Launch Date
Completion Date
RERA ID
28.420189
77.493981
As per Approved Building Plan
As per Approved Building Plan
As per Approved Building Plan
As per Approved Building Plan
Noida Authority shall provide water supply to the entire society further water will be treated and supplied at customer premise through piping and pumping and gravity system
Centralised STP to treat the sewerage and every tower has its own down comers connected to main sewerage line
Common drainage system designed for complete project rain water is connected to recharge pits and finally it’s overflow to govt drain line
as per approved building plan
as per approved Building PLan
Single feeder shall be taken from Noida Electricity board and connected to central substation and entire project shall have street lighting with timer control
Club complete with recreational water feature
Central STP for entire project and all towers shall be connected to STP
Project shall have waste segregation area and OWC for treatment of organic waste
Adequate no of Recharge pits made
LED lights and timer control panels shall be used for efficient energy management
Fire alarm system provided
As per approved building plan
As per approved building plan
as per approved building plan
Showing 6 blocks with 237 units
Total Carpet Area
42551.72 m²
458022.46 ft²
Total Units
399
6 different types
Blocks & Floors
6
33 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
72000.00 m²
775000.80 ft²