Plot shall be demarcated by stone Signage giving the plots No / Block.
Gated Community with Brick Wall to be constructed as per the specification of the project.
Soil Filled and Compressed WBM Plus with RCC on it.
Brick paving and interlock tile footpath.
Water facilities with Over Head Tank and Municipal Water.
STP Provided.
Open Drain with brick and CC Work.
There are Seven Parks with Grass and plants in the Project.
Along the Roads and in the Park.
Provision of Street light and Transformer with No Power Backup.
The Community Building are not to be provided.
As per Specification provided in the Sanctioned Layout Plans.
AS per Specification provided in the Sanctioned Layout Plans.
Provision of Rain Water Harvesting System only.
No Provision has been made for any renewable Energy Equipment as the size of project
As per Specification provided in the Sanctioned Layout Plans.
No Provision.
it is plotted Development hence the Emergency Evacuation system is not to be provided.
No Provision.
No: Affidavit regarding Point No.-8 of Objection Letter dated - 09.09.2021 | Date: 18-09-2021
No: Partnership Deed Point No. 2 of Objection Letter dated 09.09.2021 | Date: 15-12-2011
No: Amended Partnership Deed Point No. 2 of Objection Letter dated 09.09.2021 | Date: 04-04-2018
No: Reply of Objection Letter dated 09.09.2021 | Date: 21-09-2021
No: Reply of Objection Letter dated 09.09.2021 with Annexure Part I | Date: 21-09-2021
No: Reply of Objection Letter dated 09.09.2021 with Annexure Part II | Date: 21-09-2021
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
33120.00 m²
356500.37 ft²