27.657032
77.549082
Total Units
0
0 unit types
Carpet Area
0 ft²
0.00 m² · carpet only, excludes balcony
Blocks & Floors
0
0 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 0 ft² (0.00 m²)Balconies 0Parking per unit 0.004 of 4 rows list no units (1 floor is empty), so they add nothing to these totals
Showing 4 of 4 rows · 3 of 12 columns
| Block | Floor | Type |
|---|---|---|
| — | — | — |
| — | — | — |
| — | — | — |
| — | — | — |
Total Plot Area
11.32 acres
45,809.00 m² · plot area
The project land , the plots, roads, parks and other amenities will be demarcated in size, dimension and orientation as per the map approved. There are total of 154 residential plots from No. 3 to No. 156 on the layout. No.1 and 2 are the sector shopping area and convinient shop area (to be sold as plot only)
A 6 to 8 feet high boundary wall will be constructed in the project. The foundation of the boundary wall will be 3 to 4 feet deep. The wall will be constructed in brick and mortar. Boundary wall will be plastered and painted with the all weather paint
the roads of width 9 m and 7.5 m will be constructed in the project. The top surface will be of interlocking paving tiles of 80 mm depth. The paver blocks will be laid on the sand bed. Underneath, the compacted granular layer and the compacted subgrade will be constructed.
Interlocking paver block of 60 mm depth will be installed in the footpath areas of the project. The paver block will be laid over the sand bed and the the compacted layers underneath
The ground water supply will be made to each unit through submersible pumps. The individual units will install the pumps of 1.5 HP
The Septic tanks for each unit will be constructed in the project. The size will be as per the design with capacity of around 2000 l
The lined and covered surface drains will be constructed in the project . The trapezoidal lined drains will have the minimum width and height of 200mm. The drain will be laid to ensure quick under gravity flow towards the designated chambers for rapid egress of the drainage water
4 lush green parks will be developed in the project as per the landscape plan.
Trees will be planted in the project . The tress will be selected as per the local soil and suitability. Trees will be planted along the periphery of the parks and at all suitable locations of the project.
A separate transformer will be installed in the project as per the load approved by the DVVNL. The Lighting arrangements will be made for the common areas of the project along with the electrical connection to each unit. 4 m high street lights will be erected in the project with lumens as per requirement. The distribution boxes will be placed on the street light poles. The transformer will be of 750kW.
Not Applicable
Not Applicable
Garbage Collection center in 3 brackets will be developed in the project covering approximately 45 sqare meters
A 10000 ltr capacity rain water harvesting pit will be installed in the project in the area of aaprox 8m x 3m . The runoff will be directed towards the collection chamber and the multistage filtration arrangment will be made of varying size granular material. The perforated pipe will lead the filtered water to the ground
Not Applicable
Not Applicable
Not Applicable
Not Applicable
As per the requirements of the project.
Highway Residency is located in Mathura.
Yes. Highway Residency is registered under UPRERAPRJ838407/01/2026 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Highway Residency is 21 September 2030.
Highway Residency is developed by K K GROUP.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.