NEWActive

GODREJ ALIRA

GURUGRAM, WAZIRABAD ST
image
image
image
image
image
image
image
image
20-05-2025
Launch Date
NEW
Type
2032-04-30
Completion Date

Overview

Launch Date

20-05-2025

Completion Date

2032-04-30

Configurations

3 BHK, 4 BHK

Sizes

0 - 0 sq.ft.

Project Size

1 Buildings - 132 units

Launch Price

23000 /sq.ft

RERA ID

RERA-GRG-1943-2025

Basic Details

Project NameGODREJ ALIRA
Project IDRERA-GRG-1943-2025
Project TypeNEW
Applicant TypeCompany
Submission Date20-05-2025 02:53:32 PM
Builder NameGODREJ PROPERTIES LIMITED
CINL74120MH1985PLC035308
PANXXXX995M
Emailgodrejalira.rera@godrejproperties.com
Websitehttps://www.godrejproperties.com
Phone (Mobile)9920805350
Phone (Landline)01244956150
Registered Address3RD FLOOR, UM HOUSE, PLOT NO. 35-P, SECTOR 44, GURUGRAM-122002
Project AddressGH-01, URBAN ESTATE II, SECTOR 39, GURUGRAM
DistrictGURUGRAM
TehsilWAZIRABAD ST

Location

Godrej Alira Location
Godrej Alira Location

Layout

Loading
Godrej Alira Master Layout
Godrej Alira Master Layout

Payment Plans

Loading
Godrej Alira Payment Plan
Godrej Alira Payment Plan

Floor Plan

Loading
Configuration
Super Area
Unit Details
Carpet Area
1313 sq.ft
Built Up Area
N/A
Carpet Efficiency
N/A
Built Up Efficiency
N/A
Parkings
N/A

Brochures

Loading

Walkthrough

Loading

Bank Details

Bank NameAXIS BANK LTD,GROUND FLOOR, STS 25 45,DLF STAR TOWER,SECTOR-30,GURGAON-122001
Account Number924020037379415
IFSC CodeUTIB0003622
MICR Code110211230
Branch CodeAXISINBB056

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Anuj Agarwal and Sushil Kumar
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Uploaded

Development Details

Land Area1.9745 (Acre)
Proposed FAR311
Permissible FAR312
Total Licensed Land1.9745 (Acre)

Land Usage

PLOTS TO BE SOLD0
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1098.32
CONSTRUCTION OF ROADS2025.86
PAVEMENTS0
PARKS AND PLAYGROUNDS632.12
GREEN BELTS1838.89
VEHICLE PARKINGS21.45
ELECTRICITY SUB-STATION0
CLUB HOUSE342.73
SEWAGE AND SOLID WASTE TREATMENT FACILITY207.2
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
WATER SUPPLY SYSTEM74.87
STORM WATER DRAINAGE210.03
STREET LIGHTING50.18
ELECTRICITY SUPPLY SYSTEM74.87
SECURITY AND FIRE FIGHTING150.95
RENEWABLE ENERGY SYSTEM199.91
RAIN WATER HARVESTING80.94
HARDSCAPE982.2
Total7990.52

Cost Details

Land Cost16048 Lakhs
Other Cost10366 Lakhs
Estimated Project Cost58682 Lakhs
Estimated Infrastructure Cost3185 Lakhs
Estimated Apartment Construction Cost29083 Lakhs

Documents

BASEMENT 03 AREA DIAGRAM

Uploaded on: 24-06-2025

SECTION B

Uploaded on: 24-06-2025

SEWERAGE ASSURANCE

Uploaded on: 05-05-2025

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 04-05-2025

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 07-05-2025

BASEMENT 01 AREA DIAGRAM

Uploaded on: 24-06-2025

ELECTRICITY LOAD SEC 39

Uploaded on: 24-06-2025

FLOOR PLAN 1 TO 16 AND 18 AREA DIAGRAM

Uploaded on: 24-06-2025

SECTION A

Uploaded on: 24-06-2025

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 05-05-2025

AAI- HEIGHT CLEARANCE NOC

Uploaded on: 24-06-2025

FLOOR PLAN 19 TO 27 AND 28 TO 33 AREA DIAGRAM

Uploaded on: 24-06-2025

ELEVATION B

Uploaded on: 24-06-2025

AFFIDAVIT 42LD

Uploaded on: 24-06-2025

ZONING PLAN

Uploaded on: 05-05-2025

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 05-05-2025

POSSESSION CERTIFICATE

Uploaded on: 05-05-2025

DRINKING WATER ASSURANCE

Uploaded on: 05-05-2025

STROM WATER DRAINAGE

Uploaded on: 05-05-2025

GREEN AREA PLAN

Uploaded on: 05-05-2025

FOREST AND OTHER NOCS

Uploaded on: 24-06-2025

BASEMENT 03 PLAN

Uploaded on: 24-06-2025

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 07-05-2025

BASEMENT 01 PLAN

Uploaded on: 24-06-2025

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 07-05-2025

BANK UNDERTAKING

Uploaded on: 24-06-2025

SITE PLAN MEP

Uploaded on: 24-06-2025

MULTI PURPOSE HALL FLOOR PLAN ELEVATION SECTION AND AREA

Uploaded on: 24-06-2025

DRAFT CONVYENACE DEED

Uploaded on: 24-06-2025

CONEVYANCE DEED

Uploaded on: 24-06-2025

FLOOR PLAN REFUGEE 17 AND 26 AREA DIAGRAM

Uploaded on: 24-06-2025

SITE PLAN WITH AREA DIAGRAM

Uploaded on: 24-06-2025

SITE PLAN OVERLAP GREEN AREA

Uploaded on: 24-06-2025

ELEVATION C

Uploaded on: 24-06-2025

ELEVATION A

Uploaded on: 24-06-2025

MACHINE ROOM AND OHIT PLAN AND AREA DIAGRAM

Uploaded on: 24-06-2025

ZONING PLAN LETTER

Uploaded on: 24-06-2025

DRAFT BBA

Uploaded on: 24-06-2025

BASEMENT 04 PLAN

Uploaded on: 24-06-2025

GROUND FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 24-06-2025

LOI

Uploaded on: 24-06-2025

HSVP LETTER-39 FOR INDEPENDENT SALE

Uploaded on: 24-06-2025

TERRACE FLOOR PLAN AND AREA DIAGRAM

Uploaded on: 24-06-2025

BASEMENT 04 AREA DIAGRAM

Uploaded on: 24-06-2025

BASEMENT 02 AREA DIAGRAM

Uploaded on: 24-06-2025

ASSURANCE FOR SEWERAGE DISPOSAL

Uploaded on: 24-06-2025

BASEMENT 02 PLAN

Uploaded on: 24-06-2025

CA- INVENTORY CERTIFICATE

Uploaded on: 24-06-2025

Statutory Approvals

BUILDING PLANSDate: 01-05-2025Status: ALREADY BEEN OBTAINED
POSSESSION CERTIFICATEDate: 07-04-2025Status: ALREADY BEEN OBTAINED
ALLOTMENT LETTERDate: 22-01-2025Status: ALREADY BEEN OBTAINED
ZONING PLANDate: 14-01-2025Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: No
Zoning PlanApproved: Yes
Building PlanApproved: Yes
Site PlanApproved: Yes
Floor PlanApproved: Yes
Apartment PlansApproved: Yes
Elevation SectionApproved: Yes
Detail of Permissible FARApproved: Yes
Detail of covered area achieved FARApproved: Yes

Facilities

INTERNAL ROADS AND PAVEMENTSYET TO BE PREPARED
WATER SUPPLY SYSTEMYET TO BE PREPARED
STORM WATER DRAINAGEYET TO BE PREPARED
ELECTRICITY SUPPLY SYSTEMYET TO BE PREPARED
SEWAGE TREATMENT & GARBAGE DISPOSALYET TO BE PREPARED
STREET LIGHTINGYET TO BE PREPARED
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSYET TO BE PREPARED
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERYET TO BE PREPARED
PARKINGYET TO BE PREPARED
SEWERAGE TREATMENT PLANTYET TO BE PREPARED
UNDERGROUND WATER TANKYET TO BE PREPARED
RAIN WATER HARVESTINGYET TO BE PREPARED
SOFT SCAPEYET TO BE PREPARED
HARD SCAPEYET TO BE PREPARED
ELECTRICAL SUB STATIONYET TO BE PREPARED
SIGNAGESYET TO BE PREPARED

NOC

ROADSProvider: GMDAApproval Status: Pending
WATER SUPPLYProvider: MCGApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: MCGApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ROHAN KHANKHOJE
Name
ROHAN KHANKHOJE
PAN
XXXX337C
Email
godrejalira.rera@godrejproperties.com
Mobile
1244842300
Landline
1244842300
Address
A304 Vedant Sapphire Off Ring Road Sneha Nagar Nagpur

Managing Director/CEO

GAURAV PANDEY
Name
GAURAV PANDEY
PAN
XXXX659J
Email
godrejalira.rera@godrejproperties.com
Mobile
0226169850
Landline
02261698500
Address
Villa 150 Block X Tatavam Hills Sector-48 South City II Gurugram

Directors

NADIR GODREJ
Name
NADIR GODREJ
PAN
XXXX643Q
Email
godrejalira.rera@godrejproperties.com
Mobile
0226169850
Landline
02261698500
Address
Opp. Malabar Hill Police Station 40-D BG Kher Marg Malabar Hill Mumbai 400006

Contact Details

Project ContactEmail: godrejalira.rera@godrejproperties.comMobile: 1244842300Landline: 1244842300
Project Contact PersonName: ROHAN KHANKHOJEEmail: godrejalira.rera@godrejproperties.comMobile: 1244842300Landline: 1244842300

Land Details

Land Area1.9745 (Acre)
Proposed FAR311
Permissible FAR312
Total Licensed Land1.9745 (Acre)

Land Usage

Land Cost16048 Lakhs
Other Cost10366 Lakhs
Estimated Project Cost58682 Lakhs
Estimated Infrastructure Cost3185 Lakhs
Estimated Apartment Construction Cost29083 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other0
parking0
signages0
hardscape0
softscape0
Shopping area0
street lighting0
Roads & Pavements0
Water Supply System0
Storm Water Drainage0
Parks and Playgrounds0
electrical substation0
rain water harvesting0
underground water tank0
renewable energy system0
sewerage treatment plant0
Electricity Supply System0
security and fire fighting0
Clubhouse/community centres0
Sewerage treatment & garbage disposal0

Quarterly Infrastructure Expenditure

2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres-000
Electricity Supply System-000
Other-000
Parks and Playgrounds-000
Roads & Pavements-000
Sewerage treatment & garbage disposal-000
Shopping area-000
Storm Water Drainage-000
Water Supply System-000
electrical substation-000
hardscape-000
parking-000
rain water harvesting--00
rainwater harvesting-0--
renewable energy system-000
security and fire fighting-000
sewerage treatment plant-000
signages-000
softscape-000
street lighting-000
underground water tank-000
2026 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00021.79
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
electrical substation0000
hardscape0000
parking0000
rain water harvesting0000
rainwater harvesting----
renewable energy system0000
security and fire fighting0000
sewerage treatment plant0000
signages0000
softscape0000
street lighting0000
underground water tank0000
2027 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres32.6932.6932.6932.69
Electricity Supply System0000
Other0000
Parks and Playgrounds0000
Roads & Pavements0000
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
electrical substation0000
hardscape0000
parking0000
rain water harvesting0000
rainwater harvesting----
renewable energy system0000
security and fire fighting0000
sewerage treatment plant0000
signages0000
softscape0000
street lighting0000
underground water tank0000
2028 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres54.4954.4976.2876.28
Electricity Supply System08.3528.1528.15
Other0000
Parks and Playgrounds0000
Roads & Pavements04.3512.8212.82
Sewerage treatment & garbage disposal0000
Shopping area0000
Storm Water Drainage0000
Water Supply System0000
electrical substation0000
hardscape0000
parking0000
rain water harvesting000-
rainwater harvesting---0
renewable energy system0000
security and fire fighting0000
sewerage treatment plant0000
signages0000
softscape0000
street lighting0000
underground water tank0000
2029 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres76.2876.2876.2865.38
Electricity Supply System28.4628.4627.8428.15
Other0000
Parks and Playgrounds007.17.18
Roads & Pavements12.9612.9612.6812.82
Sewerage treatment & garbage disposal0.662.162.122.14
Shopping area0005.02
Storm Water Drainage1.372.12.052.07
Water Supply System0.270.840.820.83
electrical substation5.9815.9617.9519.95
hardscape0051.3951.39
parking00.031.841.86
rain water harvesting1.31.311.331.33
rainwater harvesting----
renewable energy system0000
security and fire fighting00.1816.5516.83
sewerage treatment plant0.054.724.724.62
signages0000
softscape0000
street lighting01.213.893.93
underground water tank0000
2030 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres54.4954.4954.4954.49
Electricity Supply System28.4628.4627.8428.15
Other0000
Parks and Playgrounds7.257.2511.57.66
Roads & Pavements12.9612.9612.6812.82
Sewerage treatment & garbage disposal2.162.162.122.14
Shopping area6.6913.3725.0825.08
Storm Water Drainage2.12.12.052.07
Water Supply System0.840.840.820.83
electrical substation19.9519.9519.9519.95
hardscape51.3951.3951.3951.39
parking1.881.881.841.86
rain water harvesting1.31.311.331.33
rainwater harvesting----
renewable energy system3.093.093.093.09
security and fire fighting17.0217.0216.6516.83
sewerage treatment plant4.674.724.724.62
signages03.865.025.02
softscape0000
street lighting3.983.863.893.93
underground water tank01.725.085.14
2031 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres54.4943.5932.6932.69
Electricity Supply System28.4628.4627.8410.52
Other0000
Parks and Playgrounds11.57.257.12.85
Roads & Pavements12.9612.9612.688.59
Sewerage treatment & garbage disposal2.162.162.120.75
Shopping area25.0825.0825.0816.72
Storm Water Drainage2.12.12.050.71
Water Supply System0.840.840.820.27
electrical substation19.9519.9519.950
hardscape51.3951.3951.3951.39
parking1.881.881.841.21
rain water harvesting1.30.8500
rainwater harvesting----
renewable energy system3.093.093.093.09
security and fire fighting17.0217.0216.6511.1
sewerage treatment plant4.674.724.724.51
signages5.025.027.726.94
softscape35.0435.0435.0435.04
street lighting3.983.983.891.43
underground water tank5.25.25.083.45
2032 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres00--
Electricity Supply System00--
Other00--
Parks and Playgrounds00--
Roads & Pavements00--
Sewerage treatment & garbage disposal00--
Shopping area00--
Storm Water Drainage00--
Water Supply System00--
electrical substation00--
hardscape00--
parking00--
rain water harvesting00--
rainwater harvesting----
renewable energy system00--
security and fire fighting00--
sewerage treatment plant00--
signages00--
softscape00--
street lighting00--
underground water tank00--

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILING/LAMINATED WOODEN FLOORING/SKID RESISTANT VITRIFIED TILES/WOODEN LOOK SKID RESISTANT TILES
WALL FINISHING DETAILSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
KITCHEN DETAILSFLOOR: VITRIFIED TILES, WALL: TILE CLADDING 2' ABOVE COUNTER AND OIL BOUND DISTEMPER ABOVE THAT, CEILING: OIL BOUND DISTEMPER
BATHROOM FITTINGSSANITARY FIXTURES & FITTINGS OF REPUTE MAKE
WOOD WORK ETCLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
DOORS AND WINDOS FRAMESMAIN DOOR: DESIGNER DOOR SHUTTER WITH VENEER FINISH INTERNAL DOORS: LAMINATED DOOR SHUTTER EXTERNAL DOOR & WINDOWS: GLAZED WINDOWS ALUMINUM/ UPVC/MS FRAME
GLASS WORK4MM AND ABOVE AS PER SPECIFICATIONS
ELECTRIC FITTINGSAS PER BUILDING NORMS
CONDUCTING AND WIRING DETAILSAS PER BUILDING NORMS
CUPBOARD DETAILSNA
WATER STORAGEUNDERGROUND AND OVERHEAD WATER TANKS
LIFT DETAILS3 PASSENGER LIFTS AND 1 SERVICE LIFT
EXTERNAL GLAZINGSNA
WINDOWS/GLAZINGSPOWDER COATED/PAINTED ALUMINUM/UPVC WINDOWS WITH 4MM OR ABOVE THICK GLAZING AS PER SPECIFICATIONS
DOORSLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
MAIN DOORSLAMINATED/PAINTED/POLISHED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
INTERNAL DOORSLAMINATED/PAINTED FLUSH DOORS/ MOULDED SHUTTER WITH WOODEN FRAME
AIR CONDITIONINGAS PER SPECIFICATION OF STANDARD MAKE
ELECTRICAL FITTINGSAS PER SPECIFICATION OF STANDARD MAKE
CNG PIPE LINENA
PROVISION OF WIFI AND BROADBAND FACILITYNA
EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE PAINTS
INTERNAL FINISHING10 TO 12MM THICK PLASTER ON BLOCKWORKS, RCC WALLS AND COLUMNS WITH CEMENT MORTAR OF 1:5

Unit-wise Specifications

TOILET
FLOORANTI SKID CERAMIC TILES
WALLSCERAMIC TILES TILL 7FT ON ALL SIDES AND OIL BOUND DISTEMPER PAINT
CEILINGGRID CEILING
COUNTERSNOT APPLICABLE
SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
FIXTURESNA
KITCHEN
FLOORVITRIFIED TILES
WALLSCERAMIC / VITRIFIED TILES 2'-0" ABOVE COUNTER & OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
COUNTERSALL PROVIDED OF STANDARD COMPANY MAKE
FIXTURESALL PROVIDED OF STANDARD COMPANY MAKE
KITCHEN APPLIANCESNOT APPLICABLE
SIT-OUTS
FLOORANTI SKID CERAMIC TILES
WALLS & CEILINGEXTERNAL GRADE TEXTURE PAINT/ OIL BOUND DISTEMPER
RAILINGSALL PROVIDED OF STANDARD COMPANY MAKE
FIXTURESNA
BED ROOMS
FLOORLAMINATED WOODEN FLOORING
WALLSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
WARDROBESNA
MASTER TOILET
FLOORANTI SKID CERAMIC TILES
WALLSCERAMIC TILES TILL 7FT ON ALL SIDES AND OIL BOUND DISTEMPER PAINT
CEILINGGRID CEILING
COUNTERSSTONE
SANITARY WARE/CP FITTINGSALL PROVIDED OF STANDARD COMPANY MAKE
FITTING/FIXTURESNA
MASTER BEDROOM/DRESSROOM
FLOORVITRIFIED TILES
WALLSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
MODULAR WARDROBESNA
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORVITRIFIED TILES
WALLSACRYLIC EMULSION PAINT/OIL BOUND DISTEMPER
CEILINGOIL BOUND DISTEMPER
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORCERAMIC TILES
WALLS & CEILINGACRYLIC EMULSION/ OIL BOUND DISTEMPER
TOILETOIL BOUND DISTEMPER
BALCONYNA

Fee Details

Payment 1
amount:500000
cheque no:2993
draft date:05-05-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK (002993)
Payment 2
amount:528386
cheque no:796
draft date:09-06-2025
payable to:HRERA Gurugram
payee bank:HDFC BANK (000796)