Launch Date
Completion Date
RERA ID
27.563531
77.660174
The project land of 4272.44 square meter wil be demarcated as per layout. The clear demarcation wil be done with boundary wall. The set backs to the building line will be maintained as per local by-lawas and fire department norms.
A 6 feet high boundary wall will be constructed . The wall will be earthquake residtant. The wall will be constructed in brick and mortar. The boundary wall will be plastered and painted.
The road work will be done in between the building line and the bounday wall. The subgrade will be compacted to the required density . The Granular Layer will be laid of min. 200mm thickness and compacted. The load bearing interlocking paver blocks will be laid of minimum thickness of 80 mm or the Pavement quality concrete will be done as per design.
The fottpaths will laid on compacted earth. The 60 mm pver blocks will be laid on the sand bed.
Ground wate will be supplied to the underground tank. The water from there through 3 inch PVC pipe will be lead to the terrance tanks. The PVC pipe line to the ach unit will originate from terrace tank.
The building will have the soil pipe arrangement connected to each unit . The pipe line will have the required bends and inspection locations. The sewer will lead to the manholes cum inspection camber and go to the diposa location.
The roff top drainage syetem along with peripheral drain will be installed in the project. The rectangular perpipheral drain will the grated openings for inspection. The top width of drain will be 300mm min and the cross-section will be designed as per the ground profile and the design discharge.
1 park of 457 square meter will be developed in the project as per landscape plan
Trees will be planted at the periphery of the park and along the boundary wall. The trees with ornamental and envioronmental values will be planted in the project
The electrcal distribution will be done to each unit of the project . The concealed line form the electrical deparment and the distribution boxes will be installed in the project and supplied to each unit.
Not Applicable
State of Art STP will be installed for the domestic requirement. The Multi stage tanks will be installed. The Sewage will be treated before the disposal
The solid waste colletion chutes and the disbins will be installed in the project .
Rain water harvesting arrangement with sedimentation pit of 4x3x1.5 m will be constructed for the capacity of min. 500000l. The bore of 450mm dia of perforated pipe to receed the filtered water to the ground water will be installed and filled with granular chips.
The project will inculde all feasible green building techniques. All wires will be selected to minimize the transmission loss. The common areas will have LED or better ligtings to reduce the energy consumption.
The fire fighting tank will be constructed and the wet and riser system with alarm system will be installed for access to each part of the proect. The water tank will be dedicated for firefighting only. The set back and building lines will assist the movement of fire fighting vehicle
Not Applicable
The staris will be dseigned to assist all to safely exit during the emergency. The design will especially consider the children and elderly movement.
All activities as per project requirement.
Showing 1 blocks with 112 units
Total Carpet Area
14981.55 m²
161259.91 ft²
Total Units
110
3 different types
Blocks & Floors
1
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
4272.74 m²
45991.35 ft²