ONGOINGActive

GURGAON GATE WAY

GURUGRAM, GURGAON
11-12-2020
Launch Date
ONGOING
Type
2020-06-30
Completion Date

Overview

Launch Date

11-12-2020

Completion Date

2020-06-30

RERA ID

RERA-GRG-730-2020

Basic Details

Project NameGURGAON GATE WAY
Project IDRERA-GRG-730-2020
Project TypeONGOING
Applicant TypeCompany
Submission Date11-12-2020 04:24:38 PM
Builder NameSECTOR 113 GATEVIDA DEVELOPERS PRIVATE LIMITED
CINU45202DL2011PTC277182
PANXXXX552R
Emailsatpalsingh@tatarealty.in
WebsiteNot specified
Phone (Mobile)7832901406
Phone (Landline)01244325304
Registered AddressFLAT NO. GF-3, NAURANG HOUSE, PLOT NO.5, BLOCK-134 21, KASTURBA GANDHI MARG, NEW DELHI CENTRAL DELHI 110001
Project AddressSECTOR 113 GATEVIDA DEVELOPERS PRIVATE LIMITED
DistrictGURUGRAM
TehsilGURGAON

Bank Details

Bank NameSTATE BANK OF INDIA, CAG BRANCH MUMBAI 3RD FLOOR, NEVILLE HOUSE, J.N HEREDIA MARG BALLARD ESTATE MUMBAI- 400001, MAHARASHTRA
Account Number36113733309
IFSC CodeSBIN0009995
MICR Code400002133
Branch Code9995

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.Yes
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Attached
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area4.038 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land8.875 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1109.086
CONSTRUCTION OF ROADS4196.40
PAVEMENTS865.80
PARKS AND PLAYGROUNDS7210.50
GREEN BELTS481.00
VEHICLE PARKINGS62.50
ELECTRICITY SUB-STATION68.00
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES1710.80
ANY OTHER637.538
Total16341.624

Cost Details

Land Cost3385.10 Lakhs
Other Cost690.78 Lakhs
Estimated Project Cost14339.52 Lakhs
Estimated Infrastructure Cost584.02 Lakhs
Estimated Apartment Construction Cost9679.62 Lakhs

Documents

PARKING DRG NO.MP 005

Uploaded on: 26-11-2020

DETAILS OF FAR ACHEIVED AND PERMISSIBLE - APPROVED SITE PLAN

Uploaded on: 26-11-2020

PARKING DRG NO.MP 004A

Uploaded on: 26-11-2020

PARKING DRG NO.MP 004

Uploaded on: 26-11-2020

ROAD AND FOOTPATH PLAN

Uploaded on: 26-11-2020

PARKING DRG NO.MP 005A

Uploaded on: 26-11-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 26-11-2020

STREET LIGHTING PLAN

Uploaded on: 26-11-2020

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 26-11-2020

DETAILS OF PERMISSIBLE FAR ZONING 21 ACRES

Uploaded on: 26-11-2020

PARKING DRG NO.MP 003

Uploaded on: 26-11-2020

DETAILS OF FAR ACHEIVED AND PERMISSIBLE - APPROVED SITE PLAN

Uploaded on: 26-11-2020

ZONING PLAN

Uploaded on: 23-08-2020

FOREST DEPARTMENT CLEARANCE

Uploaded on: 23-08-2020

DEMARCATION PLAN

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN-2

Uploaded on: 23-08-2020

BUILDING PLAN - BR III

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN-3

Uploaded on: 23-08-2020

LOWER BASEMENT PLAN

Uploaded on: 23-08-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN-4

Uploaded on: 23-08-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN-5

Uploaded on: 23-08-2020

DRAFT OF ALLOTMENT LETTER

Uploaded on: 04-09-2020

DD FOR THE PROJECT REGISTRATION FEE

Uploaded on: 23-08-2020

STORM WATER DRAINAGE

Uploaded on: 23-08-2020

AIRPORT AUTHORITY OF INDIA NOC DATED 13-12-2011

Uploaded on: 23-08-2020

AIRPORT AUTHORITY OF INDIA NOC DATED 27.06.2019

Uploaded on: 23-08-2020

FLOOR PLAN BUILDING A

Uploaded on: 23-08-2020

ENVIRONMENT CLEARANCE NOC

Uploaded on: 23-08-2020

NOC FROM FIRE DEPARTMENT

Uploaded on: 23-08-2020

ELECTRIFICATION PLAN APPROVAL

Uploaded on: 23-08-2020

SITE PLAN

Uploaded on: 23-08-2020

OCCUPANCY CERTIFICATE

Uploaded on: 23-08-2020

ELEVATION AND SECTION TOWER A

Uploaded on: 23-08-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 24-08-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 23-08-2020

FLOOR PLAN BUILDING A

Uploaded on: 23-08-2020

ELEVATION AND SECTION BUILDING F

Uploaded on: 23-08-2020

FLOOR PLAN BUILDING A

Uploaded on: 23-08-2020

TERRACE PLAN BUILDING A

Uploaded on: 23-08-2020

FLOOR PLAN BUILDING F

Uploaded on: 23-08-2020

FLOOR PLAN BUILDING F

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 23-08-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN-1

Uploaded on: 23-08-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 04-09-2020

DRAFT OF BUILDER BUYER AGREEMENT

Uploaded on: 04-09-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 04-09-2020

COLLOBORATION AGREEMENT ABAGH HI TECH

Uploaded on: 04-09-2020

COLLOBORATION AGREEMENT OMPRAKASH

Uploaded on: 04-09-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 04-09-2020

COLLORBORATION AGREEMENT AN BUILDWELL

Uploaded on: 04-09-2020

COLLOBORATION AGREEMENT NAVEEN GUPTA

Uploaded on: 04-09-2020

COLLOBORATION AGREEMENT BHAY RAM

Uploaded on: 04-09-2020

SERVICE ESTIMATES

Uploaded on: 11-05-2021

SERVICE APPROVAL LETTER

Uploaded on: 11-05-2021

SERVICE ESTIMATES

Uploaded on: 11-05-2021

FIRE APPROVAL

Uploaded on: 11-05-2021

NON-ENCUMBRANCE CERTIFICATE

Uploaded on: 11-05-2021

AUTHORISED SIGNATORY TO OPERATE THE BANK ACCOUNT

Uploaded on: 11-05-2021

Statutory Approvals

HEIGHT APPROVAL FROM AAIDate: 13-12-2011Status: ALREADY BEEN OBTAINED
HEIGHT APPROVAL FROM AAIDate: 27-06-2019Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVAL FROM DT & CP HARYANADate: 03-06-2016Status: ALREADY BEEN OBTAINED
FIRE NOC FROM HARYANA FIRE SERVICEDate: 12-04-2017Status: ALREADY BEEN OBTAINED
FOREST DEPARTMENT CLEARANCEDate: 08-05-2013Status: ALREADY BEEN OBTAINED
LOAD SANCTION APPROVALDate: 28-06-2017Status: ALREADY BEEN OBTAINED
OCCUPANCY CERTIFICATEDate: 15-02-2019Status: ALREADY BEEN OBTAINED
NOC FOR USE OF WATER FOR CONSTRUCTION FROM HUDADate: 21-03-2013Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: Yes
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: Yes
PARKING PLANApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTRESUBMITTED TO HUDA
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERSUBMITTED TO HUDA

NOC

ROADSProvider: NAApproval Status: Pending
WATER SUPPLYProvider: HUDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: HUDAApproval Status: Approved
STORM WATER DRAINAGEProvider: HUDAApproval Status: Approved

Project Team

Authorized Representative

SATPAL SINGH
Name
SATPAL SINGH
PAN
XXXX761D
Email
satpalsingh@tatarealty.in
Mobile
7832901406
Landline
01244325304
Address
H.No. 1823 Urban Estate Patiala-147002

Managing Director/CEO

COMPANY DOES NOT HAVE MD
Name
COMPANY DOES NOT HAVE MD
PAN
XXXX34NA
Email
NA@NOTAPPLICABLE.COM
Mobile
0000000000
Landline
N/A
Address
NA

Directors

SANJEEV SURI
Name
SANJEEV SURI
PAN
XXXX774F
Email
SanjeevSuri@tatahousing.com
Mobile
9910149911
Landline
01244325304
Address
A-104 Bestech Park ViewSPA NextBadshadpur Sector-67 Gurgaon -122 101 Haryana
SIDHARTH CHAUHAN
Name
SIDHARTH CHAUHAN
PAN
XXXX737G
Email
cmd@sidharthagroup.com
Mobile
8527899832
Landline
01244325304
Address
Pnd-081 Floor-08 The Pinnacle DLF City Phase-5 Gurgaon -122003 HR
DHARAMPAL DUDEJA
Name
DHARAMPAL DUDEJA
PAN
XXXX029F
Email
cmd@sidharthagroup.com
Mobile
9810256510
Landline
01244325304
Address
A-121 Sainik Colony Sector-49 Faridabad 122001 HR
VIVEK KUMAR GOEL
Name
VIVEK KUMAR GOEL
PAN
XXXX166M
Email
vivekgoyal@tatahousing.com
Mobile
9810305547
Landline
N/A
Address
H NO. J-1375 PALAM VIHAR BLOCK J GURGAON 122017
SUBRAMANYAM GANESH
Name
SUBRAMANYAM GANESH
PAN
XXXX197P
Email
ganesh323@gmail.com
Mobile
9820067557
Landline
N/A
Address
FLAT NO. 5 ANEESH APARTMENTS 1ST FLOOR AZAD STREET OFF S.V. ROAD ANDHERI W Mumbai 400058
MANOJ VIJAY SINHA
Name
MANOJ VIJAY SINHA
PAN
XXXX906M
Email
sinhacpl@gmail.com
Mobile
9920998893
Landline
N/A
Address
SWAMI VIVEKANAND GYMNASIUMPATELWADI BEHARUM BAUG JOGESHWARI WEST MUMBAI 400102

Contact Details

Project ContactEmail: satpalsingh@tatarealty.inMobile: 7832901406Landline: 01244325304
Project Contact PersonName: SATPAL SINGHEmail: satpalsingh@tatarealty.inMobile: 7832901406Landline: 01244325304

Land Details

Land Area4.038 (Acre)
Proposed FAR1.75
Permissible FAR1.75
Total Licensed Land8.875 (Acre)

Land Usage

Land Cost3385.10 Lakhs
Other Cost690.78 Lakhs
Estimated Project Cost14339.52 Lakhs
Estimated Infrastructure Cost584.02 Lakhs
Estimated Apartment Construction Cost9679.62 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2017 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-9.9814.148.15
Other-42.4912.94.39
Parks and Playgrounds-004.52
Roads & Pavements-33.8937.7421.97
Sewerage treatment & garbage disposal-10.68.048.25
Shopping area-000
Storm Water Drainage-18.6210.8110.81
Water Supply System-13.428.434.48
2018 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System3.033.7228.4111.07
Other18.856.4627.278.41
Parks and Playgrounds0000
Roads & Pavements6.4314.24.845.8
Sewerage treatment & garbage disposal12.213.1113.139.25
Shopping area0000
Storm Water Drainage3.6000
Water Supply System32.7519.997.27.2
2019 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0---
Electricity Supply System5.47---
Other3.6---
Parks and Playgrounds0---
Roads & Pavements0---
Sewerage treatment & garbage disposal5.65---
Shopping area0---
Storm Water Drainage0---
Water Supply System3.46---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE, LAMINATED WOOD, ENGINEERED WOOD, TILES
WALL FINISHING DETAILSPLASTICEMULSIONPAINT, CERAMIC TILE DADO IN TOILET
KITCHEN DETAILSVITRIFIED TILE FLOORING, 600MM HIGH TILE DADO ON WALLS, STAINLESS STEEL SINK, EXHAUST FAN
BATHROOM FITTINGSVITRIFIED TILE FLOORING, CERAMIC TILE DADO, CP FITTINGS AND CHINAWARE
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESEXTERNAL WINDOWS/DOORS –ALUMINIUM , INTERNAL DOORS WOODEN PAINTED/POLISHED DOOR FRAMES
GLASS WORKSS RAILING WITH GLASS
ELECTRIC FITTINGSMODULAR SWITCHES
CONDUCTING AND WIRING DETAILSCONCEALED CONDUITING AND WIRING
CUPBOARD DETAILSNA
WATER STORAGEUNDER GROUND AND OVER HEAD WATER TANKS
LIFT DETAILSBRANDED LIFTS
EXTERNAL GLAZINGSALUMINIUM WITH GLASS
WINDOWS/GLAZINGSALUMINIUM WITH GLASS
DOORSINTERNAL DOORS FLUSH DOORS WITH VENEER/LAMINATE
MAIN DOORSFLUSH DOOR WITH VENEER POLISHED
INTERNAL DOORSFLUSHDOOR WITH LAMINATE
AIR CONDITIONINGTOWER F-AIR-CONDITIONERFITTEDINALL ROOMS, TOWER A- AIRCONDITIONER FITTED IN LIVING AND DINING ONLY
ELECTRICAL FITTINGSMODULAR SWITCHES
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
EXTERNAL FINISHING/COLOUR SCHEMETEXTURE/WEATHER PROOF PAINT
INTERNAL FINISHINGPLASTICEMULSION/ OBD PAINT

Unit-wise Specifications

TOILET
FLOOR• VITRIFIED TILES
WALLS• CERAMICTILES
CEILINGFALSE CEILING WITH PAINT
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGS• CPANDSANITARYFITTINGS • MODULARSWITCHES
FIXTURES• EXHAUST FAN
KITCHEN
FLOOR• VITRIFIEDTILES
WALLS• PLASTICEMULSIONPAINT WITH 600MM CERAMIC TILE DADO ABOVE COUNTER
CEILING• OBD PAINT
COUNTERSNOT APPLICABLE
FIXTURES• MODULAR SWITCHES
KITCHEN APPLIANCES• GEYSER • EXHAUST FAN • STAINLESSSTEELSINK
SIT-OUTS
FLOORNOT APPLICABLE
WALLS & CEILINGNOT APPLICABLE
RAILINGSNOT APPLICABLE
FIXTURESNOT APPLICABLE
BED ROOMS
FLOOR• VITRIFIED TILE
WALLS• PLASTIC EMULSION PAINT
CEILINGFALSE CEILING WITH PAINT
WARDROBESNOT APPLICABLE
MASTER TOILET
FLOOR• VITRIFIED TILES
WALLS• DADO IN CERAMIC TILES
CEILINGFALSE CEILING WITH PAINT
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSCP AND SANITARY FITTINGS
FITTING/FIXTURES• EXHAUST FAN • GEYSER
MASTER BEDROOM/DRESSROOM
FLOORENGINEERED WOODEN FLOORING
WALLSPLASTICE EMULSIONPAINT, MODULAR SWITCHES
CEILINGFALSE CEILING WITH PAINT
MODULAR WARDROBES• NOT APPLICABLE
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORMARBLE FLOORING
WALLSPLASTICE EMULSION PAINT, MODULAR SWITCHES
CEILINGFALSE CEILING WITH PAINT
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOOR• ANTISKID CERAMIC TILES
WALLS & CEILINGNA
TOILET• VITRIFIED TILES
BALCONY• ANTISKID VITRIFIED TILES, ANODIZED ALUMINIUM SLIDING / SINGLE SHUTTER DOOR.

Fee Details

Payment 1
amount:1913000
cheque no:350713
draft date:20-07-2017
payable to:HRERA Gurugram
payee bank:HDFC BANK, HARSHA BHAWAN, DELHI