Launch Date
Completion Date
RERA ID
26.251451
80.243189
Not Applicable
RCC framed structure wall with block including plaster.
Not Applicable.
Trimix Floor
CPVC pipeline as per manufacturers design/details. Source municipal supply through UGT/OHT for each toilet.
RCC hume pipes distribution network to STP (outside project domain in Township)
Saucer drains/catch basins Hume pipes to RWH structures. Overflow to municipal drain.
The park is one sided covered by MS Grill.
As per landscape plan.
underground and through cable tray cabling for each shops from metering feeder pillar and power connectivity from 33/11 KV power sub-station and 11/433 KV distribution sub-station in township. Power supply from KESCO. street and park lighting. External lighting as per layout.
Not applicable
treated water used for horticulture and road washing. Connectivity to STP in township (Beyond project boundaries).
Door to door collection and common segregation and disposal unit near vendors zone. Final disposal by municipal system.
We have already RWH structures to harvest rain water suitably located in Phase -4.
Not Applicable
Fire fighting system providing as per NBC 2016.
Common facilities like community hall, schools and playgrounds obtain within the Emerald Gulistan Township of which phase is a part.
Not applicable
CCTV/Telephone/Security in Township (beyond project boundaries). Theme wall on two sides of the project to enclose the project.
No: Book No. 1 Volume No. 5370 Pages No. 51 to 68 at Serial No. 528 | Date: 14-02-2011
Showing 1 blocks with 3 units
Total Carpet Area
12152.60 m²
130809.37 ft²
Total Units
38
1 different types
Blocks & Floors
1
3 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1024.14 m²
11023.74 ft²