NEWActive

GLS COURTYARD

GURUGRAM, HARSARU ST
21-08-2023
Launch Date
NEW
Type
2028-07-10
Completion Date

Overview

Launch Date

21-08-2023

Completion Date

2028-07-10

RERA ID

RERA-GRG-1416-2023

Basic Details

Project NameGLS COURTYARD
Project IDRERA-GRG-1416-2023
Project TypeNEW
Applicant TypeCompany
Submission Date21-08-2023 02:06:26 PM
Builder NameGLS INFRAPROJECTS PVT. LTD
CINU70102HR2013PTC051335
PANXXXX795C
Emailashish.drall@glsho.com
Websitehttp://www.glsinfra.in
Phone (Mobile)9717994849
Phone (Landline)01244200577
Registered Address707, 7TH FLOOR, JMD PACIFIC SQUARE, SECTOR-15, PART-II, GURUGRAM, HARYANA
Project AddressREVENUE ESTATE OF VILLAGE DHORKA, SECTOR 95, GURUGRAM, HARYANA
DistrictGURUGRAM
TehsilHARSARU ST

Bank Details

Bank NameICICI BANK LIMITED, AT GF-05-06, JMD PACIFIC SQUARE, SECTOR-15, PART-II, GURUGRAM
Account Number777705227027
IFSC CodeICIC0007693
MICR Code110229355
Branch Code7693

Account Related Information

Annex copy of the balance sheet of last 3 yearsYes
In case of on-going projects,cash flow statement since start of the project up-to-date in folder D.Total receipt of funds, sources of funds and deployment of funds should be stated in tabulated form.No
Name and address of the person/persons who would ordinarily be operating the account (Change at any time must be intimated to the Authority)Mr Surinder Singh at 707, 7rd Floor, JMD Pacific Square, Sector-15, Part-II, Gurugram, Haryana
Attach certificate issued by a Chartered Accountant that the applicant has not defaulted in its debt liabilities in the past five years in folder D. (In case of default, give details)Attached

Development Details

Land Area3.8375 (Acre)
Proposed FAR1.5
Permissible FAR1.5
Total Licensed Land3.8375 (Acre)

Land Usage

PLOTS TO BE SOLD5435.403
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
CONSTRUCTION OF ROADS2540.254
PAVEMENTS0
PARKS AND PLAYGROUNDS0
GREEN BELTS1225.54
VEHICLE PARKINGS3015.42
ELECTRICITY SUB-STATION0
CLUB HOUSE0
SEWAGE AND SOLID WASTE TREATMENT FACILITY0
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
ANY OTHER0
INTERNAL3258.990
UTILITY54.180
Total15529.787

Cost Details

Land Cost2993.01 Lakhs
Other Cost3692.33 Lakhs
Estimated Project Cost7530.43 Lakhs
Estimated Infrastructure Cost845.09 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Documents

IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN

Uploaded on: 15-07-2023

LOI

Uploaded on: 15-07-2023

LICENSE NO. 103 OF 2021 DATED 08.12.2021

Uploaded on: 17-08-2023

POWER ASSURANCE

Uploaded on: 17-08-2023

LC IV & BILATERAL AGGREMENT

Uploaded on: 17-08-2023

LC IV & BILATERAL AGREEMENT ADD.

Uploaded on: 17-08-2023

LOI DATED

Uploaded on: 17-08-2023

ZONING PLAN

Uploaded on: 17-08-2023

IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN

Uploaded on: 17-08-2023

A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS

Uploaded on: 17-08-2023

DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD

Uploaded on: 17-08-2023

JAMABANDI

Uploaded on: 17-08-2023

MUTATION

Uploaded on: 17-08-2023

NON ENCUMBRANCE CERTIFICATE

Uploaded on: 17-08-2023

FOREST NOC

Uploaded on: 17-08-2023

COLLABORATION AGREEMENT RAJENDER

Uploaded on: 17-08-2023

COLLABORATION AGREEMENT MAYA DEVI

Uploaded on: 17-08-2023

SPA RAJENDER

Uploaded on: 17-08-2023

SPA MAYA DEVI

Uploaded on: 17-08-2023

SALE DEED 21 KANAL 1 MARLA

Uploaded on: 17-08-2023

SALE DEED 2 KANAL 12 MARLA

Uploaded on: 17-08-2023

MOA

Uploaded on: 17-08-2023

AOA

Uploaded on: 17-08-2023

PAN

Uploaded on: 17-08-2023

SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN

Uploaded on: 17-08-2023

SEWRAGE LAYOUT

Uploaded on: 17-08-2023

STORM LAYOUT

Uploaded on: 17-08-2023

SERVICE ESTIMATE

Uploaded on: 17-08-2023

SUPERIMPOSED DEMARCATION

Uploaded on: 17-08-2023

COPY OF LICENSE ALONG WITH SCHEDULE OF LAND

Uploaded on: 18-08-2023

DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.

Uploaded on: 19-08-2023

ASSURANCE STORM WATER

Uploaded on: 18-08-2023

SEARCH REPORT

Uploaded on: 19-08-2023

ASSURANCE WATER SUPPLY

Uploaded on: 18-08-2023

AKS SIZRA

Uploaded on: 18-08-2023

PROJECT REPORT

Uploaded on: 19-08-2023

NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT

Uploaded on: 19-08-2023

STP WATER NOC

Uploaded on: 18-08-2023

PERT CHART

Uploaded on: 19-08-2023

ELECTRICITY PLAN

Uploaded on: 21-08-2023

CA CERTIFICATE COST

Uploaded on: 19-08-2023

ASSURANCE SEWERAGE

Uploaded on: 18-08-2023

STREET LIGHT PLAN

Uploaded on: 21-08-2023

CASH FLOW STATEMENT OF THE PROPOSED PROJECT

Uploaded on: 19-08-2023

BANK UNDERTAKING

Uploaded on: 19-08-2023

CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT

Uploaded on: 19-08-2023

DEMARCATION PLAN

Uploaded on: 19-08-2023

DEMAND DRAFT

Uploaded on: 21-08-2023

F 11 FLOOR PLAN

Uploaded on: 28-05-2024

B1 SECTION & ELEVATION

Uploaded on: 28-05-2024

E2 SECTION & ELEVATION

Uploaded on: 28-05-2024

A11 FLOOR PLAN

Uploaded on: 28-05-2024

D5 FLOOR PLAN

Uploaded on: 28-05-2024

C 3 TO C 12 SECTION & ELEVATION

Uploaded on: 28-05-2024

E2 FLOOR PLAN

Uploaded on: 28-05-2024

F3 SECTION & ELEVATION

Uploaded on: 28-05-2024

A11 SECTION & ELEVATION

Uploaded on: 28-05-2024

B 10 FLOOR PLAN

Uploaded on: 28-05-2024

A2 TO A10, B2 TO B 9 SECTION & ELEVATION

Uploaded on: 28-05-2024

F 11 SECTION & ELEVATION

Uploaded on: 28-05-2024

SERVICE PLAN- STORM LAYOUT

Uploaded on: 28-05-2024

E1 SECTION & ELEVATION

Uploaded on: 28-05-2024

F2 FLOOR PLAN

Uploaded on: 28-05-2024

C 1 SECTION & ELEVATION

Uploaded on: 28-05-2024

E3 FLOOR PLAN

Uploaded on: 28-05-2024

C 3 TO C 12 FLOOR PLAN

Uploaded on: 28-05-2024

SERVICE ESTIMATES BOOKLET

Uploaded on: 28-05-2024

SERVICE PLAN- ROAD LAYOUT

Uploaded on: 28-05-2024

SERVICE PLAN- WATER SUPPLY LAYOUT

Uploaded on: 28-05-2024

C 13 SECTION & ELEVATION

Uploaded on: 28-05-2024

SERVICE PLAN- SEWER LAYOUT

Uploaded on: 28-05-2024

SERVICE PLAN & ESTIMATES APPROVAL LETTER

Uploaded on: 28-05-2024

A 1 FLOOR PLAN

Uploaded on: 28-05-2024

A 1 SECTION & ELEVATION

Uploaded on: 28-05-2024

D2 TO D4 FLOOR PLAN

Uploaded on: 28-05-2024

A2 TO A10, B2 TO B 9 FLOOR PLAN

Uploaded on: 28-05-2024

B 1 FLOOR PLAN

Uploaded on: 28-05-2024

C 1 FLOOR PLAN

Uploaded on: 28-05-2024

C 2 FLOOR PLAN

Uploaded on: 28-05-2024

C 2 SECTION & ELEVATION

Uploaded on: 28-05-2024

C 13 FLOOR PLAN

Uploaded on: 28-05-2024

D 2 TO D4 SECTION & ELEVATION

Uploaded on: 28-05-2024

D1 FLOOR PLAN

Uploaded on: 28-05-2024

D1 SECTION & ELEVATION

Uploaded on: 28-05-2024

D5 SECTION & ELEVATION

Uploaded on: 28-05-2024

E1 FLOOR PLAN

Uploaded on: 28-05-2024

E3 SECTION & ELEVATION

Uploaded on: 28-05-2024

F1 FLOOR PLAN

Uploaded on: 28-05-2024

F1 SECTION & ELEVATION

Uploaded on: 28-05-2024

F2 SECTION & ELEVATION

Uploaded on: 28-05-2024

F3 FLOOR PLAN

Uploaded on: 28-05-2024

F4 TO F 10 SECTION & ELEVATION

Uploaded on: 28-05-2024

F4 TO F10 FLOOR PLAN

Uploaded on: 28-05-2024

LAYOUT CUM DEMARCATION PLAN

Uploaded on: 28-05-2024

STANDARD DESIGN APPROVAL LETTER

Uploaded on: 28-05-2024

Statutory Approvals

LICENSE 103 OF 2021Date: 08-12-2021Status: ALREADY BEEN OBTAINED
LICENSE 145 OF 2023Date: 11-07-2023Status: ALREADY BEEN OBTAINED
LAYOUT PLAN APPROVALDate: 12-07-2023Status: ALREADY BEEN OBTAINED
SERVICE PLAN ESTMATESDate: 03-04-2024Status: ALREADY BEEN OBTAINED
STANDARD DESIGNDate: 02-04-2024Status: ALREADY BEEN OBTAINED
Lay out PlanApproved: Yes
Demarcation PlanApproved: Yes
Zoning PlanApproved: No
Building PlanApproved: No
Site PlanApproved: Yes
Floor PlanApproved: No
Apartment PlansApproved: No
Elevation SectionApproved: No
Detail of Permissible FARApproved: No
Detail of covered area achieved FARApproved: No

Facilities

INTERNAL ROADS AND PAVEMENTSSUBMITTED TO HUDA
WATER SUPPLY SYSTEMSUBMITTED TO HUDA
STORM WATER DRAINAGESUBMITTED TO HUDA
ELECTRICITY SUPPLY SYSTEMSUBMITTED TO HUDA
SEWAGE TREATMENT & GARBAGE DISPOSALSUBMITTED TO HUDA
STREET LIGHTINGSUBMITTED TO HUDA
SECURITY AND FIRE FIGHTINGYET TO BE PREPARED
PLAYGROUNDS AND PARKSSUBMITTED TO HUDA
CLUB HOUSE/COMMUNITY CENTREYET TO BE PREPARED
SHOPPING AREAYET TO BE PREPARED
RENEWABLE ENERGY SYSTEMYET TO BE PREPARED
SCHOOLYET TO BE PREPARED
HOSPITAL/DISPENSARYYET TO BE PREPARED
ANY OTHERSUBMITTED TO HUDA

NOC

ROADSProvider: GMDAApproval Status: Approved
WATER SUPPLYProvider: GMDAApproval Status: Approved
ELECTRICITYProvider: DHBVNApproval Status: Approved
SEWAGE DISPOSALProvider: GMDAApproval Status: Approved
STORM WATER DRAINAGEProvider: GMDAApproval Status: Approved

Project Team

Authorized Representative

ASHISH DRALL
Name
ASHISH DRALL
PAN
XXXX415A
Email
ashish.drall@glsho.com
Mobile
9717994849
Landline
01244200577
Address
707 7th Floor JMD Pacific Square Sector-15 Part-II GURUGRAM

Managing Director/CEO

SURINDER SINGH
Name
SURINDER SINGH
PAN
XXXX525M
Email
surinderfca@glsho.com
Mobile
9717994849
Landline
01244200577
Address
Apartment No. 10B Elite Tower-P Subhash Chowk Sector-48 Belgravia Central Park II Gurgaon-122001

Directors

RAJESH GOYAL
Name
RAJESH GOYAL
PAN
XXXX855H
Email
rajesh@glsind.com
Mobile
9717994849
Landline
01244200577
Address
263 Sector -14 Gurgaon Haryana-122001

Contact Details

Project ContactEmail: customercare@glsho.comMobile: 9717994849Landline: 01244200577
Project Contact PersonName: ASHISH DRALLEmail: ashish.drall@glsho.comMobile: 9711478994Landline: 01244200577

Land Details

Land Area3.8375 (Acre)
Proposed FAR1.5
Permissible FAR1.5
Total Licensed Land3.8375 (Acre)

Land Usage

Land Cost2993.01 Lakhs
Other Cost3692.33 Lakhs
Estimated Project Cost7530.43 Lakhs
Estimated Infrastructure Cost845.09 Lakhs
Estimated Apartment Construction Cost0 Lakhs

Total Infrastructure Expenditure

ParticularsExpenditure (in Lakhs)
Other4.27
Shopping area0
Roads & Pavements79.89
Water Supply System27
Storm Water Drainage8
Parks and Playgrounds0
Electricity Supply System70
Clubhouse/community centres0
Sewerage treatment & garbage disposal27.08

Quarterly Infrastructure Expenditure

2023 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres--00
Electricity Supply System--1520
Other--00
Parks and Playgrounds--00
Roads & Pavements--015
Sewerage treatment & garbage disposal--55
Shopping area--00
Storm Water Drainage--00
Water Supply System--55
2024 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System26.519.52017.5
Other0000
Parks and Playgrounds0000
Roads & Pavements15151515
Sewerage treatment & garbage disposal5555
Shopping area0000
Storm Water Drainage0888
Water Supply System10101011
2025 - Quarterly Expenditure (In Lakhs)
ParticularsJan-MarApr-JuneJuly-SepOct-Dec
Clubhouse/community centres0000
Electricity Supply System202116.728.8
Other000180.72
Parks and Playgrounds0002.32
Roads & Pavements10871.29
Sewerage treatment & garbage disposal555.830
Shopping area0000
Storm Water Drainage85.170.50
Water Supply System10555

Other Details

Construction Specifications

FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA BEING PLOTTED COLONY
WALL FINISHING DETAILSNA BEING PLOTTED COLONY
KITCHEN DETAILSNA BEING PLOTTED COLONY
BATHROOM FITTINGSNA BEING PLOTTED COLONY
WOOD WORK ETCNA BEING PLOTTED COLONY
DOORS AND WINDOS FRAMESNA BEING PLOTTED COLONY
GLASS WORKNA BEING PLOTTED COLONY
ELECTRIC FITTINGSNA BEING PLOTTED COLONY
CONDUCTING AND WIRING DETAILSNA BEING PLOTTED COLONY
CUPBOARD DETAILSNA BEING PLOTTED COLONY
WATER STORAGENA BEING PLOTTED COLONY
LIFT DETAILSNA BEING PLOTTED COLONY
EXTERNAL GLAZINGSNA BEING PLOTTED COLONY
WINDOWS/GLAZINGSNA BEING PLOTTED COLONY
DOORSNA BEING PLOTTED COLONY
MAIN DOORSNA BEING PLOTTED COLONY
INTERNAL DOORSNA BEING PLOTTED COLONY
AIR CONDITIONINGNA BEING PLOTTED COLONY
ELECTRICAL FITTINGSNA BEING PLOTTED COLONY
CNG PIPE LINENA BEING PLOTTED COLONY
PROVISION OF WIFI AND BROADBAND FACILITYNA BEING PLOTTED COLONY
EXTERNAL FINISHING/COLOUR SCHEMENA BEING PLOTTED COLONY
INTERNAL FINISHINGNA BEING PLOTTED COLONY

Unit-wise Specifications

TOILET
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
COUNTERSNA BEING PLOTTED COLONY
SANITARY WARE/CP FITTINGSNA BEING PLOTTED COLONY
FIXTURESNA BEING PLOTTED COLONY
KITCHEN
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
COUNTERSNA BEING PLOTTED COLONY
FIXTURESNA BEING PLOTTED COLONY
KITCHEN APPLIANCESNA BEING PLOTTED COLONY
SIT-OUTS
FLOORNA BEING PLOTTED COLONY
WALLS & CEILINGNA BEING PLOTTED COLONY
RAILINGSNA BEING PLOTTED COLONY
FIXTURESNA BEING PLOTTED COLONY
BED ROOMS
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
WARDROBESNA BEING PLOTTED COLONY
MASTER TOILET
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
COUNTERSNA BEING PLOTTED COLONY
SANITARY WARE/CP FITTINGSNA BEING PLOTTED COLONY
FITTING/FIXTURESNA BEING PLOTTED COLONY
MASTER BEDROOM/DRESSROOM
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
MODULAR WARDROBESNA BEING PLOTTED COLONY
LIVING/DINING/FOYER/FAMILY LOUNGE
FLOORNA BEING PLOTTED COLONY
WALLSNA BEING PLOTTED COLONY
CEILINGNA BEING PLOTTED COLONY
UTILITY ROOMS/UTILITY BALCONY/TOILET
FLOORNA BEING PLOTTED COLONY
WALLS & CEILINGNA BEING PLOTTED COLONY
TOILETNA BEING PLOTTED COLONY
BALCONYNA BEING PLOTTED COLONY

Fee Details

Payment 1
amount:227000
cheque no:500274
draft date:21-08-2023
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 2
amount:166456
cheque no:500279
draft date:19-09-2023
payable to:HRERA Gurugram
payee bank:ICICI BANK
Payment 3
amount:718000
cheque no:498269
draft date:04-01-2022
payable to:HRERA Gurugram
payee bank:ICICI BANK