The property is clearly demarcated on all sides.
The property has brick wall and GI Sheet properly done for boundary wall.
The abutting road to the property are Government Roads and there is no separate road inside the property.
The driveway for fire tender and vehicular movement along with footpath shall be provided in site development.
A deep borewell along with filtration plant is in proposal.
STP along with waste water recycling for landscaping has been planned for the project.
Surface runoff drain and percolation chamber have been planned for the project.
This is a standalone commercial building so there is no park.
Appropriate landscape design with trees and planters shall be done.
Solar panel for street lighting and common lighting along with transformer and DG Set backup shall be provided.
The building is commercial so any separate community building shall not be provided.
The STP shall be installed and any extra overflow shall be connected into municipal sewer line.
Provision of bio degradable and recycling shall be primary objective in solid waste management.
Rain water harvesting shall be provided and water from STP shall be reused in landscaping, cleaning etc.
For energy conservation special glass panel shall be used in the building and solar panel on the terrace for lighting of common areas.
All the provision of NBC shall be strictly followed with Sprinklers and Fire Hose Cabinate at appropriate places.
Provision for physically handicapped people like Ramp, Toilets, Wheelchairs shall be provided apart from drinking water and toilets.
Fire Staircase along with fire check doors for evacuation on the building as per the NBC have been provided.
Proper signages, security, CCTV public announcement are also to be provided in the building.
Showing 1 blocks with 211 units
Total Carpet Area
8994.99 m²
96821.17 ft²
Total Units
221
2 different types
Blocks & Floors
1
10 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8094.05 m²
87123.54 ft²