This is two plots connected in heptagon shaped , having a frontage of 30m with 1 entry and 1 exit gate from a 12m front wide road and a 9m internal roads . Site is bounded as follows ;East - Chak Road , West-Main Road (12m) , North - Nali , South -Others plot.
3m high and 225 mm thick Boundary wall designed . RCC work in column and beam will be used as per design.
Paver/ Trimix based road will be created for all internal road works with concrete pavers at certain junction points.
All internal roads will have 1.5m wide footpath on 40-60mm thick concrete pavers or equivalent finishes.
Pumps of 225 LPM at 100mtrs. overhead shall be provided with onw working and another on standby.
Sewage Treatment Plant (SLD) of 85 KLD Capacity with STP treated water usage in horticulture and one standby
The green area is designed to recharge its rainwater and the hard pavement / road is sloped gently towards the main road where it connects to the main storm water drain along the main road.
Open green area of 1690.47 sq. metres is provided as per the sanction plan .
Lagerstromeia indica (156) , Eugenia (15) , Sweetiana Mahogany (43), Michalia champaca (23) , Lagerstromia flos reginae (10) ,Canocarpus (11), Ficus Lyrata (11) , Buddha belly Bamboo (45) , Raphis Palm (24) , Pandanus bapyistii (25) , ficus safari (20) , Adenium (3) are being provided.
Street /landscape lighting shall be provided
Community area is included in Tower-1 (Ground and First Floor respectively as in the sanction map ), which shall be accessible to all residents.
Sewage Treatment Plan (STP) of 85 KLD capacity shall be provided. The treated water shall be used in horticulture , flushing , carwash and excess water shall be discharged into the municipal sewer as per site
There are a proper garbage collection area provided for the solid waste management .
In total 3 Rain Water Harvesting facilities and 2 borewalls shall be provided and sewage water shall be recycled to the extent feasible
Solar panels shall be provided on terrace for renewal energy. Energy purchased from the grid/ power supply company and net metering will be done as per electricity supply authority guideline.
Fire Tender path shall be provided as per NBC. Fire Fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from Fire Department.
Sewerage, Storm water and water supply shall be provided. We have proposed common Pump Room with Primary Filteration , Transfer pumps to fill the domestic overhead tank . Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks . All sewage shall be go the STP for recycling the water. Strom water for roofs, roads and other area shall be connected to the Storm water drain channel and go to the Rainwater harvesting Pit for recharge the groundwater and overflow shall be connected with Municiple Drain
Balcony will also be used for evacuation . Assembly points areas will be demarcated for earthquake and other possible disasters
6m high, 12m of front with one entry , one exit gate of 5.5 m each and one 1.2 m gate for two wheeler entry . The gate is attached with a guard room
No: Reply against query received along with layout plan showing area of towers | Date: -
Total Area
8500.00 m²
91493.15 ft²