NewActive

GOMTINAGAR LUCKNOW REDEVELOPMENT OF RAILWAY STATION

Lucknow, Uttar Pradesh
01-12-2018
Launch Date
New
Type
04-10-2023
Completion Date

Overview

Launch Date

01-12-2018

Completion Date

04-10-2023

RERA ID

UPRERAPRJ908603

Basic Details

Project TypeNew
Project CategoryCommercial
Total area in round figure (Sq.mt.)20234
Project NameGOMTINAGAR LUCKNOW REDEVELOPMENT OF RAILWAY STATION
Registration Fee (in Rs.)213000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date01-12-2018
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)16000
Proposed Completion Date04-10-2023

Location

Latitude

81012.82

Longitude

265138.52

Bank Details

Account Details
Name of the AccountRLDA Escrow Gomti Nagar
Account Number6711071801
Bank NameIndian Bank
Branch NameIndian Bank, New Delhi Main Branch
Branch AddressNew Delhi
IFSC CodeIDIB000N022
Branch DistrictLucknow
Transaction Account Details
Name of the AccountRLDA Escrow Gomti Nagar
Account Number6711071801
Bank NameIndian Bank
Branch NameIndian Bank, New Delhi Main Branch
Branch AddressNew Delhi
IFSC CodeIDIB000N022
Branch DistrictLucknow

Development Works

Demarcation of Plots

Gomtinagar Railway Station Vibhutikhand, Gomtinagar, Lucknow North side vibhutikhand ,south side Railway station East side Apna bazaar West side Railway plot

Boundary Wall

Front side in Vibhutikhand (North) and west side within Railway land

Road Work

As per the site layout development work plan

Footpaths

As per the site layout development work plan

Water Supply Including Drinking Water Facilities

Supply from Jalkal department and Railways own arrangement as per Project Scheme

Sewer System

Sewage Treatment Plant in the Campus as per the Project Scheme

Drain

As per Project Scheme

Parks

As per Project planning

Tree Planting

As per the Project Planning in 11700 sq.mtr for Green Area

Design For Electric Supply Including Street Lighting

HT Supply from 33 KV from Lucknow Electricity Supply Administration, 10 percent solar lighting

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Sewage treatment plant as per the Project Scheme

Solid Waste Management And Disposal System

One nos. compost plant of 1200 kg capacity as per NBC 2016 Part 9

Water Conservation System

Low flow sanitary fixtures, dual plumbing system, treated water use for horticulture

Energy Management System Including Use of Renewable Energy

• Lighting automation • Use of energy efficient devices • Use of capacitors at load centers to improve voltage and power factor • Variable Frequency Drives for hydro-pneumatic system for water supply and chilled water system. • Total 20% street light shall be solar lighting

Fire Protection And Fire Safety System

As per NBC 2016 – Fire Extinguishers, automatic sprinklers, water and smoke contains wet riser, fire hydrants

Social Infrastructure And Other Public Amenities Including Public Health Services

Public waiting area for convenient transport pick up and drop off Medical Room, Public toilets, Drivers Rest Room

Emergency Evacuation Services

Fire Staircases

Other Miscellaneous Work

NIL

Documents

Sale Deed

No: 14820 | Date: 27-09-2016

Details of Encumbrances

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 26-02-2019

Commencement Certificate

Uploaded: 19-01-2019

Other Plan(If Any)

Uploaded: 26-02-2019

Proforma of Application Form

Uploaded: 19-01-2019

Proforma of Allotment Letter

Uploaded: 19-01-2019

Proforma of Conveyance Deed

Uploaded: 19-01-2019

Waste Disposal Plan

Uploaded: 19-01-2019

Water Supply Plan

Uploaded: 19-01-2019

Electricity Supply Plan

Uploaded: 19-01-2019

Development Work Plan

Uploaded: 19-01-2019

Affidavit

Uploaded: 26-02-2019

CA CERTIFICATE

Uploaded: 26-02-2019

ARCHITECT CERTIFICATE

Uploaded: 28-01-2019

ENGINEERS CERTIFICATE

Uploaded: 26-02-2019

Permits

Orignal Permit NoLDA Letter no: NR-138/AA/MAP CELL DT 05.10.18
Orignal Permit Date05-10-2018
Valid Upto30-11-2021
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-11-2022
End Date30-11-2021
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)BL KASHYAP AND SONS LTD
Contractor Address409,4 th floor,DLF Tower A,Jasola,New Delhi-110025
Architect NameC P KUKREJA
Architect AddressD1,Green Park,New Delhi-110017
Architect Licence NumberCA/2000/25716
Structural Engineer NameHARIOM GERA OF CONSTRUCTURE DESIGN PVT LTD
Structural Engineer Address3RD FLOOR,ABHISHEK PLAZA,PART 1,POCKET B,MAYUR VIHAR,,PHASE 2,NEW DELHI 110091
Mobile number(Project Co-ordinator)8527798996

Land Details

AFS

Showing 1 blocks with 7 units

Property Summary

Total Carpet Area

620840.52

6682665.27 ft²

Total Units

179

2 different types

Blocks & Floors

1

7 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:3468.38
Balconies:0
Parking ratio:0.00 per unit

Block RETAIL BLOCK /R1,R2/01

7 units

Khasra Details

Total Area

154581.95

1663904.65 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoNIL
Area(In Sq. Mt.)154581.95

Other Details

Contractor Name (if any)BL KASHYAP AND SONS LTD
Contractor Address409,4 th floor,DLF Tower A,Jasola,New Delhi-110025
Architect NameC P KUKREJA
Architect AddressD1,Green Park,New Delhi-110017
Architect Licence NumberCA/2000/25716
Structural Engineer NameHARIOM GERA OF CONSTRUCTURE DESIGN PVT LTD
Structural Engineer Address3RD FLOOR,ABHISHEK PLAZA,PART 1,POCKET B,MAYUR VIHAR,,PHASE 2,NEW DELHI 110091
Mobile number(Project Co-ordinator)8527798996