miscellaneous Work

there is no other miscellaneous work.

Documents

Registry Document

No: SUBIN-UPUPSHCIL0105292195945006Q | Date: 13-04-2018

Registry Document

No: 1584 | Date: 17-02-2023

Registry Document

No: 23789 | Date: 13-04-2018

Details of Encumbrances

Commencement Certificate

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

General body resolution for AoA (if Authorized Entity is AoA)

Notarized Affidavit for completion of balance development work

Details of Encumbrances

Uploaded: 15-07-2024

Other Plan(If Any)

Uploaded: 29-04-2024

Proforma of Application Form

Uploaded: 01-04-2024

Proforma of Allotment Letter

Uploaded: 01-04-2024

Proforma of Conveyance Deed

Uploaded: 01-04-2024

Waste Disposal Plan

Uploaded: 01-05-2024

Water Supply Plan

Uploaded: 01-05-2024

Electricity Supply Plan

Uploaded: 01-05-2024

Development Work Plan

Uploaded: 01-04-2024

Affidavit

Uploaded: 01-05-2024

CA CERTIFICATE

Uploaded: 15-07-2024

ARCHITECT CERTIFICATE

Uploaded: 01-04-2024

ENGINEERS CERTIFICATE

Uploaded: 01-04-2024

Other

Uploaded: 01-05-2024

Proforma of Agreement for Sale

Uploaded: 01-04-2024

Permits

Orignal Permit NoResiComm Building/09778/LDA/BP/20-21/1708/18102023
Orignal Permit Date09-11-2023
Valid Upto08-11-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto08-11-2031
End Date31-10-2028
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen

Project Team

Contractor Name (if any)SELF
Contractor Address3A ORIENTAL HOUSE GOKHLEY MARG, HAZRATGANJ, LUCKNOW
Architect NameMr. Rajnish Agarwal
Architect AddressHIG-42 SECTOR-E, ALIGANJ, LUCKNOW
Architect Licence NumberCA/95/18919
Structural Engineer NameMr. Saran
Structural Engineer Address243, VIMAL KHAND, GOMTI NAGAR, LUCKNOW
Mobile number(Project Co-ordinator)9839064364

Land Details

AFS

Showing 1 blocks with 106 units

Property Summary

Total Carpet Area

6040.63 m²

65020.74 ft²

Total Units

103

4 different types

Blocks & Floors

1

10 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:58.65 m²
Balconies:71
Parking ratio:0.00 per unit

Block 1

106 units

Khasra Details

Total Area

2631.00 m²

28319.82 ft²

1 plot
Plot
TypePlot
Khasra/Plot No23
Area(In Sq. Mt.)2631

Other Details

Contractor Name (if any)SELF
Contractor Address3A ORIENTAL HOUSE GOKHLEY MARG, HAZRATGANJ, LUCKNOW
Architect NameMr. Rajnish Agarwal
Architect AddressHIG-42 SECTOR-E, ALIGANJ, LUCKNOW
Architect Licence NumberCA/95/18919
Structural Engineer NameMr. Saran
Structural Engineer Address243, VIMAL KHAND, GOMTI NAGAR, LUCKNOW
Mobile number(Project Co-ordinator)9839064364