Total Units
29,997
4 unit types
Carpet Area
1,76,96,245 ft²
16,44,036.59 m² · carpet only, excludes balcony
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Average carpet area 590 ft² (54.81 m²)Balconies 222Parking per unit 0.00
All blocks
Showing 50 of 118 rows · 7 of 12 columns
| Block | Floor | Type | Units | Carpet Areaper unit | Balconies | Balcony Areatotal |
|---|---|---|---|---|---|---|
| 1 | 1 | 2 BHK | 001 | 657 ft²61.04 m² | 3 | 92 ft²8.57 m² |
| 1 | 1 | 2 BHK | 002 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 003 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 1 BHK | 004 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 1 BHK | 005 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 1 BHK | 006 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 1 BHK | 007 | 370 ft²34.33 m² | 1 | 29 ft²2.70 m² |
| 1 | 1 | 1 BHK | 008 | 369 ft²34.32 m² | 1 | 29 ft²2.70 m² |
| 1 | 1 | 1 BHK | 009 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 1 BHK | 10 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 2 BHK | 011 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 012 | 641 ft²59.52 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 013 | 660 ft²61.29 m² | 3 | 92 ft²8.57 m² |
| 1 | 1 | 2 BHK | 014 | 657 ft²61.04 m² | 3 | 92 ft²8.57 m² |
| 1 | 1 | 2 BHK | 015 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 016 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 1 BHK | 017 | 412 ft²38.28 m² | 1 | 30 ft²2.77 m² |
| 1 | 1 | 1 BHK | 018 | 412 ft²38.28 m² | 1 | 29 ft²2.70 m² |
| 1 | 1 | 2 BHK | 019 | 641 ft²59.52 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 020 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 1 | 2 BHK | 021 | 660 ft²61.29 m² | 3 | 92 ft²8.57 m² |
| 1 | 2 | 2 BHK | 101 | 657 ft²61.04 m² | 3 | 92 ft²8.57 m² |
| 1 | 2 | 2 BHK | 102 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 103 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 1 BHK | 104 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 105 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 106 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 107 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 108 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 109 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 110 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 2 BHK | 111 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 112 | 641 ft²59.52 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 113 | 660 ft²61.29 m² | 3 | 92 ft²8.57 m² |
| 1 | 2 | 2 BHK | 114 | 657 ft²61.04 m² | 3 | 92 ft²8.57 m² |
| 1 | 2 | 2 BHK | 115 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 116 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 1 BHK | 117 | 412 ft²38.28 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 1 BHK | 118 | 412 ft²38.28 m² | 1 | 30 ft²2.77 m² |
| 1 | 2 | 2 BHK | 119 | 641 ft²59.52 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 120 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 2 | 2 BHK | 121 | 660 ft²61.29 m² | 3 | 92 ft²8.57 m² |
| 1 | 3 | 2 BHK | 201 | 657 ft²61.04 m² | 3 | 92 ft²8.57 m² |
| 1 | 3 | 2 BHK | 202 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 3 | 2 BHK | 203 | 657 ft²61.04 m² | 2 | 58 ft²5.40 m² |
| 1 | 3 | 1 BHK | 204 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 3 | 1 BHK | 205 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 3 | 1 BHK | 206 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
| 1 | 3 | 1 BHK | 207 | 370 ft²34.33 m² | 1 | 30 ft²2.77 m² |
| 1 | 3 | 1 BHK | 208 | 369 ft²34.32 m² | 1 | 30 ft²2.77 m² |
Total Plot Area
0.809 acres
3,272.54 m² · plot area
NA
Part Area covered with boundary wall made with bricks.
"RCC/ Black Top roads will be provided within the project as per the requirement "
levelleved, some part is cemented and some part have interlocking tiles
raw water supplied from overhead tank , which are filled by ground water through submersible pump. This raw water needs to be treated through RO by Flat Buyers before consuming . RO not in Builder scope.
Under ground system outside building connected to septic tank which is further connected to Main Govt. Sewer Line outside the Project.
terace water will go to water harvesting pits. Roads, Side n front drain will lead excess water outside the project
in front one park has been developed along with plantation and sitting area.
trees has been planted inside and outside the project
HT line shall be taken from UPPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based
NA
sewage and sullage water will be drained out through internal/underground piplenes connected to septic tank and further connected to main Govt. Sewer line outside the project
Kitchen and other caste shall be collected manually by the agency assigned for housekeeping and shall be disposed as per regulation of waste management.
water Harvesting pits have been developed for water Conservation.
Top two floor will be provided for Solar heating water .
fire safety equipments and measures have been provided as per Fire Norms Applicable
Retail shops are be provide as part of commercial area to be sold separately by developers.
Stairs has been provided as approved by fire department
as per plan
Heritage Greens is located in Mathura.
Yes. Heritage Greens is registered under UPRERAPRJ7479 with the Uttar Pradesh RERA (UP-RERA), ensuring transparency and buyer protection.
As per the RERA filing, the expected possession date for Heritage Greens is 28 June 2017.
Heritage Greens is developed by RADHA TOWER SKIPPERS PVT LTD.
Yes, home loan facilities are available from most major banks. You can compare interest rates and check your eligibility through our home loan services.