NewActive

GREENBERRY SIGNATURES

Lucknow, Uttar Pradesh
10-07-2019
RERA Received Date
New
Type
09-04-2024
Completion Date

Overview

RERA Received Date

10-07-2019

Completion Date

09-04-2024

RERA ID

UPRERAPRJ161330

Location

Latitude

264527.0

Longitude

805759.4

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)11528
Project NameGREENBERRY SIGNATURES
Registration Fee (in Rs.)63000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)57
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date10-07-2019
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)4500
Proposed Completion Date09-04-2024

Bank Details

Account no.5712735776
Name Of Account HolderTEJAS INFRAVENTURES LLP
Bank NameKOTAK MAHINDRA BANK
Branch AddressMUNSHIPULIYA LUCKNOW
Branch NameMUNSHIPULIYA LUCKNOW
IFSC CodeKKBK00005653

Development Works

Demarcation of Plots

NOT APPLICABLE

Boundary Wall

IN PROGRESS to be completed by december 2019.

Road Work

not applicable

Footpaths

not applicable

Water Supply Including Drinking Water Facilities

inetrnal water supply shall be developed by the developer and external connectionto be provided by U.p. Awas evam vikas Prishad

Sewer System

inetrnal sewer shall be developed by the developer and external connection to be provided by U.P. Awas evam Vikas parishad

Drain

has already built by U.P. Awas evam vikas parishad along the plot

Parks

to be completed as per landscape plan

Tree Planting

to be completed as per landscape plan

Design For Electric Supply Including Street Lighting

not applicable

Community Buildings

to be completed with A and B Block

Treatment and Disposal System of Sewage and Sullage water

S.T.P. plant has been built by U.P. Avas evam Vikas Parishad

Solid Waste Management And Disposal System

garbage bins and garbage collection facility has been shown in the plan

Water Conservation System

rainwater harvesting as per development plan shall be built

Energy Management System Including Use of Renewable Energy

solar power for common area lighting as shown in development plan

Fire Protection And Fire Safety System

all fire protection equipments shall be installed as per fire safety drawings as approved by C.F.O. Lucknow

Social Infrastructure And Other Public Amenities Including Public Health Services

to be developed as per sanction plan before completion of the project

Emergency Evacuation Services

fire escape staircases and exits as per Fire safety drawings approved by C.F.O.

Other Miscellaneous Work

all development work shall be done as per development plan before completion of the project

Documents

Registry Document

No: 1/17862/277TO312SRNO20143 | Date: 23-09-2014

Registry Document

No: 1 | Date: 12-10-2018

Registry Document

No: 2 | Date: 12-10-2018

Registry Document

No: 3 | Date: 12-10-2018

Registry Document

No: 4 | Date: 12-10-2018

Registry Document

No: 5 | Date: 12-10-2018

Registry Document

No: 6 | Date: 12-10-2018

Registry Document

No: 7 | Date: 12-10-2018

Registry Document

No: 8 | Date: 12-10-2018

Registry Document

No: Engineer certificate | Date: 12-10-2018

Details of Encumbrances

Uploaded: 16-08-2019

Commencement Certificate

Uploaded: 10-07-2019

Other Plan(If Any)

Uploaded: 26-07-2019

Proforma of Application Form

Uploaded: 26-07-2019

Proforma of Allotment Letter

Uploaded: 26-07-2019

Proforma of Conveyance Deed

Uploaded: 30-07-2019

Waste Disposal Plan

Uploaded: 10-07-2019

Water Supply Plan

Uploaded: 10-07-2019

Electricity Supply Plan

Uploaded: 26-07-2019

Development Work Plan

Uploaded: 10-07-2019

Affidavit

Uploaded: 10-07-2019

ARCHITECT CERTIFICATE

Uploaded: 10-07-2019

ENGINEERS CERTIFICATE

Uploaded: 10-07-2019

Permits

Orignal Permit No2656
Orignal Permit Date12-10-2018
Valid Upto11-10-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto10-10-2027
End Date10-10-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Tejas Infraventures LLP
Contractor Address12-Gh-7 Sector-12 Vrindavan Yojna Raibarilelly Road Lucknow
Architect NameRAKESH SHARMA
Architect AddressSULTANPURI, NEW DELHI
Architect Licence NumberCA/91-13596
Structural Engineer NameT.D ANEJA
Structural Engineer Address503/2 M G ROAD, GURGAON
Mobile number(Project Co-ordinator)8795817006

Land Details

AFS

Showing 4 blocks with 56 units

Property Summary

Total Carpet Area

22724.00

244598.86 ft²

Total Units

380

1 different types

Blocks & Floors

4

14 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:59.80
Balconies:112
Parking ratio:0.00 per unit

Block A

14 units

Block B

14 units

Block C

14 units

Block D

14 units

Khasra Details

Total Area

11528.00

124086.24 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-7
Area(In Sq. Mt.)11528

Other Details

Contractor Name (if any)Tejas Infraventures LLP
Contractor Address12-Gh-7 Sector-12 Vrindavan Yojna Raibarilelly Road Lucknow
Architect NameRAKESH SHARMA
Architect AddressSULTANPURI, NEW DELHI
Architect Licence NumberCA/91-13596
Structural Engineer NameT.D ANEJA
Structural Engineer Address503/2 M G ROAD, GURGAON
Mobile number(Project Co-ordinator)8795817006
GREENBERRY SIGNATURES by TEJAS INFRAVENTURES LLP | ReraTracker