Demarcation of Project to be done at site.
Boundary wall will be constructed by Brickwork/ MS Railing as per requirement and designed by promoter.
Internal drive way 6 mtr wide, will be developed by RCC/ Interlocking Pavers / Bitumen as per approved layout , as per Requirement and designed by promoter
Both sides of road , Footpath will be developed ,width 1.0 to 1.5 mtr. as per requirement and designed by promoter.
Water supply including drinking water facilities will be provided by promoter through Roof tank / Bore well.
Common S.T.P. will be constructed for GH-1 , at site for Sewer Disposal.
Drainage system will be developed and connected with RWH and over flow will be constructed with Existing Drains.
Common Parks /Green area approx 5000 sqm will be developed in Gh-1 . And will be developed as per approved plan and requirements.
Required Tree approx225 nos , will be planted in Gh-1 within parks , road side and boundary, as per requirement and norms.
Electric Supply will be provided fromm ESS. Street Lights will be fixed at road berms as per requirement norms.
Common Community Building as per Approved layout, will be provided for GH-1.
S.T.P. will be constructed for Gh-1 , and treated water will be use in irrigation of green areas and as per govt. norms.
Solid waste management and disposal system will be provided as per requirement and Govt. Norms
Water Conservation System will be provided as per Govt. Norms.
Energy management system will be provided as per Govt. Norms
Fire Safety System will be provided as per approval , Design and Norms.
As per integrated township policy.
As per fire norms 6 metre and above road proposed.
As per specification finalize by the approved map all works will be developed.
Showing 1 blocks with 24 units
Total Carpet Area
7475.92 m²
80470.06 ft²
Total Units
48
1 different types
Blocks & Floors
1
24 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
6191.69 m²
66646.73 ft²