ONGOINGActive

GODREJ ICON TOWER 4/E AND TOWER 5/F

GURUGRAM, HARSARU ST
05-12-2022
Launch Date
ONGOING
Type
2029-12-31
Completion Date

Overview

Launch Date

05-12-2022

Completion Date

2029-12-31

RERA ID

RERA-GRG-1224-2022

Basic Details

Project NameGODREJ ICON TOWER 4/E AND TOWER 5/F
Project IDRERA-GRG-1224-2022
Project TypeONGOING
Applicant TypeFirm
Submission Date05-12-2022 12:01:36 PM
Builder NameOASIS LANDMARKS LLP
CINNot specified
PANAADFO9657Q
Emailiconcrm@godrejproperties.com
WebsiteNot specified
Phone (Mobile)9871202007
Phone (Landline)01244956150
Registered AddressUM HOUSE PLTO NO.35P SECTOR-44, GURUGRAM HARYANA,122002
Project AddressSECTOR 88A & 89A
DistrictGURUGRAM
TehsilHARSARU ST

Bank Details

Bank NameICICI BANK LTD, DLF QUTUB PLAZA, DLF PHASE 1, GURGAON , 122002
Account Number017705012503
IFSC CodeICIC0000177
MICR Code110229030
Branch Code000177

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Sushil Sharma
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area1.424625 (Acre)
Proposed FAR0.245
Permissible FAR1.75
Total Licensed Land14.684 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1026.39
CONSTRUCTION OF ROADS1409.09
PAVEMENTS0
PARKS AND PLAYGROUNDS600.0
GREEN BELTS0
VEHICLE PARKINGS1249.68
ELECTRICITY SUB-STATION0
CLUB HOUSE512.92
SEWAGE AND SOLID WASTE TREATMENT FACILITY159.0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER808.07
Total5765.15

Cost Details

Land Cost1067.87 Lakhs
Other Cost5702.19 Lakhs
Estimated Project Cost12660.46 Lakhs
Estimated Infrastructure Cost1296.86 Lakhs
Estimated Apartment Construction Cost4593.53 Lakhs

Documents

ZONING PLAN APPROVAL

Uploaded on: 30-11-2022

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 30-11-2022

LOI (13.759 ACS)

Uploaded on: 30-11-2022

FIRE NOC II

Uploaded on: 30-11-2022

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 30-11-2022

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 30-11-2022

LICENCE NO. 151 OF 2014

Uploaded on: 30-11-2022

ARAVALI NOC

Uploaded on: 30-11-2022

FOREST NOC

Uploaded on: 30-11-2022

FOREST NOC

Uploaded on: 30-11-2022

FIRE NOC III

Uploaded on: 30-11-2022

LICENCE NO. 85 OF 2013

Uploaded on: 30-11-2022

SERVICE PLAN ESTIMATE

Uploaded on: 30-11-2022

CONSENT TO ESTABLISH

Uploaded on: 30-11-2022

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 30-11-2022

CHANGE OF DEVELOPER

Uploaded on: 30-11-2022

FOLDER D - BS 19-20

Uploaded on: 30-11-2022

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 01-12-2022

NOC FOR HEIGHT CLEARANCE (0.925 ACRES)

Uploaded on: 30-11-2022

CONSENT TO ESTABLISH

Uploaded on: 30-11-2022

LOI (0.925 ACS)

Uploaded on: 30-11-2022

NOC FOR HEIGHT CLEARANCE (13.759 ACS ACRES)

Uploaded on: 30-11-2022

SEWERAGE ASSURANCE

Uploaded on: 30-11-2022

ZONING PLAN

Uploaded on: 30-11-2022

OCCUPATION CERTIFICATE PHASE I

Uploaded on: 30-11-2022

FOLDER D - BS 20-21

Uploaded on: 30-11-2022

FOLDER D - BS 21-22

Uploaded on: 30-11-2022

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 30-11-2022

DEMARCATION PLAN

Uploaded on: 30-11-2022

REVALIDATION OF NOC FOR HEIGHT CLEARANCE

Uploaded on: 30-11-2022

APPROVAL OF REVISED BUILDING PLAN

Uploaded on: 30-11-2022

ARAVALI NOC

Uploaded on: 30-11-2022

WATER ASSURNACE

Uploaded on: 30-11-2022

OCCUPATION CERTIFICATE PHASE II

Uploaded on: 30-11-2022

FIRE SCHEME

Uploaded on: 30-11-2022

FIRE NOC I

Uploaded on: 30-11-2022

OCCUPATION CERTIFICATE PHASE III

Uploaded on: 30-11-2022

REVISED ELECTRICAL LOAD OF 4618 KW (26.10.17)

Uploaded on: 11-07-2023

TOWER-5 ELEVATION

Uploaded on: 11-07-2023

BASEMENT PLAN (SECOND LEVEL) PARCEL-A & B (1)

Uploaded on: 11-07-2023

TOWER-5 SECTION

Uploaded on: 11-07-2023

TOWER-5 TYPICAL_AS BUILT

Uploaded on: 11-07-2023

APPROVAL OF BUILDING PLAN

Uploaded on: 11-07-2023

ENVIRONMENT CLEARANCE-2014

Uploaded on: 11-07-2023

ENVIRONMENT CLEARANCE-2017

Uploaded on: 11-07-2023

ENVIRONMENT CLEARANCE-2021

Uploaded on: 11-07-2023

WATER PERMISSION

Uploaded on: 11-07-2023

SEWERAGE PERMISSION

Uploaded on: 11-07-2023

DEMARCATION PLAN OF GH-13.759 ACRES

Uploaded on: 11-07-2023

RENEWAL OF LICENCE-85 OF 2013

Uploaded on: 11-07-2023

RENEWAL OF LICENCE-151 OF 2014

Uploaded on: 11-07-2023

IRRIGATION DRAWING

Uploaded on: 11-07-2023

ROAD LAYOUT

Uploaded on: 11-07-2023

SEWERAGE LAYOUT

Uploaded on: 11-07-2023

STROM DRAINAGE LAYOUT

Uploaded on: 11-07-2023

WATER SUPPLY LAYOUT

Uploaded on: 11-07-2023

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 11-07-2023

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 11-07-2023

BASEMENT PARCEL D

Uploaded on: 11-07-2023

BASEMENT PLAN (FIRST LEVEL) PARCEL-A & B (1)

Uploaded on: 11-07-2023

TOWER-4 ( 2 TO 5)

Uploaded on: 11-07-2023

TOWER-4 (1ST FLOOR COMM. BUILDING-3)

Uploaded on: 11-07-2023

TOWER-4 (6-19) (21-25)

Uploaded on: 11-07-2023

TOWER-4 (20TH FLOOR)

Uploaded on: 11-07-2023

TOWER-4 (GROUND FLOOR COMM BUILDING-3)

Uploaded on: 11-07-2023

TOWER-4 ELEVATION (2)

Uploaded on: 11-07-2023

TOWER-4 ELEVATION

Uploaded on: 11-07-2023

TOWER-4 SECTION

Uploaded on: 11-07-2023

TOWER-4 TERRACE PLAN

Uploaded on: 11-07-2023

TOWER-5 ( 1ST TO 7TH )

Uploaded on: 11-07-2023

TOWER-5 ELEVATION (2)

Uploaded on: 11-07-2023

TOWER-5 GROUND FLOOR_AS BUILT

Uploaded on: 11-07-2023

TOWER-5 TERRACE_AS BUILT

Uploaded on: 11-07-2023

Statutory Approvals

LOI (13.759 ACS)Date: 26-03-2013Status: ALREADY BEEN OBTAINED
LICENCE NO. 85 OF 2013Date: 10-10-2013Status: ALREADY BEEN OBTAINED
RENEWAL OF LICENCEDate: 09-12-2019Status: ALREADY BEEN OBTAINED
LOI (0.925 ACS)Date: 28-08-2014Status: ALREADY BEEN OBTAINED
LICENCE NO. 151 OF 2014Date: 05-09-2014Status: ALREADY BEEN OBTAINED
RENEWAL OF LICENCEDate: 25-10-2019Status: ALREADY BEEN OBTAINED
CHANGE OF DEVELOPERDate: 03-10-2018Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 04-09-2015Status: ALREADY BEEN OBTAINED
NOC FOR HEIGHT CLEARANCE (13.759 ACS)Date: 17-02-2014Status: ALREADY BEEN OBTAINED
REVALIDATION OF NOC FOR HEIGHT CLEARANCEDate: 23-05-2019Status: ALREADY BEEN OBTAINED
NOC FOR HEIGHT CLEARANCE (0.925 ACS)Date: 12-02-2016Status: ALREADY BEEN OBTAINED
BUILDING PLAN APPROVALDate: 09-04-2014Status: ALREADY BEEN OBTAINED
REVISED BUILDING PLAN APPROVALDate: 03-10-2018Status: ALREADY BEEN OBTAINED
MINING PERMISSIONDate: 01-10-2014Status: ALREADY BEEN OBTAINED
ARAVALI NOC (13.759 ACS)Date: 22-09-2016Status: ALREADY BEEN OBTAINED
ARAVALI NOC (0.925 ACRES)Date: 22-12-2015Status: ALREADY BEEN OBTAINED
FOREST NOC (13.759 ACS)Date: 24-03-2014Status: ALREADY BEEN OBTAINED
FOREST NOC (0.925 ACS)Date: 09-12-2015Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 03-09-2014Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 14-09-2017Status: ALREADY BEEN OBTAINED
ENVIRONMENT CLEARANCEDate: 30-04-2021Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 06-10-2014Status: ALREADY BEEN OBTAINED
CONSENT TO ESTABLISHDate: 27-11-2017Status: ALREADY BEEN OBTAINED
WATER ASSURNACEDate: 20-02-2017Status: ALREADY BEEN OBTAINED
SEWERAGE ASSURANCEDate: 29-08-2016Status: ALREADY BEEN OBTAINED
ELECTRICITY LOAD ASSURANCEDate: 27-11-2015Status: ALREADY BEEN OBTAINED
REVISED FIRE SCHEMEDate: 24-04-2019Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTIMATEDate: 05-02-2019Status: ALREADY BEEN OBTAINED
FIRE NOC IDate: 19-12-2018Status: ALREADY BEEN OBTAINED
FIRE NOC IIDate: 20-08-2020Status: ALREADY BEEN OBTAINED
FIRE NOC IIIDate: 23-10-2021Status: ALREADY BEEN OBTAINED
WATER CONNECTION APPROVALDate: 22-05-2019Status: ALREADY BEEN OBTAINED
SEWERAGE & SEWER WATER APPROVALDate: 09-05-2019Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATEDate: 29-03-2019Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATEDate: 18-09-2020Status: ALREADY BEEN OBTAINED
OCCUPATION CERTIFICATEDate: 25-01-2022Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: No
Demarcation PlanApproved: Yes
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: No
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes
ROADS AND PAVEMENT PLANApproved: Yes
ELECTRICITY SUPPLY PLANApproved: No
WATER SUPPLY PLANApproved: Yes
SEWERAGE AND GARBAGE DISPOSAL PLANApproved: Yes
STROM WATER DRAINAGEApproved: Yes
10% LAND TO BE TRANSFERRED TO THE GOVT. FOR COMMUNITY FACILITYApproved: No
STREET LIGHTING PLANApproved: No
PARKING PLANApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSAS PER PROJECT REPORT
WATER SUPPLY SYSTEMAS PER PROJECT REPORT
STORM WATER DRAINAGEAS PER PROJECT REPORT
ELECTRICITY SUPPLY SYSTEMAS PER PROJECT REPORT
SEWAGE TREATMENT & GARBAGE DISPOSALAS PER PROJECT REPORT
STREET LIGHTINGAS PER PROJECT REPORT
SECURITY AND FIRE FIGHTINGAS PER PROJECT REPORT
PLAYGROUNDS AND PARKSAS PER PROJECT REPORT
CLUB HOUSE/COMMUNITY CENTREAS PER PROJECT REPORT
SHOPPING AREAAS PER PROJECT REPORT
RENEWABLE ENERGY SYSTEMAS PER PROJECT REPORT
SCHOOLAS PER PROJECT REPORT
HOSPITAL/DISPENSARYAS PER PROJECT REPORT
ANY OTHERAS PER PROJECT REPORT
HORTICULTUREAS PER PROJECT REPORT
CONSTRUCTION OF CIRCULAR ROADAS PER PROJECT REPORT
PARKINGAS PER PROJECT REPORT
STPAS PER PROJECT REPORT
UNDERGROUND TANKAS PER PROJECT REPORT
RAIN WATER HARVESTINGAS PER PROJECT REPORT
ELECTRICAL SUB STATIONAS PER PROJECT REPORT

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

TARUN CHADHA
Name
TARUN CHADHA
PAN
XXXX381P
Email
iconcrm@godrejproperties.com
Mobile
9871202007
Landline
01244956150
Address
UM House 3rd Floor Plot 35 Sector 44 Gurgaon

Contact Details

Project ContactEmail: iconcrm@godrejproperties.comMobile: 8377046731Landline: 01244956150
Project Contact PersonName: TARUN CHADHAEmail: tarun.chadha@godrejproperties.comMobile: 9871202007Landline: N/A

Land Details

Land Area1.424625 (Acre)
Proposed FAR0.245
Permissible FAR1.75
Total Licensed Land14.684 (Acre)

Land Usage

Land Cost1067.87 Lakhs
Other Cost5702.19 Lakhs
Estimated Project Cost12660.46 Lakhs
Estimated Infrastructure Cost1296.86 Lakhs
Estimated Apartment Construction Cost4593.53 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
STP4.99
Other0
Parking236
Horticulture6.35
Street Light3.32
Shopping area0
Renewable Energy1.93
Roads & Pavements20.09
Water Supply System14.38
Construction of Road9.63
Storm Water Drainage10.49
Parks and Playgrounds3.19
Rain Water Harvesting2.16
Electrical Sub Station10.85
Underground Water Tank2.89
Electricity Supply System0
Security and Firefighting8.87
Clubhouse/community centres0
Sewerage treatment & garbage disposal5.55

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Construction of Circulation Road----
Electrical Sub Station-4.364.366.7
Electricity Supply System-000
Horticulture----
Other-000
Parking-8.651.5738.97
Parks and Playgrounds-000
Rain Water Harvesting-03.992.06
Renewable Energy----
Roads & Pavements-1.961.961.7
STP-5.835.832.35
Security and Firefighting-0.550.554.48
Sewerage treatment & garbage disposal-0.310.621.09
Shopping area-000
Storm Water Drainage-0.591.182.06
Street Light-0.461.122.7
Underground Water Tank-3.172.932
Water Supply System-0.523.142.37
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of Circulation Road----
Electrical Sub Station8.826.18--
Electricity Supply System0000
Horticulture----
Other0000
Parking49.2838.3972.8751
Parks and Playgrounds0000
Rain Water Harvesting----
Renewable Energy3.61.8--
Roads & Pavements1.981.036.25.64
STP----
Security and Firefighting2.991.245.724.95
Sewerage treatment & garbage disposal0.930.781.561.71
Shopping area0000
Storm Water Drainage1.771.472.942.65
Street Light1.31.122.61-
Underground Water Tank----
Water Supply System32.344.443.11
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Construction of Circulation Road--13.5113.51
Electrical Sub Station----
Electricity Supply System0000
Horticulture----
Other0000
Parking49.2886.1279.4964
Parks and Playgrounds0.781.181.391.16
Rain Water Harvesting----
Renewable Energy----
Roads & Pavements6.776.049.5910.72
STP----
Security and Firefighting2.911.49--
Sewerage treatment & garbage disposal2.181.712.181.4
Shopping area0000
Storm Water Drainage4.123.244.121.18
Street Light----
Underground Water Tank----
Water Supply System35.254.843.9
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres000-
Construction of Circulation Road----
Electrical Sub Station----
Electricity Supply System000-
Horticulture4.468.924.46-
Other000-
Parking72.87---
Parks and Playgrounds2.051.221.17-
Rain Water Harvesting----
Renewable Energy----
Roads & Pavements2.8200-
STP----
Security and Firefighting----
Sewerage treatment & garbage disposal1.0900-
Shopping area000-
Storm Water Drainage1.471.181.47-
Street Light----
Underground Water Tank----
Water Supply System4.4400-

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE OR EQV. IN LIVING/DINING, WOODEN FLOORING OR EQV. IN BEDROOMS, ANTI-SKID TILES OR EQV. IN TOILETS, KITCHEN, BALCONY & UTILITY
WALL FINISHING DETAILSACRYLIC EMULSION OR EQV. IN INTENAL WALLS, OIL BOUND DISTEMPER OR EQV. IN CEILING, WEATHER PROOF OR EQV. IN EXTERNAL
KITCHEN DETAILSGRANITE COUNTER WITH SINK AND CP FITTINGS
BATHROOM FITTINGSROCCA/PARRYWARE OR EQUIVALENT
WOOD WORK ETC-
DOORS AND WINDOS FRAMESTEAK FRAME IN MAIN DOOR, RED MERANDI/ FLUSH DOOR IN INTERNAL DOORS, ALUMINIUM OR EQ. FRAME WITH GLASS FOR WINDOWS & SLIDING DOOR WINDOWS
GLASS WORKYES, WINDOWS
ELECTRIC FITTINGSPHILLIPS OR EQUIVALENT LED LIGHTS IN COMMON AREA
CONDUCTING AND WIRING DETAILSHIGH QUALITY FIRE RESISTANT LOW SMOKE COPPER WIRING
CUPBOARD DETAILSNO WARDROBE
WATER STORAGEUNDER GROUND AND OVERHEAD TANKS
LIFT DETAILSSTONE ARCHITRAVE AND ITALIAN MARBLE/STONE FLOORING IN CAR BODY AND GRANITE CLADDING
EXTERNAL GLAZINGSAS MENTIONED BELOW
WINDOWS/GLAZINGSANODISED ALUMINIUM/EQ. FRAME WITH ANNEALED GLASS
DOORSAS MENTIONED BELOW
MAIN DOORSMAIN DOOR :- TEAK WOOD/EQ. WITH VENEER/EQ. FINISH
INTERNAL DOORSFLUSH DOOR :- WOODEN DOOR WITH LAMINATES
AIR CONDITIONINGN/A
ELECTRICAL FITTINGSLED LIGHTS IN COMMON AREA
CNG PIPE LINEN/A
PROVISION OF WIFI AND BROADBAND FACILITYN/A
EXTERNAL FINISHING/COLOUR SCHEMEACRYLIC APEX PAINT/EQ.
INTERNAL FINISHINGAS MENTIONED BELOW

Unit-wise Specifications

TOILET
FLOORANTI SKID CERAMIC TILES/EQ.
WALLSCERAMIC TILES TILL 7'-0" ON ALL SIDES & OIL BOUND DISTEMPER/EQ.
CEILINGGRID CEILING/EQ.
COUNTERSGRANITE/EQ.
SANITARY WARE/CP FITTINGSROCCA/PARRYWARE OR EQUIVALENT
FIXTURESROCCA/PARRYWARE OR EQUIVALENT
KITCHEN
FLOORCERAMIC TILES/EQ.
WALLSCERAMIC TILES/EQ. UP TO 2 FEETS ABOVE THE KITCHEN COUNTER
CEILINGOIL BOUND DISTEMPER/EQ.
COUNTERSGRANITE/EQ.
FIXTURESROCCA/PARRYWARE OR EQUIVALENT
KITCHEN APPLIANCESN/A
SIT-OUTS
FLOORVITRIFIED TILE OR EQV.
WALLS & CEILINGACRYLIC EMULSION OR EQV. IN INTERNAL WALLS AND OIL BOUND DISTEMPER OR EQV. IN CEILING
RAILINGSENAMEL PAINT
FIXTURESNONE
BED ROOMS
FLOORLAMINATED WOODEN FLOOR/EQ.
WALLSACRYLIC EMULSION/OIL BOUND DISTEMPER/EQ.
CEILINGOIL BOUND DISTEMPER/EQ.
WARDROBESN/A
MASTER TOILET
FLOORANTI SKID CERAMIC TILES/EQ.
WALLSCERAMIC TILES UPTO 7 FEETS FROM FFL/EQ.
CEILINGGRID FALSE CEILING/EQ.
COUNTERSGRANITE STONE/EQ.
SANITARY WARE/CP FITTINGSROCCA/PARRYWARE OR EQUIVALENT
FITTING/FIXTURESROCCA/PARRYWARE OR EQUIVALENT
MASTER BEDROOM/DRESSROOM
FLOORLAMINATED WOODEN FLOORING/EQ.
WALLSACRYLIC EMULSION PAINT/EQ.
CEILINGOIL BOUND DISTEMPER/EQ.
MODULAR WARDROBESN/A
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES/EQ.
WALLSACRYLIC EMULSION PAINT/EQ.
CEILINGOIL BOUND DISTEMPER/EQ.
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORVITRIFIED TILES/EQ. IN LIVING DINING
WALLS & CEILINGACRYLIC EMULSION/EQ. PAINT AND CEILING IN OIL BOUND DISTEMPER/EQ.
TOILETANTI SKID CERAMIC TILES/EQ.
BALCONYANTI SKID CERAMIC TILES/EQ.

Fee Details

Payment 1
amount:1100000
cheque no:504367
draft date:01-12-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:367000
cheque no:504396
draft date:23-12-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:1500
cheque no:301047856039
draft date:09-01-2023
payable to:HRERA Gurugram
payee bank:ICICI BANK (ONLINE-301047856039)