NEWActive

GREEN AVENUE

FARIDABAD, FARIDABAD
07-03-2020
RERA Received Date
NEW
Type
2025-10-25
Completion Date

Overview

RERA Received Date

07-03-2020

Completion Date

2025-10-25

RERA ID

RERA-PKL-814-2020

Basic Details

Project NameGREEN AVENUE
Project IDRERA-PKL-814-2020
Project TypeNEW
Applicant TypeFirm
Submission Date07-03-2020 06:10:22 PM
Builder NameS3 INFRABUILD LLP
CINNot specified
PANADIFS1290F
WebsiteNot specified
Phone (Mobile)9873656757
Phone (Landline)01292220365
Registered Address2F-1-3, OZONE CENTER SEC-12, FARIDABAD
Project AddressVILLAGE- KHERI KALAN, SECTOR-85, FARIDABAD, HARYANA
DistrictFARIDABAD
TehsilFARIDABAD

Bank Details

Bank NameNIT, FARIDABAD
Account Number10052839916
IFSC CodeFDFB0021313
MICR Code110751031
Branch Code21313

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)RAJEEV AGGARWAL & HARI KISHAN GARG
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)YES

Development Details

Land Area21524.183 (Sqr/mtrs)
Proposed FAR2.28
Permissible FAR2.25
Total Licensed Land21524.183 (Sqr/mtrs)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS5731.79
CONSTRUCTION OF ROADS4430.00
PAVEMENTS1050.00
PARKS AND PLAYGROUNDS4362.50
GREEN BELTS0
VEHICLE PARKINGS6486.27
ELECTRICITY SUB-STATION419.73
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY50.00
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES224.00
ANY OTHER1530.50
Total24284.79

Cost Details

Land Cost5600 Lakhs
Other Cost1200 Lakhs
Estimated Project Cost19000 Lakhs
Estimated Infrastructure Cost1600 Lakhs
Estimated Apartment Construction Cost10600 Lakhs

Documents

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 15-02-2020

ZONING PLAN

Uploaded on: 30-01-2020

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 30-01-2020

DEMARCATION PLAN

Uploaded on: 30-01-2020

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-01-2020

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-01-2020

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 30-01-2020

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 30-01-2020

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-01-2020

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 30-01-2020

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 30-01-2020

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-01-2020

Statutory Approvals

YET TO FILE FOR APPROVALDate: NAStatus: YET TO FILE FOR APPROVAL
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: No
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: No
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERYET TO BE PREPARED

NOC

ROADSProvider: HSVPApproval Status: Pending
WATER SUPPLYProvider: HSVPApproval Status: Pending
ELECTRICITYProvider: DHBVNApproval Status: Pending
SEWAGE DISPOSALProvider: HSVPApproval Status: Pending
STORM WATER DRAINAGEProvider: HSVPApproval Status: Pending

Project Team

Authorized Representative

ANKUR AGGARWAL
Name
ANKUR AGGARWAL
PAN
XXXX262B
Mobile
9873656757
Landline
01292220365
Address
H.NO. 2 MCF COLONY BALLABGARH FARIDABAD

Contact Details

Project ContactEmail: [email protected]Mobile: 9811247182Landline: N/A
Project Contact PersonName: GOVARDHAN LAL SHARMAEmail: [email protected]Mobile: 9811247182Landline: N/A

Land Details

Land Area21524.183 (Sqr/mtrs)
Proposed FAR2.28
Permissible FAR2.25
Total Licensed Land21524.183 (Sqr/mtrs)

Land Usage

Land Cost5600 Lakhs
Other Cost1200 Lakhs
Estimated Project Cost19000 Lakhs
Estimated Infrastructure Cost1600 Lakhs
Estimated Apartment Construction Cost10600 Lakhs

Total Infrastructure Expenditure

Infrastructure Total Expenditure

No total expenditure data is currently available for this project.

Quarterly Infrastructure Expenditure

2020 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0505050
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
2021 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0505050
Storm Water Drainage0000
Water Supply System0000
2022 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area505000
Storm Water Drainage0000
Water Supply System0000
2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres20000
Electricity Supply System75757575
Other1001010
Parks and Playgrounds1501515
Roads & Pavements50505050
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage12.512.512.512.5
Water Supply System25252525
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres15---
Electricity Supply System75---
Other5---
Parks and Playgrounds15---
Roads & Pavements50---
Sewerage treatment & garbage disposal50---
Shopping area0---
Storm Water Drainage12.5---
Water Supply System25---

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES
WALL FINISHING DETAILSWHITE WASH/ O.B.D PAINT
KITCHEN DETAILSCERAMIC TILES/ VITRIFIED TILES
BATHROOM FITTINGSC.P. FITTING
WOOD WORK ETCNA
DOORS AND WINDOS FRAMESPAINTED FLUSH DOOR WITH PRESS STEEL FRAMES
GLASS WORKWINDOWS
ELECTRIC FITTINGSISI MARKED SWITCHES
CONDUCTING AND WIRING DETAILSISI MARKED
CUPBOARD DETAILSNA
WATER STORAGEOVERHEAD TANK FOR EACH TOWER
LIFT DETAILSISI MARKED
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGS4 MM GLASS WITH M.S. FRAME SHUTTER
DOORSPAINTED FLUSH DOOR WITH PRESS STEEL FRAMES
MAIN DOORSPAINTED FLUSH DOOR WITH PRESS STEEL FRAMES
INTERNAL DOORSPAINTED FLUSH DOOR WITH PRESS STEEL FRAMES
AIR CONDITIONINGNA
ELECTRICAL FITTINGSISI MARKED
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMESUPER FINE TEXTURE PAINT OF PLEASING SHADES
INTERNAL FINISHINGWHITE WASH/ O.B.D PAINT

Unit-wise Specifications

TOILET
FLOORCERAMIC TILES 1X1
WALLSCERAMIC TILES UP TO 7"-0" HT
CEILINGWHITE WASH
COUNTERSNA
SANITARY WARE/CP FITTINGSEUROPEAN W.C. IN ALL TOILETS WITH WASH BASIN
FIXTURESC.P. FITTING
KITCHEN
FLOORVITRIFIED TILES
WALLSO.B.D. PAINT
CEILINGWHITE WASH
COUNTERSGRANITE
FIXTURESSINGLE BOWL STAINLESS STEEL
KITCHEN APPLIANCESNA
SIT-OUTS
FLOORVITRIFIED TILES
WALLS & CEILINGWHITE WASH
RAILINGSM.S. PAINTED PALING
FIXTURESNA
BED ROOMS
FLOORVITRIFIED TILES
WALLSWHITE WASH/ O.B.D. PAINT
CEILINGWHITE WASH
WARDROBESNA
MASTER TOILET
FLOORCERAMIC TILES 1X1
WALLSCERAMIC TILES UP TO 7"-0" HT
CEILINGWHITE WASH
COUNTERSNA
SANITARY WARE/CP FITTINGSEUROPEAN W.C. IN ALL TOILETS WITH WASH BASIN
FITTING/FIXTURESC.P. FITTING
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES
WALLSWHITE WASH/ O.B.D. PAINT
CEILINGWHITE WASH
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSWHITE WASH/ O.B.D. PAINT
CEILINGWHITE WASH
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILES
WALLS & CEILINGWHITE WASH
TOILETNA
BALCONYCERAMIC TILES/ M.S. PAINTED RAILING

Fee Details

Payment 1
amount:262600
cheque no:220059
draft date:07-03-2020
payable to:HRERA Panchkula
payee bank:IDFC FIRST BANK