Launch Date
Completion Date
RERA ID
26.251451
80.243189
Grubbing/cleaning, identification of Plots of demarcation of benchmarks Plot corner will demarcate with brick work pillars with plaster.
We already have the boundary, but it needs to be repaired with brick work and paint. Height of the boundary wall is 2.4 meter.
RCC trimix finish roads (M-25 Grade of concrete).
Interlocked pavers and cub stones.
MDPE (grade 80) Domestic Water Supply pipelines to plots from OHT. OHT/UGR will feed from municipal water supply.
RCC hume pipes (NP-3) distribution network to STP.
Saucer Drains / Catch basins Hume Pipes (NP-3) to RWH Structures. Overflow to Municipal Drain.
The Park is surrounded by MS Grill and Gates have also been provided for entry. We have provided paths inside the park also.
As per Landscape Plan.
Electrical Distribution through underground cabling from electrical substation to Plots. Street and park lighting 3.5/6.5/9 meters electric poles as per lay out.
Not applicable.
Treated water used (MDPE pipe use) for horticulture and road washing. Connectivity to STP in Township (Beyond Project Boundaries).
Door to door collection from plots to common segregation and disposal unit near vendors zone. Final disposal by Municipal system.
RWH structures to harvest rain water suitably located in parks/open spaces.
Not applicable.
Not applicable.
Common facilities like Community Hall, Schools and Playgrounds obtain within the Emerald Gulistan Township of which Phase is a part.
Not applicable.
CCTV/Telephone/Security in Township (Beyond project boundaries). Theme Wall on two sides of the project to enclose the project.
No: Volume No. 1 Book No. 5370 Pages No. 51 to 68 at Serial No. 528 | Date: 14-02-2011
Showing 1 blocks with 6 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
17791.34 m²
191504.20 ft²