NewActive

Geetika Kingdoms

Kanpur Nagar, Uttar Pradesh
10-08-2022
Launch Date
New
Type
30-06-2027
Completion Date

Overview

Launch Date

10-08-2022

Completion Date

30-06-2027

RERA ID

UPRERAPRJ325813

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12768
Project NameGeetika Kingdoms
Registration Fee (in Rs.)69000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)59
DistrictKanpur Nagar
Original Start Date-
TehsilKanpur
Proposed Start Date10-08-2022
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)12548
Proposed Completion Date30-06-2027

Location

Latitude

26.4843861

Longitude

80.2553737

Bank Details

Account Details
Name of the AccountGEETIKA BUILDERS AND DEVELOPERS COLLECTION AC GEETIKA KINGDOMS
Account Number41229584399
Bank NameSTATE BANK OF INDIA
Branch NameSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch AddressSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeSBIN0001080
Separate Account Details
Name of the AccountGEETIKA BUILDERS AND DEVELOPERS SEPARATE AC GEETIKA KINGDOMS
Account Number41229221903
Bank NameSTATE BANK OF INDIA
Branch NameSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch AddressSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeSBIN0001080
Transaction Account Details
Name of the AccountGEETIKA BUILDERS AND DEVELOPERS TRANSACTION AC GEETIKA KINGDOMS
Account Number41229590062
Bank NameSTATE BANK OF INDIA
Branch NameSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch AddressSME BRANCH, CO-OP, INDUSTRIAL ESTATE, KANPUR
Branch StateUttar Pradesh
Branch DistrictKanpur Nagar
IFSC CodeSBIN0001080

Development Works

Demarcation of Plots

We have plot of size 12,768 sq. mtr. having main entrance gate from the 24 m wide front road.

Boundary Wall

2.4m high (including grill) and 230 mm thick Brick work and RCC work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.

Road Work

From the main entrance gate we have interlocking brick /RCC road through out the project. Whose wideness is 6 mtr.

Footpaths

We would not provide any footpath.

Water Supply Including Drinking Water Facilities

We will take supply from Kanpur Jal Nigam for fulfilling water supply. We shall also use pump for water supply.

Sewer System

Modular Sewerage system shall be Provided. All Sewerage water shall go to the STP and overflow from the STP shall be connected with the Municipal sewerage system, when comes into force.

Drain

Storm water Drainage System shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting pit to recharge the Ground water and overflow shall be connected with Municipal drain line.

Parks

"We will provide green area with the different activities and the green area will have gaming facilities for kids. Total Green area will be around 1406 sq. Metres"

Tree Planting

We will provide many type of trees all along the boundary wall & green area.

Design For Electric Supply Including Street Lighting

We will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG backup for common service like External lighting, STP, Pump room etc.

Community Buildings

Community Building is available at Block C in Stilt Floor. Area around 207 sq. metres.

Treatment and Disposal System of Sewage and Sullage water

Modular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connected with the Municipal sewerage system.,when comes into force.

Solid Waste Management And Disposal System

There is a proper garbage collection area provided for solid waste management.

Water Conservation System

We will suggest individuals to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In Pump room also, all the equipment shall have energy efficient motor. And we will suggest individual as well to use energy efficient equipments.

Fire Protection And Fire Safety System

We will provide Fire Fighting facility in common areas like basement. While Individual owner can install their own system as per their own and local authorities requirement.

Social Infrastructure And Other Public Amenities Including Public Health Services

Swimming pool in stilt floor shall be provided.

Emergency Evacuation Services

Fire staircases shall be there.

Other Miscellaneous Work

Not proposed.

Documents

Sale Deed

No: 2475 | Date: 28-04-2017

Sale Deed

No: 5910 | Date: 27-06-2018

Allotment Letter issued by Competent Authority

No: 2089 | Date: 11-09-2018

Allotment Letter issued by Competent Authority

No: 2090 | Date: 11-09-2018

Extract of Khatauni

No: Land Area Chart - Geetika Kingdoms | Date: -

Extract of Khatauni

No: Aadhar of Promoters | Date: -

Extract of Khatauni

No: Advocate Experience Letter_Geetika | Date: -

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 15-09-2022

Commencement Certificate

Uploaded: 03-09-2022

Other Plan(If Any)

Uploaded: 03-09-2022

Proforma of Application Form

Uploaded: 05-09-2022

Proforma of Allotment Letter

Uploaded: 05-09-2022

Proforma of Conveyance Deed

Uploaded: 05-09-2022

Waste Disposal Plan

Uploaded: 03-09-2022

Water Supply Plan

Uploaded: 03-09-2022

Electricity Supply Plan

Uploaded: 03-09-2022

Development Work Plan

Uploaded: 03-09-2022

Affidavit

Uploaded: 03-09-2022

CA CERTIFICATE

Uploaded: 05-09-2022

ARCHITECT CERTIFICATE

Uploaded: 03-09-2022

ENGINEERS CERTIFICATE

Uploaded: 03-09-2022

Other

Uploaded: 03-09-2022

Permits

Orignal Permit NoHigh Risk/UPAVP/BP/20-21/1161/28122021
Orignal Permit Date10-08-2022
Valid Upto09-08-2027
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-08-2030
End Date30-06-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameArun Kumar
Architect Address112/281, Swaroop Nagar, Kanpur, U.P.
Architect Licence NumberCA/94/17629
Structural Engineer NameSuyash Singh
Structural Engineer Address44-D, Kidwai Nagar, Kanpur, U.P.
Mobile number(Project Co-ordinator)8400520960

Land Details

AFS

Showing 4 blocks with 282 units

Property Summary

Total Carpet Area

22685.40 m²

244183.38 ft²

Total Units

284

4 different types

Blocks & Floors

4

10 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:79.88 m²
Balconies:552
Parking ratio:0.00 per unit

Block Tower A

73 units

Block Tower B

73 units

Block Tower C

71 units

Block Tower D

65 units

Khasra Details

Total Area

12768.00 m²

137433.48 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-2 and 3, Ambedkarpuram, Kanpur
Area(In Sq. Mt.)12768

Other Details

Contractor Name (if any)Self
Contractor AddressSelf
Architect NameArun Kumar
Architect Address112/281, Swaroop Nagar, Kanpur, U.P.
Architect Licence NumberCA/94/17629
Structural Engineer NameSuyash Singh
Structural Engineer Address44-D, Kidwai Nagar, Kanpur, U.P.
Mobile number(Project Co-ordinator)8400520960